PROJECT E
professional complete bu edited, or om determine if panies, assu and all liabil tion related d
SECTIO
HVAC
PART 1 - G1.1 A. Note to Sp call for se operating t
B.
1.2
A.
ENGINEER RES
ls, in conjunction uilding specificati mitted based on t a product or sys ume any respons ity for any errors details, whether
ON 22 07
PIPING I
GENERALSUMMARY Section Includ pecifier: The fo ervice tempera temperature lim
1. Cold P 2. Dual Te 3. Heating 4. Domes Items Not Insu 1. Drainag 2. Underg 3. Chrome
REFERENCES Materials shal
to the specific 1. Americ
a. b. c. d.
SPONSIBILITY: T n with good const
on that is to be f the requirements stem is suitable fo sibility for the con or omissions in based upon the
7 19
NSULATI
es: Provide th ollowing temper
tures outside mitations of the iping Systems emperature Sy g Systems (ste stic and Service ulated: Unless o ge piping locate ground piping.
e-plated pipes
S
l meet the prop product or end can Society for ASTM C547, S ASTM C585, for Nominal Si ASTM C795, Austenitic Stai ASTM C921, Thermal Insula
This is a general truction practice ully reviewed an s of a specific pro
or its intended us ntent of this spec
design, detail, st information prov
ION
e following: rature ranges a
the ranges lis insulation prod (chilled water, ystems, 32°F (0 eam, steam con e Hot Water Sy otherwise indic ed in crawl spa and fittings un
perty requireme d use:
Testing of Mat Standard Spec Standard Prac zes of Pipe an Standard Sp inless Steel.
Standard Prac ation.
specification gu and professiona d edited by the e oject. It is the re se. Neither Owe cification guide re tructural capabili vided by Owens C
are typical for sted, consult t duct or product brine, refrigera 0°C) to 220°F ( ndensate, hot w ystems, ambien cated, do not in aces.
less there is a
ents of one or terials (ASTM): cification for Min ctice for Inner a d Tubing (NPS pecification for ctice for Deter
uide, intended to al judgment. This
engineer. Sectio esponsibility of bo
ens Corning, nor elative to actual p ty, attachment d Corning or otherw
these systems the manufactu ts under consid ant), 32°F (0°C (104°C). water), ambien nt up to 180°F nstall insulation
potential for pe
more of the fo :
neral Fiber Pip and Outer Diam S System).
r Thermal Ins rmining the Pro
be used by expe s guide is to aid i ons of this guide s
oth the specifier any of its subsid projects and spe etails, shop draw wise.
s. However, if rer's published deration. C) to 65°F (18°C
t up to 450°F ( (82°C). n on the followin
ersonnel injury
llowing specific
pe Insulation. meters of Rigid sulation for U
operties of Jac
erienced constru in the creation of should be includ and the purchas diary or affiliated ecifically disclaim wings or other co
project require d data to dete C).
232°C). ng:
y.
cations as app
d Thermal Insu Use in Contac
cketing Materi
ction f a
ed, er to
com-m any
onstruc-ements ermine
licable
ulation ct with
1.3
A.
1.4
A.
1.5
A.
B.
1.6
A.
B.
C. D.
e. f. g. h. i. 2. Underw
a.
DEFINITIONS
The term "min or slag proces
SYSTEM PER
Insulation mat American Soc Efficient Desig protection are factor.
ADMINISTRA
Coordination: Division 23 Se 1. Coordin 2. Coordin Scheduling: S installing and t
SUBMITTALS
Product Data: instructions, fo 1. For adh Shop Drawing 1. Detail a Sustainable De Qualification D
ASTM C1136 Thermal Insula ASTM C1393, Sheet Therma ASTM C1729, ASTM D1784, Chlorinated Po ASTM E84, St writers Laborato
UL 723, Test f
S
eral fiber" as d sed from a mo
RFORMANCE
erials furnished iety of Heating gn of New Buil to be conside
ATIVE REQUIR
Coordinate s ection “Hangers nate clearance nate installation Schedule insula testing heat tra
S
Submit produ or each type of hesives and se
s:
application of p esign Submitta Data: For Insta
, Standard Sp ation.
