We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. © Copyright 2009 ABB
APPROVED CUSTOMER DRAWING NUMBER REV
MA’ADEN
MD-403-4000-QD-EL-ITP-0024 P01
P01 16-FEB-2009 For SEC & Ma’aden Approval - JCO NA
REV DATE DESCRIPTION DRN CHK ENG
Prepared Based on : / Replaces : Sep.PL same No. Without Separ.PL Scale Doc.Type Format
02/16/2009 JCO
Sep. PL Anoth. No. NTS DAS A4Checked Responsible department Title
02/16/2009 NA
SAACE
Approved Take Over department Language
02/16/2009 FA
Site Inspection & Test Plan
Meterings
Ma’aden 380/115kV Substations at Ras Az Zawr
en
Order Name : 380/115kV GIS Substation at Ras Az Zawr No Sheets :
Revision A 02/16/2009 CC Order No : ABB Proj. No.:06-856-084
-
Document Designation Document Number : Sheet No :
Pages: 1 / 4
Item
No.
ABB Sub-ContractorABB
MA'ADEN
/ WP
SEC
1 Ammeter - - - - - --1. 1 Mechanical Check & Visual Inspection - - -
-- Inspect for any physical damage, verify
connections and tightness of connections Manufacturer Manual Visual Inspection
TR-3.27.1
(Page 1) E W/S M/R M/R
1. 2 Electrical Test - - -
-- Perform applicable functional test indicated on
TR-3.27.1, Item 3.1 Manufacturer Manual Visual Inspection
TR-3.27.1
(Page 1) E W/S M/R M/R
- Secondary Injection Test TR-3.27.1, Item 3.2 Manufacturer Manual Visual Inspection TR-3.27.1
(Page 1) E W/S M/R M/R
2 Voltmeter - - - - - -
-2. 1 Mechanical Check & Visual Inspection - - -
-- Inspect for any physical damage, verify
connections and tightness of connections Manufacturer Manual Visual Inspection
TR-3.27.2
(Page 1) E W/S M/R M/R
2. 2 Electrical Test - - -
-- Perform applicable functional test indicated on
TR-3.27.2, Item 3.1 Manufacturer Manual Visual Inspection
TR-3.27.2
(Page 1) E W/S M/R M/R
- Secondary Injection Test TR-3.27.2, Item 3.2 Manufacturer Manual Visual Inspection TR-3.27.2
(Page 1) E W/S M/R M/R
Acceptance Criteria
Document of Reference
MD-403-4000-QD-EL-ITP-0024
Discipline: Electrical Works
Site Inspection & Test Plan (ITP)
Meterings
Maaden 380/115kV Substations at Ras Az Zawr
Rev. P01 Feb. 15, 2009
Contract No.: 06-856-BX-084
ABB Contracting Co. Ltd.
Abbreviations:
E= Execute, indicates the party responsible for executing the attribute. H= Hold Point, indicates work may not progress until inspection is complete.
M= Monitor, indicates this attribute will be monitored on a continual basis and may include any and all activities. R= Review, indicates this attribute will receive document review only. S= Submit, indicates that a document shall be submitted.
W= Witness, indicates this attribute will be inspected after completion. This is applicable when the item is accessible and can be inspected at any time during or after completion of work as the activity requires.
INSPECTION RESPONSIBILITY
Verifying Document
Work Item and QC Activity
ABB Contracting Co. Ltd.
Pages: 2 / 4
Item
No.
ABB Sub-ContractorABB
MA'ADEN
/ WP
SEC
Acceptance Criteria
Document of Reference
MD-403-4000-QD-EL-ITP-0024Discipline: Electrical Works
Site Inspection & Test Plan (ITP)
Meterings
Maaden 380/115kV Substations at Ras Az Zawr
Rev. P01 Feb. 15, 2009
Contract No.: 06-856-BX-084
ABB Contracting Co. Ltd.
Abbreviations:
E= Execute, indicates the party responsible for executing the attribute. H= Hold Point, indicates work may not progress until inspection is complete.
M= Monitor, indicates this attribute will be monitored on a continual basis and may include any and all activities. R= Review, indicates this attribute will receive document review only. S= Submit, indicates that a document shall be submitted.
W= Witness, indicates this attribute will be inspected after completion. This is applicable when the item is accessible and can be inspected at any time during or after completion of work as the activity requires.
