K-12
FIRM PROFILE
BACKGROUND
For over 26 years, OCI Associates, Inc. has been a recognized leader in the fields of Mechanical, Electrical,
Plumbing and Fire Protection Engineering. Headquartered in Orlando Florida, we maintain branch offices in Fort
Pierce, West Palm Beach, Fort Myers, Tampa and Washington D.C. Throughout our history, we have provided our
clients with a broad range of project experience, personalized service and a knowledgeable staff. Our goal is to be
your partner in “Engineering Your Success”
SERVICES
Services of OCI Associates, Inc. range from facility master plans and reviews to construction design documents for
mechanical, electrical, plumbing, fire protection, fire alarm and systems engineering disciplines. The firm maintains
a competent staff of engineers and support personnel who believe in delivering complete projects on time and
within budget.
GREEN BUILDING DESIGN
Although our designs and efforts have always incorporated innovative techniques to maximize energy efficiency,
there is also the growing awareness of the impact that new construction has on our Environment. The Leadership in
Energy and Environmental Design (LEED®) Green Building Rating System
TMhas brought an industry wide awareness
to these issues. OCI Associates, Inc. has made a commitment to stay informed of current standards and new
methods to incorporate green building design principles into all of our projects. We require all of our professionals
and encourage the rest of our technical staff to pursue certification as LEED® Accredited Professionals (LEED® AP).
SUPPORT
Our staff is supported by an array of the latest analysis, design, production and project management tools used for
a variety of technical tasks and telecommunications.
GOALS
OCI Associates, Inc. believes that being able to deliver a quality product on time provides the best return for the
client. We strive for client satisfaction through the quality of our work, and the responsiveness of our staff.
K-12
SERVICES
Air Conditioning Systems Central Chiller Plants
Energy Management Systems Air Filtration Systems
Steam Boiler Plants Heating Systems Ventilation Systems Thermal Storage Systems Industrial Piping Systems Commissioning
MECHANICAL
ELECTRICAL
TECHNOLOGY
PLUMBING &
FIRE PROTECTION
PLANNING
AND STUDIES
PROJECT
MANAGEMENT
Contract Documents Contract Negotiations Contractor Selection Construction Administration Material and System EvaluationsBid Examination and Recommendations Scheduling and Progress Control Building Modeling Commissioning
Code Compliance Review for MEP Systems Indoor Air Quality (IAQ) Evaluations
Analysis of Existing MEP Systems Feasibility Studies
Energy Conservation Analysis Life Cycle Cost Analysis
LEED® Certification Review for MEP Systems Distribution Systems
Potable Water Systems Natural and LP Gas Systems Medical Gas Systems Drainage Systems
Sanitary Sewer and Vent Systems Storm Water Systems
Fire Protection Systems Electrical Distribution System Interior and Exterior Lighting Systems Standby Power Facilities
Electrical Power Generation Computer Power Systems
Communication and Data Systems Fire Alarm and Life Safety Systems Security Systems
Information Transport Systems Audio/Visual Design
K-12
SERVICES
OCI is fortunate to be well-diverse in a variety of markets and have had the opportunity to work with a number
of international companies producing engineering designs throughout the United States and in parts of South
America. We offer a full range of services to assist our clients in achieving their project goals from planning and
design, feasibility studies, and project management to construction administration. Our market sectors include:
BUILD
•
Industrial Facilities
•
Manufacturing Plants
•
Central Energy Plants
CHILL
•
Hotels, Spas and Resorts
EAT
•
Fast Food
•
Restaurants
•
Concessions
•
Food and Beverage Facilities
FLY
•
Airport Terminals
•
Aviation Support Facilities
•
Transportation Facilities
GATHER
•Community Centers
•Convention Halls
•Alumni Centers
•Libraries
HEAL