, Standard Spe al Insulation for
Standard Spe Standard Spe oly (Vinyl Chlor tandard Test M ories (UL) for Surface Bur
efined by the a lten state, with
d and installed , Refrigeration dings." Howe ered, the select
REMENTS
size and locat s and Supports e requirements n and testing o ation applicatio acing.
uct characterist product indica ealants, submit
protective shield als: Submit ma
ller.
pecification for ecification for
Pipes and Tan ecification for A ecification for R
ride) (CPVC) C Method for Surfa rning Characte
above specifica h or without bind
hereunder sho , and Air Cond ver, if other fa tion of the thic
tion of support s of HVAC Pipin
with piping ins of heat tracing. on after press
tics, performan ted.
documentation
ds, saddles, an anufacturer’s su
Flexible, Low Perpendicularl nks.
Aluminum Jacke Rigid Poly (Viny Compounds.
ace Burning Ch eristics of Buildi
ations includes der.
ould meet the m itioning Engine actors such as ckness of insul
rts, hangers, a ng and Equipm staller for piping sure testing sy
nce criteria, an n including prin
nd inserts at ha ustainable des
w Permeance V ly Oriented Mi eting for Insula yl Chloride) (PV haracteristics o ing Materials.
fibers manufa
minimum thickn eers ASHRAE
condensation lation should s
and insulation ment.”
g insulation app ystems and, w
nd limitations, nted statement
angers. ign certification
Vapor Retarde neral Fiber Ro tion.
VC) Compound of Building Mat
ctured of glass
ness requireme 90.1 (2010), "E control or pers satisfy the cont
shields specif plication. where required
including insta t of VOC conte
ns as specified ers for oll and ds and terials.
s, rock,
ents of Energy sonnel trolling
fied in
d, after
allation nt.
1.7
A.
1.8
A. B. C.
PART 2 - P 2.1
A.
2.2
A.
B.
C.
QUALITY ASS
Installer Qualif install manufac
DELIVERY AN
Delivery: Deliv Storage: Store location. Prote Do not install i 1. An exc
insulati operati comple assista
PRODUCTS MANUFACTU
Owens Cornin
INSULATION
General: 1. Produc 2. Owens flame r 3. Insulati to AST Certifications: 1. Only O
Indoor 2. Owens recycle 3. Owens and Ta 4. No Wra
VaporW Bronze 5. These Molded Fibrou and ASTM C5 One of the follo
SURANCE
fications: A qu cturer's produc
ND STORAGE
ver materials in e and protect p ect insulation m nsulation that h ception may b
on when fully ng temperatur etely dry insul
nce.
URER
gInsulating Sy
MATERIALS
cts shall not con Corning® pipe etardant subst ion materials fo M C795.
Owens Corning Air Quality Cer Corning® pipe ed glass conten Corning® pipe nk Insulation). ap FIBERGLA Wick®, Evolutio e Level Materia products Envir us Glass Pipe I 585, for sizes r owing types sh
ualified installer cts.
OF MATERIA
n manufacturer products in acc materials from m
has been dama be allowed in
dried out (eithe res) will provid
lation. In su
ystems, LLC, T
ntain asbestos e insulation is n
ances, such as or use on aust
®SSL II® with
rtified® and GR e products are nt, 31% pre-con
e products are AS™ Pipe Insu on™, ASJ) hav l Health Certific ronmental Prod
nsulation: Com required and o hall be used:
r who has been
ALS
r’s original pack cordance with m
moisture and s aged or wet. R
cases where er before insta e installed per ch cases, con
Toledo, OH 436
, lead, mercury not known to c s deca-Bromine tenitic stainless
ASJ Max and REENGUARD G
certified by SC nsumer and 22 e UL listed and
lation and Jac ve received the
cate.
duct Declaration mply with AST
f a type suitab
n trained by an
kaging. manufacturer’s soiling. Remove it from
the contractor allation or afterw
rformance that nsult the insu
659; www.owe
y, or mercury c contain penta-,
e (deca-BDE). s steel shall be
d VaporWick® Gold Certified.