INSPECTION RESPONSIBILITY
Verifying Document
Work Item and QC Activity
ABB Contracting Co. Ltd.380/115kV GIS Substation – Ma’aden
3 Frequency Meter - - - - - -
-3. 1 Mechanical Check & Visual Inspection - - -
-- Inspect for any physical damage, verify
connections and tightness of connections Manufacturer Manual Visual Inspection
TR-3.27.5
(Page 1) E W/S M/R M/R
3. 2 Electrical Test - - -
-- Perform applicable functional test indicated on
TR-3.27.5, Item 3.1 Manufacturer Manual Visual Inspection
TR-3.27.5
(Page 1) E W/S M/R M/R
- Secondary Injection Test TR-3.27.5, Item 3.2 Manufacturer Manual Visual Inspection TR-3.27.5
(Page 1) E W/S M/R M/R
4 Power Meter - - - - - -
-4. 1 Mechanical Check & Visual Inspection - - -
-- Inspect for any physical damage, verify
connections and tightness of connections Manufacturer Manual Visual Inspection
TR-3.27.3
(Page 1) E W/S M/R M/R
4. 2 Electrical Test - - -
-- Perform applicable functional test indicated on
TR-3.27.3, Item 3.1 Manufacturer Manual Visual Inspection
TR-3.27.3
(Page 1) E W/S M/R M/R
- Secondary Injection Test TR-3.27.3, Item 3.2 Manufacturer Manual Visual Inspection TR-3.27.3
Pages: 3 / 4
Item
No.
ABB Sub-ContractorABB
MA'ADEN
/ WP
SEC
Acceptance Criteria
Document of Reference
MD-403-4000-QD-EL-ITP-0024Discipline: Electrical Works
Site Inspection & Test Plan (ITP)
Meterings
Maaden 380/115kV Substations at Ras Az Zawr
Rev. P01 Feb. 15, 2009
Contract No.: 06-856-BX-084
ABB Contracting Co. Ltd.
Abbreviations:
E= Execute, indicates the party responsible for executing the attribute. H= Hold Point, indicates work may not progress until inspection is complete.
M= Monitor, indicates this attribute will be monitored on a continual basis and may include any and all activities. R= Review, indicates this attribute will receive document review only. S= Submit, indicates that a document shall be submitted.
W= Witness, indicates this attribute will be inspected after completion. This is applicable when the item is accessible and can be inspected at any time during or after completion of work as the activity requires.
INSPECTION RESPONSIBILITY
Verifying Document
Work Item and QC Activity
ABB Contracting Co. Ltd.380/115kV GIS Substation – Ma’aden
5 Power Transducer - - - - - -
-5. 1 Mechanical Check & Visual Inspection - - -
-- Inspect for any physical damage, verify
connections and tightness of connections Manufacturer Manual Visual Inspection
TR-3.27.3A
(Page 1) E W/S M/R M/R
5. 2 Electrical Test - - -
-- Perform applicable functional test indicated on
TR-3.27.3A, Item 3.1 Manufacturer Manual Visual Inspection
TR-3.27.3A
(Page 1) E W/S M/R M/R
- Secondary Injection Test TR-3.27.3A, Item 3.2 Manufacturer Manual Visual Inspection TR-3.27.3A
(Page 2) E W/S M/R M/R
6 Current Transducer - - - - - -
-6. 1 Mechanical Check & Visual Inspection - - -
-- Inspect for any physical damage, verify
connections and tightness of connections Manufacturer Manual Visual Inspection
TR-3.27.6
(Page 1) E W/S M/R M/R
6. 2 Electrical Test - - -
-- Perform applicable functional test indicated on
TR-3.27.6, Item 3.1 Manufacturer Manual Visual Inspection
TR-3.27.6
(Page 1) E W/S M/R M/R
Pages: 4 / 4
Item
No.
ABB Sub-ContractorABB
MA'ADEN
/ WP
SEC
Acceptance Criteria
Document of Reference
MD-403-4000-QD-EL-ITP-0024Discipline: Electrical Works
Site Inspection & Test Plan (ITP)
Meterings
Maaden 380/115kV Substations at Ras Az Zawr
Rev. P01 Feb. 15, 2009
Contract No.: 06-856-BX-084
ABB Contracting Co. Ltd.
Abbreviations:
E= Execute, indicates the party responsible for executing the attribute. H= Hold Point, indicates work may not progress until inspection is complete.
M= Monitor, indicates this attribute will be monitored on a continual basis and may include any and all activities. R= Review, indicates this attribute will receive document review only. S= Submit, indicates that a document shall be submitted.
W= Witness, indicates this attribute will be inspected after completion. This is applicable when the item is accessible and can be inspected at any time during or after completion of work as the activity requires.
INSPECTION RESPONSIBILITY
Verifying Document
Work Item and QC Activity
ABB Contracting Co. Ltd.380/115kV GIS Substation – Ma’aden
6. 1 Mechanical Check & Visual Inspection - - -
-- Inspect for any physical damage, verify
connections and tightness of connections Manufacturer Manual Visual Inspection
TR-3.27.5
(Page 1) E W/S M/R M/R
6. 2 Electrical Test - - -
-- Perform applicable functional test indicated on
TR-3.27.5, Item 3.1 Manufacturer Manual Visual Inspection
TR-3.27.5
(Page 1) E W/S M/R M/R
- Secondary Injection Test TR-3.27.5, Item 3.2 Manufacturer Manual Visual Inspection TR-3.27.3A
(Page 1) E W/S M/R M/R