•Healthcare Facilities
•
Assisted Living and Long Term Care
•
Medical Offices
•Hospitals
LEARN
•K-12 Schools
•Community Colleges
•Universities
•Private Schools
LIVE
•Dormitories
•Condos
•Apartments
•Private Residences
•Multifamily Housing
PLAY
•
Water and Theme Parks
•
Museums and Zoo’s
•
Sports Stadiums
•
Recreational Parks
•
Entertainment Facilities
PRAY
•
Churches and Sanctuaries
•
Religious Facilities
PROTECT
•
Public Safety
•
Emergency Response
•
Justice and Corrections
•
Federal and Military
•
Mission Critical
•
Government Facilities
PRESERVE
•
Historical Facilities
SHOP
•
Retail and Big Box
•
Mixed Use
STORE
•Warehouses
•Maintenance Facilities
•Parking Structures
•Vehicle Storage
WORK
•Commercial Offices
•Corporate Headquarters
•Financial Institutions
•Tenant Improvements
SUSTAIN
•
Green Globes, Net Zero, LEED®
•
Energy Efficiency Smart Buildings
SPECIALITY EXPERIENCE
•
Continuing Service Contracts
•
Design-Build Projects
•
Commissioning
K-12
Owner
School District of St. Lucie
Architect SchenkelShultz Contractor James A. Cummings Project Type New Construction Services Provided Mechanical, Electrical, Plumbing, Fire Protection, IT/ AV Systems Construction Cost $74M Project Size 344,331 SF Completion Date 2009
FORT PIERCE CENTRAL HIGH SCHOOL
Fort Pierce, FLOCI Associates Inc. provided complete professional mechanical, electrical, plumbing and fire protection design engineering services for new 344,331 SF high school in Fort Pierce, Florida. The $74 million high performance school includes a cafeteria, administration, media and gymnasium and several classroom buildings. The replacement high school is designed to accommodate 2,500 students.
K-12
Owner
School Board of St. Lucie County
Architect
Donadio & Associates, Architects, PA
Project Type
New Construction
Services Provided
Mechanical, Electrical, Plumbing, Fire Protection, ITS/AV Systems Construction Cost School CEP $2M Project Size To Support 300,000 SF Completion Date 2010
ST. LUCIE WEST CENTENNIAL HIGH SCHOOL
Fort Pierce, FL
OCI Associates Inc. managed and provided mechanical, electrical, plumbing and fire protection (MEP/FP) design engineering for a the addition of a new 1,200-Ton Central Energy plant to support the 310,000 SF High School in Port St. Lucie, Florida. OCI worked with St. Lucie County Schools to design and build a more energy efficient system that also included a Thermal Ice Storage System as part of the district’s Energy Task Force improvement goals.
OCI was able to manage this project successfully under an extraordinary situation based on the proposed schedule of the Owner. The new Central Energy Plant for Centennial High School needed to be completed in a short time period, so OCI fast-tracked the project and was able to complete design in 4 weeks from conception to release of Owner’s direct purchase. The entire project was completely constructed and operational in 4 months and had an estimated $2M budget.
K-12
Owner
School Board of St. Lucie County
Prime Consultant:
OCI Associates, Inc.
Project Type New Construction to Support 3 Existing Campuses Services Provided Mechanical, Electrical, Plumbing, Fire Protection, ITS/AV Systems
Construction Cost
Est. $6.8M
Completion Date
January 2013
DALE CASSENS, DAN McCARTY, ST. LUCIE
MIDDLE SCHOOLS
Fort Pierce, FLOCI Associates, Inc. was contracted by St. Lucie Public Schools as the prime mechanical, electrical and plumbing consultant under their current Continuing Service Contract, to investigate three existing school sites all located on one large parcel. OCI provided an evaluation report of the existing conditions with our recommendations to improve energy efficiency, as well as the operations and maintenance for the owner. Each school site has their own central chilled water plant, consisting of air cooled chillers with a constant volume pumping system. The schools range from 40-60 years old with many additions over the years and have been experiencing multiple failures to their central energy plants with constant maintenance required.