CS Global Serv 2% post-consum
d labeled (exc cketed FIBERG e Cradle to Cra n (EPD) has be M C547, Type ble for installati
nd is acceptabl
s instructions. S jobsite. r is able to de rward following
t is equivalent ulation manufa
enscorning.com
compounds. octa, or deca-e qualifideca-ed as a
pipe products vices to contain mer (except Fle ept Flexwrap® GLAS™ Pipe I adle Products een certified by
I, Grade A; an ion on piping s
le to manufactu
Store in a dry in
emonstrate tha exposure to s
in respects to acturer for tec
m.
-brominated dip acceptable acc
are GREENG n a minimum o exwrap® Insula
®
Insulation and nsulation (ASJ Innovation Ins y UL Environm nd Type IV, Gra
systems as req urer to
ndoors
at wet system o new, chnical
phenyl cording
UARD of 53% ation).
d Pipe J Max, titute's ent. ade B; quired.
D.
E.
2.3
A.
B.
C.
2.4 A.
1. For ind schedu a. 2. For sys 3. For sys above t a. 4. For sys
a. Perpendicular 1. For pip
(454°C a. Perpendicular 1. For pip
(343°C a.
FIELD-APPLIE
General: Field 1. At Belo 2. At Abov PVC Jackets: 1. Accept Aluminum Jac moisture barrie 1. Accept ACCESSORY Accessories: following: 1. Closure
tapes. a. 2. Field-A
PVC fit 3. Suppor
door systems o ule:
Owens Cornin stems operating
stems operatin the ambient tem
Owens Cornin stems operating
Owens Cornin Pipe Insulation Oriented Mine ping equal to or C):
Owens Cornin Oriented Mine ping equal to or C):
Owens Cornin
ED JACKETS
d-applied jacke ow-Ambient Te ve-Ambient Te ASTM D1784 able Manufactu ckets: ASTM C er factory-heat-able Manufactu MATERIALS
Provide acces e Materials: Bu
Mold resistant Applied Jacketin
tting covers. rt Materials: H
operating at te ng® SSL II® with
g at temperatu ng at tempera
mperature: ng® No Wrap P
g below ambie ng® VaporWick n)
eral Fiber Insula r larger than 10 ng® Flexwrap® F eral Fiber Insula r larger than 10 ng® FIBERGLA
ets shall comply mperatures: Ty emperatures: Ty , Class 16354-urer: Proto Co C1729, Class -laminated to th urer: ITW Insu
ssories per ins utt strips, band
mastics are re ng Materials: S anger straps, h
mperatures fro h ASJ Max FIB res up to +850 tures to +100 ipe Insulation. nt (32°F (0°C) k® Pipe Insulat ation: ASTM C 0 in (250 mm) FIBERGLAS™ ation: ASTM C 0 in (250 mm) AS™ Pipe and T
y with ASTM C ype I.
ype II, where a C; 0.020 in thic orp., Clearwate
A, 0.016 in th he interior surfa ulation Systems
ulating system ds, wires, stap ecommended fo
Sheet metal, pl hanger rods, sa
om 0°F (-18°C BERGLAS™ Pi 0°F (232°C), no
0°F (538°C) w to +65°F (18°C tion. (see HVA 1393, Type IIIB diameter opera ™ Insulation.
