• No results found

Participatory modelling for stakeholder involvement in the development of flood risk management intervention options

N/A
N/A
Protected

Academic year: 2020

Share "Participatory modelling for stakeholder involvement in the development of flood risk management intervention options"

Copied!
20
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 2. Hebden Bridge town centre (left) and surrounding landscape (right).
Fig. 3. Hebden Water catchment with inset UK locator map (above) and hydrograph from 21 to 24 June 2012 (below)
Fig. 4. The structure of the participatory modelling process used in Hebden Bridge.
Table 1
+7

References

Related documents

Present work analyzes the effects of mass and heat transfer on unsteady MHD flow for a Casson fluid past a vertical flat plate with Newtonian heating in the presence of thermal

CNV: Copy number variation; COPD: Chronic obstructive pulmonary disease; DHS: DNase I hypersensitive site; eQTL: Expression quantitative trait locus; G × E:

The multimode Radio cellular mobile system has improved performance on the basis of BER and constellation size for different modulation algorithms.. Thus, the mode may improve

In the existing DAA schemes, the platform obtains a credential, and can generate signatures which are unlinkable by both the verifier and the issuer, and hence have

Field experiments were conducted at Ebonyi State University Research Farm during 2009 and 2010 farming seasons to evaluate the effect of intercropping maize with

Multi-Story Event Center & Basket Ball Arena – South Point Hotel Mojave Mental Health Facility Balboa Restaurant. Multi-Story Equestrian Arena – South Point Hotel

The main objective of this study was to compare the removal efficiency of nutrients using Lactuca sativa, Medicago sativa and Phragmites australis in subsurface flow