After reviewing our report findings, OCI made recommendations to the owner to design and construct a new central energy plant to be located centrally among all three schools on the same parcel of land. The new plant will supply each school their chilled water requirements by utilizing a new underground piping system. This new infrastructure will consist of HDPE insulated piping for improved construction due to time constraints and cost. The new central plant consists of two (2) 340-Ton air cooled chillers supplemented with a thermal ice storage system for peak load requirements. The pumping system consists of primary and secondary pumping systems for optimum efficiency. The project is currently in construction and is presently about 70% complete and cited for completion in January 2013. When completed, the project will receive an extensive Commissioning process procedure conducted by OCI for intended design related to the construction and system function. OCI was asked to manage all the Units simultaneously as one project for the district.
K-12
K-12
K-12
Owner
School District of Osceola County Architect SchenkelShultz Project Type Conversion / Renovation Services Provided Mechanical, Electrical, Plumbing, Fire Protection, IT/ AV Systems Construction Cost: $9M Project Size: 75,000 SF Completion Date August 2008
NEW BEGINNINGS EDUCATIONAL CENTER
Kissimmee, FLOCI Associates Inc. provided engineering design services for a $9,000,000 conversion of the Osceola Sports Authority in Kissimmee, Florida. The former big box retailer’s 75,000 SF abandoned building was renovated into a 2-story classroom building and included an addition. Our scope of work was to upgrade and replace the existing mechanical, electrical, plumbing and fire protection systems for the 270 student K-5 school. The new adaptive re-use educational complex was completed in 2008 to accommodate Cornerstone, a K-12 program for exceptional students or those with specific disabilities due to overcrowding for the past few years.
K-12
Osceola County Schools
Owner
Osceola County School District Architect SchenkelShultz Architects Project Type New Construction Services Provided Mechanical, Electrical, Plumbing, Fire Protection, IT/AV Systems Construction Cost Est. $14.4M Project Size 106,000 SF Completion Date 2009
Narcoossee Elementary School
Kissimmee, FloridaThe project included a new 950-student station prototype elementary school to relieve overcrowding at the existing Narcoossee Community K-8 School. The $14.4 million school was completed in 2009. OCI was responsible for complete mechanical, electrical, plumbing, fire protection and IT systems design.
K-12
Owner
Osceola County School District Architect SchenkelShultz Architects Project Type Expansion Services Provided Mechanical, Electrical, Plumbing, Fire Protection, IT/AV Systems Construction Cost Est. $24.4M Project Size 171,838 SF New Completion Date 2009
Westside K-8
Kissimmee, FloridaAs another level of the Osceola Plan prototype, the Westside K-8 School (formerly known as Middle School CC) was created by expanding the elementary school into a middle school. The school is flexible to accommodate future growth. OCI was responsible for complete mechanical, electrical, plumbing , fire protection and ITS/AV Systems Design. The 171,838 SF rebuild of the existing campus was completed in 2009 at a cost of $24.4 million.
K-12
Owner
Osceola County School District Architect SchenkelShultz Architects Project Type New Construction Prototype Services Provided Mechanical, Electrical, Plumbing, Fire Protection, IT/AV Systems Construction Cost Est. $16M Project Size 100,000 SF New Completion Date 2008
Harmony Elementary School
Harmony, FloridaOsceola County Schools
Harmony Elementary School is a new elementary school prototype. The project is a 2-story school consisting of nearly 100,00 SF with a construction budget of $16 million and was designed based on sustainable/LEED® principles. OCI was responsible for the complete design of mechanical, electrical, plumbing, fire protection and IT systems. The project was completed in 2008.