1393, Type II, diameter opera Tank Insulation
C1136; Type I o a vapor barrier ck PVC jacketi r, FL 33762; w hick aluminum face.
s, Houston, TX
m manufacturer ples, mastics, or chilled wate lastic, canvas, addles, suppor
) to +1000°F ( pe Insulation. o heat up-sched with heat-up s C)) temperature AC Piping Insu
B, Category 2: ating at tempe
Category 1: ating at tempe n.
or Type II. is not required ng and fitting c www.protocorpo jacket with 3 X 77022; www.i
r’s recommend adhesives, an r applications. fiberglass clot rt rings, and hig
(538°C) with h dule required. chedule and a e:
ulation – Vapor
ratures up to +
ratures up to +
. covers. oration.com
mil thick poly twinsulation.co
dations, includi nd pressure-se th, insulating ce gh density inse
eat-up
always
rWick®
+850°F
+650°F
ysurlyn om
ng the nsitive ement,
B.
PART 3 - E
3.1 A. B.
C.
3.2
A. B.
C.
3.3
A.
3.4
A.
Adhesives Fo 40 CFR 59, Su
EXECUTION
EXAMINATION Verify that ma material manu Verify, by insp shipments, th specifications Before starting verify that suc section can be
PREPARATIO
Ensure that su Ensure that in weather barrie installation. Ensure that pr
SAFETY PRE
Insulation con shall include p limited to, disp
INSTALLATIO
General: Insta manufacturer's 1. Install i 2. Install i
with ful scraps surface 3. Mainta
against compat
4.
On col barrieror Indoor App ubpart D (EPA
N
aterials and a facturers' reco pecting produc hat materials
and standards g work under t ch work is com egin.
ON
urfaces over wh nsulation is cl ers intact and ressure testing
CAUTIONS
tractor's emplo proper attire w posable dust re
ON
all insulation s published ins nsulation on pi insulation mate ll-length units o abutting each es.
in the integrity t puncture, tea tible with ASJ M d systems, se
mastic. Coat
lications: VO Method 24).
accessories ca mmendations. ct labeling, su and accessor and meet spec this section, ca mplete to the p
hich insulation ean, dry, and undamaged. of piping and f
oyees shall be hen handling a espirators, glove
materials and structions to en iping subseque erials with smo of insulation, w h other. Butt in y of factory-ap
ars or other d Max facing. St eal penetrations
staples used o
OC content of
an be installed ubmittal data, a
ries to be ins cified thermal a arefully inspect oint where ins
is to be installe in good mec Wet, dirty, or fittings has bee
properly prote and applying in es, hard hats, a
accessories sure that it will ent to painting a ooth and even with single cut nsulation joints plied vapor re damage. Sea tapling is not re s of the ASJ M on cold pipe in
f 50 g/L or les
d in accordanc and/or certifica stalled on the and physical pr ct the site and stallation of ma
ed are clean an chanical condi
damaged insu en completed p
ected during in nsulation mate and eye protec
in accordanc serve its inten and acceptanc surfaces. Insu piece to comp s firmly to ens etarder jacketin al circumferent
equired to com Max and expo nsulation with
ss when calc
ce with Contr ations which m e project com
roperties. installed work aterials and ac
nd dry. tion with facto ulation shall no prior to installing
nstallation of in erials, and shal
ction.
ce with Contra nded purpose. ce tests. ulate each cont plete run. Do n sure complete, ng on pipe ins tial joints with
plete the closu osed ends of i suitable seala
culated accord
ract Document may accompan mply with app
k of other trade ccessories und
ory-applied va ot be acceptab g insulation.
nsulation. Prot ll include, but
act Document
tinuous run of not use cut pie tight fit over sulation, protec butt strips th ure.
nsulation with nt to maintain
ing to
ts and ny the plicable
es and er this
por or ble for
tection not be
ts and
piping eces or piping cting it at are vapor vapor
B.
C.
D. E.
F.