K-12
Osceola County Schools
Owner
Osceola County School District
Architect
Song & Associates
Project Type
Addition
Services Provided
Mechanical, Electrical, Plumbing, Fire Protection, IT/AV Systems Construction Cost Est. $5M Project Size 30,000 SF New Completion Date January 2011
Gateway Middle School
Kissimmee, FloridaThe Gateway High School Classroom Building addition is a new 2-story, 30,000 SF facility. Completed in January 2011, this new classroom building houses Chemistry and Computer Labs. The building was designed and constructed with many green and sustainable design features. OCI was responsible for complete mechanical, electrical, plumbing , fire protection and ITS/AV Systems Design. The project had an estimated construction value of approximately $5 million.
K-12
Owner
School District of Osceola County Architect SchenkelShultz Architects Project Type Conversion / Renovation Services Provided Mechanical, Electrical, Plumbing, Fire Protection, IT/ AV Systems Construction Cost $6M Project Size 85,000 SF Completion Date 2005
ZENITH GRADE CENTER
Kissimmee, FLOCI Associates Inc. provided mechanical, electrical, plumbing, fire protection, ITS/ AV Systems for the conversion of an existing K-Mart Shopping Center into a new 9th Grade Center for Osceola County School District. The design team completed a renovation of an existing 85,000 SF big box retail front to accommodate Gateway High School’s 9th Grade programs and Alternative Education programs. The alternative retrofit project budget was $6,500,000 and was a much needed creative option for the school district on a limited budget in a prime location in a fast turn-around time.
K-12
Owner
Osceola County School District Architect SchenkelShultz Architects Project Type New Construction Renovation Services Provided Mechanical, Electrical, Plumbing, Fire Protection, IT/AV Systems Construction Cost Est. $14.4M Project Size 101,270 SF New 19,459 SF Renovation Completion Date August 2011
Highlands Elementary School
Kissimmee, FloridaOsceola County Schools
The project includes the addition of a new 101,270 SF elementary school building and 19,459 SF of renovations to the existing 50 year old campus. The 920 student station school will include new classrooms, administration, cafeteria and media center. OCI was responsible for complete mechanical, electrical, plumbing, fire protection and ITS/AV Systems Design. This project is expected to be completed in August of 2011.
K-12
Owner
School District of Lee County Architect SchenkelShultz Project Type Conversion / Renovation Services Provided Mechanical, Electrical, Plumbing, Fire Protection, IT/ AV Systems Construction Cost $7M Project Size 100,000 SF Completion Date 2005
G. WEAVER HIPPS ELEMENTARY
Lehigh, FLOCI Associates Inc. provided mechanical, electrical, plumbing, fire protection, ITS/ AV Systems for a $7million “staging school” as a temporary facility that would house students for one to two years while a new building was constructed. The project involved a complete conversion of an abandoned K-Mart Shopping Center into a 100,000 SF Elementary School for Lee County School District. Completed in 2005, the project was needed for the rapidly growing population of 50,000 new residents between 2000 and 2003. With all the infrastructure in place – water, sewer, sprinkler systems, this option was a more affordable options than building massive portable classrooms. After serving as a staging school for a high school and two elementary schools, the building became the permanent home for the 5th elementary school in Lehigh Acres, Florida.
K-12
Owner
School District of Lee County
Architect
Alliance Design Group
Project Type
Conversion / Renovation
Services Provided
Mechanical, Electrical, Plumbing, Fire Protection, IT/ AV Systems Construction Cost $17.6M Project Size 100,000 SF Completion Date 2005
RAYMA C. PAGE ELEMENTARY
Estero, FLOCI Associates Inc. provided mechanical, electrical, plumbing, fire protection, ITS/ AV Systems for the new Rayma C. Page Elementary School in Fort Myers, Florida. The former big box retailer, K-Mart’s existing shopping center was converted into a $17.6 million 100,000 SF school to accommodate the growing population. This adaptive re-use project was one of 3 new schools for Lee County School District where utilizing an old abandoned building not only helped the district but the surrounding residential and commercial areas. The new K-5th grade elementary school contains a multi-purpose cafeteria with performance platform, commercial kitchen, music lab, 50 classrooms of 1,000 students as per the new State classroom size amendment, and administrative offices. The new campus also includes a bus loop and playing fields with a basketball court.
K-12
Owner
School District of Lee County Architect SchenkelShultz Project Type New Construction Services Provided Mechanical, Electrical, Plumbing, Fire Protection, ITS/AV Systems Construction Cost Est. $4.5M Project Size 300,000 SF Completion Date July 2012
CAPE CORAL HIGH SCHOOL
Cape Coral, FLOCI Associates Inc. provided mechanical, electrical, plumbing and fire protection (MEP/FP) design engineering for a massive renovation that included interior upgrades of the existing boys and girls locker rooms, the school cafeteria and a complete replacement of the HVAC system and for the design of a new DDC Controls systems. As part of the project, OCI provided a complete replacement of the existing inefficient air-cooled central plant with a new 800-Ton Central Energy Plant to support the entire 300,000 SF campus-wide renovation.
The new chiller plant includes (2) 400-Ton chillers are water-cooled centrifugal compressor chillers. The compressors are Turbocor magnetic bearing oil-less compressors and units were provided with integrated variable frequency drive (VFD) for part load control. The refrigerants are R-134a with no ozone depletion potential and the chillers were provided with BACnet communications interface so that all internal control information is accessible from the central building automation system (BAS). The cooling towers are constructed of stainless steel including all hardware for corrosion resistance. The chilled water pumping system is a constant volume Primary/Variable secondary system. There are three constant flow primary chilled water pumps, utilizing the third as a stand-by. The secondary is provided with two, VFD controlled chilled water pumps serving the campus distribution loop with each pump alternating operation on a weekly basis with the other serving as a stand-by. The CEP was placed into operation in July of 2012 and has reported campus-wide energy savings between 20-25%. These savings were a combination of implementing new energy savings strategies in the building HVAC systems and the improved efficiency of the central energy plant. Project was constructed on an occupied campus including a design that required ten phases of construction. The project had an estimated construction budget of $4.5 million and was completed in 2009
K-12
Owner
School District of Lee County Architect SchenkelShultz Project Type Renovation Upgrade Services Provided Mechanical, Electrical, Plumbing, Fire Protection, IT/ AV Systems
Construction Cost
$4.5M
Completion Date
2009
CAPE CORAL HIGH SCHOOL
”LOCKER ROOM” Cape Coral, FLOCI Associates Inc. provided mechanical, electrical, plumbing and fire protection (MEP/FP) design engineering for the interior renovation of the existing boys and girls locker rooms and the school cafeteria. The design efforts also required a complete replacement of the HVAC system and for the design of a new DDC Controls systems. The project had an estimated construction budget of $4.5 million.
K-12
Owner
School Board of Collier County Architect SchenkelShultz Project Type Renovation Services Provided Mechanical, Electrical, Plumbing, Fire Protection, IT/ AV Systems Construction Cost $5.7M Project Size 54,000 SF Completion Date 2010
EAST NAPLES MIDDLE SCHOOL
Naples, FLThis project was a campus wide 54,000 SF renovation of the existing school. OCI provided complete professional mechanical, electrical, plumbing and fire Protection design engineering services.
K-12
Owner
School Board of Collier County
Architect
Harvard Jolly Architects
Project Type
Renovation Upgrade
Services Provided
Mechanical, Electrical, Plumbing, Fire Protection, IT/ AV Systems
Construction Cost
$4.4M
Completion Date
2006
GOLDEN GATE ELEMENTARY SCHOOL
Naples, FLOCI Associates Inc. was tasked to design and coordinate a campus wide mechanical, electrical and plumbing (MEP) system renovation and a DDC Control replacement. The project also included interior upgrades. The project had an estimated construction budget of $4 million. OCI provided complete professional mechanical, electrical, plumbing and fire Protection design engineering services for the renovation.