G.
barrier provide
NAIMA PIPE IN
5. When m Support piping Provide hange evaporating ho 1. Piping
suppor 2. For hot
than +2 fibergla 3. At verti Fittings: 1. For sys
piping s of cond 2. Cover v
a. b. c. 3. Seal fit 4. Use sta Penetrations: penetrations, e Joints: Butt p temperature is sealing laps by 1. Taper a Vertical Piping exposed vertic 0.016 in thick ( Accessory Ma Contractors As
integrity. Mas e isolation of wa
A GUIDE TO IN NSULATION 3
multiple layers g so that the er spacing so oles with sealin systems 3 in ( ted by placing t or cold piping 200°F (93°C) ass with sufficie
cal runs, provid
stems operatin system with w densation, prior
valves, fittings, Mitered sectio straight pipe ru Insulation cem PVC Fitting C insulation. ting joints with andard oversiz
Extend piping except where o pipe insulation s over 400°F (2 y firmly rubbing and seal pipe in g: Protect vert
cal piping with (0.4 mm) alum aterials (Midwe ssociation (MIC
stic pipe sectio ater incursion.
NSULATING C 33°F to 60°F (0
are required, a insulation is n that the circu ng tape for the (75 mm) in dia saddles of the systems large and insulated ent compressiv
de insulation s
g below ambie icking material r to installing in and similar ite ons of insulatio
uns.
ment, equal in th overs insulated vapor retarder ing practices fo g insulation w otherwise spec n against han 204°C) double g down surface nsulation ends tical piping to a hin the building
inum. est): Install in c CA) "Commerc
on ends at eve
For complete CHILLED WAT 0.5°C to 15.6°C
all inner layer(s not compromis mferential join length of the m meter or less, proper length er than 3 in (75 with fiberglass ve strength to s
upport rings, a
ent temperature to ensure a c nsulation. ems in each pip on equivalent i
hickness to the d with material r sealing tapes or valves and fl without interru
ified.
nger inserts. F layer. Seal ja e of tape and fla
, regardless of a height of 8 f g and insulated conformance w ial & Industrial
ery fourth pipe
recommended TER PIPING S C) (PUB. No. C
s) shall be No W sed by the han nt may be mad metal saddle.
insulated with and spacing u 5 mm) in diame
s, provide inse support the wei
s indicated on
e, wrap valves continuous path
ping system us n thickness an e adjoining insu l equal in thick
or mastics. langes. ption through For hot pipes acketing accord
ap. f service. ft -0 in (2.4 m) d piping expos with the curren Insulation Stan
section joint a
d instructions o SYSTEMS WIT C1228 dated 6/1
Wrap. nger or the ef
de outside the h fiberglass pip
nder the insula eter, operating erts such as f ight of the pipin
Drawings.
s, fittings, and s h (100% cover sing one of the nd composition ulation. kness and com
walls, floors s, stagger join ding to type be
) above the flo sed to the out nt edition of the
ndards."
and at each fit
on installation c TH MINERAL F
15).
ffects of the h e hanger. Cov pe insulation, m ation.
at temperature foam or high-d ng system.
similar items in rage) for the re
following: n to that instal mposition to adj
and similar nts when ope eing used. Sea
oor. Jacket insu tdoors with min e Midwest Insu
tting to
consult FIBER
anger. ver the may be
es less density
n each emoval led on joining
piping erating al
self-ulated, nimum ulation
3.5
A.
3.6
A. B.
Pub. No. 1 © 2016 Ow
FIELD QUALI
Upon completi This may be d protect insulat
PROTECTION
Replace dama damage and m The insulation protection of t deterioration o
0019399-A wens Corning. A
TY ASSURAN
ion of insulatio done while wor ion materials d
N
aged insulation moisture-satura n contractor sh the insulation w of the finished in
All Rights Rese
NCE
n work, visually rk is in progres during installatio
, which cannot ated insulation.
all advise the work during th nsulation work
END erved.
y inspect the w ss, to assure co
on.
t be satisfactori general and th he remainder o
.
D OF SECTION
work and verify ompliance with
ily repaired, inc he mechanica of the construc
N
y that it has bee h requirements
cluding insulati l contractor as ction period, to
en correctly ins s herein to cov
ion with vapor s to requireme o avoid damag
stalled. er and
barrier nts for ge and