K-12
Owner
School Board of Collier County Architect SchenkelShultz Project Type Renovation Upgrade Services Provided Mechanical, Electrical, Plumbing, Fire Protection, IT/ AV Systems Construction Cost $27M Project Size 300,000 SF Completion Date 2010
IMMOKALEE HIGH SCHOOL
Naples, FLOCI Associates Inc. provided a complete Conditions Assessment and Report of the mechanical, electrical and plumbing (MEP) systems of this existing 30 year old campus. The report lead to a complete campus wide replacement of over 300,000 SF of the outdated MEP systems and FMCS (Facilities Management and Control Systems). The project had an estimated construction budget of $27 million.
OCI provided complete professional mechanical, electrical, plumbing and fire protection design engineering services for the renovation.
K-12
Owner
School District of Collier County
Prime Consultant
OCI Associates, Inc.
Project Type
Renovation & Upgrade
Services Provided
Mechanical, Electrical, Plumbing, Fire Protection, ITS/AV Systems Construction Cost Est. $4.4M Project Size 240,000 SF Completion Date 2007
MANATEE ELEMENTARY/MIDDLE SCHOOL
Naples, FL
OCI Associates Inc. provided mechanical, electrical, plumbing engineering design services for a 800-Ton Central Energy Plant to support a 240,000 SF combined elementary/middle school campus in Collier County. The project involved an expansion and renovation of the existing “FAFCO” Thermal Ice Storage Tank System including (2) 400-Ton air-cooled chillers, pumps, controls and ice tanks. The chilled water pumping system is a constant volume Primary/Variable secondary system. There are three constant flow primary chilled water pumps, with the third as a stand-by. The secondary is provided with two, VFD controlled chilled water pumps serving the campus distribution loop with each pump alternating operation on a weekly basis with the other serving as a stand-by. In addition to the HVAC improvements, OCI provided upgrades in lighting and power distribution, as well, as ITS/AV Systems including a new campus Direct Digital Control System.
The project was designed under OCI’s Prime MEP Contract with the School District of Collier County and OCI managed the project along with the architectural and structural engineering consultants from design through construction. The project was constructed on an occupied campus including a design that required eight phases of construction. The project had an estimated construction budget of $4.4 million and was completed in 2007.
K-12
Owner
School Board of Palm Beach County Project Type New Prototype Services Provided Mechanical, Electrical, Plumbing, Fire Protection, IT/ AV Systems
Construction Cost
$7.7M
Completion Date
1994
Palm Beach County Schools
MANATEE ELEMENTARY SCHOOL
Lake Worth, FLManatee Elementary School is one of six prototype elementary and middle school projects OCI designed and constructed in the mid to late 1990’s. Our prototype elementary schools consisted of 110,000 SF and our prototype middle school projects consisted of 150,000 SF. OCI was responsible for the mechanical, electrical, plumbing, fire protection and IT/AV design engineering. OCI’s prototype elementary and middle school projects for the School District of Palm beach County are:
Elementary Schools
Manatee Elementary School Belle Glade Elementary School Gove Glade View
Middle Schools
Loggers Run Relief Middle School Callery-Judge Middle School Pinehurst Middle School
K-12
Owner
School District of Indian River Architect SchenkelShultz Project Type New Construction Services Provided Mechanical, Electrical, Plumbing, Fire Protection, IT/ AV Systems Construction Cost $36.9M Project Size 167,500 SF Completion Date 2009
STORM GROVE MIDDLE SCHOOL
Vero Beach, FLStorm Grove Middle School was designed using the “school within a school” concept in which each grade level is housed in a separate classroom building to create small learning communities. The new 167,500 SF, 2-story middle school accommodates 1,329 student stations on a 35-acre site and includes a 1-story cafeteria, administration, media and gymnasium that are situated on the site to allow for after hours use by the community. The $36.9 million school was designed using the modern Florida Cracker architectural style and is designed to meet the LEED® for Schools GOLD Criteria.
OCI provided complete professional mechanical, electrical, plumbing and fire protection design engineering services for the new educational facility in Vero Beach, Florida
K-12
EXPERIENCE
School Board of Brevard County
Continuing Services Contract Cocoa High School - Renovations
Brevard “CCC” High School - New High School 310,000 SF
Harbor City Elementary School – Campus Wide Renovation of 100,000 SF
District School Board of Collier County
Continuing Services Contract
Avalon Elementary School - Campus Wide DDC Control Replacement Naples High School - Mechanical Conditions Assessment and Report.
Immokalee High School - Campus Wide MEP/FP System Replacements (300,000 SF) & FMCS (Facilities Management and Control Systems) Replacement.
Immokalee High School - MEP Conditions Assessment and Report.
Manatee Elementary/Middle School - Chiller Plant replacement, Campus-wide M/E Renovations and DDC Control Replacement. Everglades City School - HVAC Systems Renovations and DDC Control Replacement.
Barron Collier High School - HVAC Systems Renovations and DDC Control Replacement.
Golden Gate Elementary School - Campus-Wide complete M/E Building Renovations and FMCS Replacement. Lorenzo Walker Institute for Technology - HVAC Systems Replacement/Buildings 2 thru 6.
East Naples Middle School - Locker Room HVAC Renovations. Gulf Coast High School - FMCS Replacement.
Avalon Elementary School - FMCS Replacement and Misc. HVAC repairs. Tommie Barfield Elementary School - FMCS Replacement.
Barron Collier High School - HVAC/Test and Balance Construction Documents Gulf Coast High School - Culinary Arts Classroom and Kitchen Renovations Palmetto Ridge High School - Culinary Arts Classroom and Kitchen Renovations East Naples Middle School - Campus Wide MEP/FP Renovations
Corkscrew Elementary / Middle School
Barron Collier High School - HVAC Replacement
School District of Indian River County
Continuing Services Contract
Sebastian River High School - New Central Energy Plant North County Middle School - New Middle School 235,000 SF Sebastian River High School - New Multi-Purpose Building 30,000 SF Sebastian River High School - New Classroom Building 30,000 SF Sebastian Elementary School - Renovation of 55,000 SF
Gifford Middle Magnet School - Renovation of 75,000 SF Rosewood Elementary School - Renovation of 38,000 SF Vero Beach Elementary School - Renovation of 20,000 SF Dodgertown Elementary School - Renovation of 30,000 SF
K-12
EXPERIENCE
School District of Lee County
Continuing Services Contract
Lee County Prototype Elementary School - Michigan Elementary School Lee County Prototype Elementary School - Weaver Hipps Elementary School
Cape Coral High School - Interior MEP/FP Cafeteria and Kitchen Additions/Renovations Pelican Elementary School - Complete MEP/FP Renovations and EMS Replacement Gulf Elementary School - Complete MEP/FP Renovations and EMS Replacement Lee County Classroom Addition (Bayshore Elementary School)
Lee County Classroom Addition (Caloosa Elementary School) Lee County Classroom Addition (Diplomat Elementary School) Lee County Classroom Addition (Hancock Elementary School) Lee County Classroom Addition (Tropic Isles Elementary School) Lehigh Staging School - P.E. Building/Play Pavilion
Alva Middle School - Cafeteria HVAC Replacement
Cypress Lake High School - Electrical Study/Chilled Water Pump/Valve Replacement. Edgewater Elementary School - Outside Air Unit Replacement.
Gulf Middle School - Outside Air Unit Replacement.
Page Elementary School - New Elementary School 100,000 SF (K-Mart conversion). Lehigh Staging School - New Elementary School 100,000 SF (K-Mart conversion).
Buckingham Exceptional Center - Miscellaneous HVAC, Electrical, Plumbing and I/T Renovations.
Lehigh Elementary School Campus - Partial Tear-Down/Re-Build/Renovations; New Construction of multiple classroom/adminis-tration buildings, renovations of existing buildings, new central chilled water/ice storage plant, new energy management system. Villas Elementary School - Miscellaneous HVAC Renovations.
Bonita Springs Elementary School - Cafeteria, Kitchen and Classroom HVAC Renovations.
Cape Coral High School - Chiller Plant Replacement and complete building HVAC systems replacement.
Orange County Public Schools
Grand Avenue Elementary School - Campus Renovation Dover Shores Elementary School - Campus Renovation
K-12
EXPERIENCE
School District of Osceola County
Celebration K-8 – Campus Interior Renovations and HVAC Replacements Osceola Middle School “DD” - New School 165,000 SF
Osceola Highlands Elementary School - New School 100,000 SF East Lake Elementary School - New School 100,000 SF
Parkway Middle School - Classrooms and Interior Renovations Gateway Middle School - New 28,000 SF Classroom Building Osceola Middle School “CC” - New School 165,000 SF Narcoossee Elementary School - New School 135,000 SF Koa Elementary School - New School 100,000 SF
Harmony Elementary School - New School 100,000 SF Poinciana High School - New Auditorium
Osceola County Sports Authority Conversion
Osceola County 9th Grade Center - New 9th Grade Center 85,000 SF (K-Mart conversion) Crossroads Educational Center - New Classroom Building 20,000 SF
Neptune Middle School - Retrofit for Technology
School Board of St. Lucie County
Continuing Services Contract
Centennial High School - Gymnasium Renovations and Modernization Westwood High School - Greentech Laboratory
Rivers Edge Elementary School - New Central Energy Plant
Savanna Ridge Elementary School - Chiller Replacement / Thermal Storage Lincoln Park Academy - Chiller Replacement
Lincoln Park Academy - New A/V System and Technology Upgrades
Westwood High School / Harbor Branch - Marine and Oceanographic Academy (MOA) CA Moore Elementary School - Chiller Replacement
Centennial High School - New Central Energy Plant / Thermal Storage
Fort Pierce Central High School - New High School 310,000 SF Treasure Coast High School - New High School 310,000 SF
Jenkins Elementary/Middle School - New Elementary/Middle School 210,000 SF
Oak Hammock Elementary/Middle School - New Elementary/Middle School 210,000 SF Lincoln Park Academy - Renovation of Classroom HVAC and Electrical Systems Westgate Elementary/Middle School - New Elementary/Middle School 210,000 SF Central High School - Chiller Plant Replacement
Central High School - HVAC Modifications and Renovations of Building “F”
Westwood High School - HVAC Modification/Renovations of Various Campus Lighting Systems C. A. Moore Elementary School - New 40,000 SF/Renovation of 50,000 SF
K-12
EXPERIENCE
School Board of Seminole County
Continuing Services Contract
Midway Transportation Center – New Bus Maintenance and Storage Facility Test and Balance Specification Development
School Board of Martin County
Continuing Services Contract
Martin County High School - Phase II New Campus
Dr. David L. Anderson Middle School - New Middle School 235,000 SF Murray Middle School - New Classroom Building and Cafetorium Stuart Middle School - New Classroom Building and Cafetorium Indiantown Middle School - New Classroom Building and Cafetorium
Palm Beach County Schools
Loggers Run Relief Middle School (Design/Build) - New 150,000 SF Callery-Judge Middle School (Design/Build) - New 150,000 SF Pinehurst Middle School (Design/Build) - New 150,000 SF Belle Glade Elementary School (Design/Build) - New 110,000 SF Gove Glade View Elementary School (Design/Build) - New 110,000 SF Manatee Elementary School (Design/Build) - New 110,000 SF