Application for Builders’ Risk

& Wrap-Up Liability Coverage

GENERAL INFORMATION

1. Name of Applicant: 2. Address of Applicant: Postal Code: 3. Name of Project: 4. Address/Location of Project: 5. Description of Project:

6. Project Participants (Names): Owner

Project/Construction Manager General Contractor

Prime Architectural/Engineering Consultant Geotechnical Engineer

7. Construction Period: From To

Policy Term (if different from above) From To 8. Construction Data:

Total Area (indicate Sq. Feet or Sq. Metres) Construction Materials

Framework Exterior Walls Foundation Type

Describe any unusual features of the building

Roof Structure Roof Covering

Floor Structure Floor Covering

HEIGHT OF STRUCTURE STOREYS FEET OR METRES

Below Grade Above Grade

(2)

9. Adjacent Structures (attach site plan if available):

10. Security:

11. Neighbourhood (Describe):

12. Subsurface Operations:

Describe the nature, duration, value and relationship to both the project and to adjacent structures. Blasting

Shoring Pile Driving Underpinning

13. Are there any demolition operations? Yes No If yes: (a) Anticipated Value:

(b) Description of demolition operations:

14. If any portion of the project will be occupied prior to completion, provide details (period, extent and nature of occupancy):

TYPE OF CONSTRUCTION OCCUPANCY DISTANCE NORTH

EAST SOUTH WEST

Fenced Site? Yes No Height/Type

Watchman Service? Yes No Hours/Rounds

Alarm? Yes No Alarm Sounds to

(3)

15. List Project Manager’s/General Contractor’s five (5) largest projects in the past five (5) years:

Name Type Location Value ($100,000s)

1. Total Estimated Project Value: Hard Costs Soft Costs

2. Completed Operations Period: 12 months 24 months Other:

3. Requested Limits of Liability: Deductible Options:

$ $

$ $ $ $ 4. Does the project attach to an existing structure? Yes No

If yes: (a) how will the structures connect?

(b) Occupancy of current structure during construction:

(c) What operation and income is likely to be affected if the existing structure is damaged?

5. Please describe any offsite operations or locations which require insurance:

6. Provide details of the loss control program to be implemented to protect insured property:

(4)

www.hubconstruction.ca

7. Claims Experience (Please explain any liability claims exceeding $10,000 per accident incurred by the owner, general contractor or project/ construction manager in the last three years):

Date Amount Nature of the claim

Date Amount Nature of the claim

Date Amount Nature of the claim

1. Total Estimated Project Value: $ (Attach breakdown if available)

Hard Costs: (Labour, materials, professional fees to enter into and form part of the project)

Soft Costs: (Finance costs, additional interest, leasing and marketing expenses, legal and account expenses, other carrying costs)

2. Other Property to be Insured: $

If coverage is required to existing structure, equipment to be furnished by the owner, etc., detail age, construction, condition, occupancy of such property

3. Is Business Interruption Coverage (Delayed Start-Up) required? Yes No If yes, type of income for $

4. Coverage:

BUILDER’S RISK

LIMITS DEDUCTIBLE

VALUE OF PROJECT $ $

(5)

4. Coverage:

Testing (electrical/mechanical breakdown during commissioning) weeks $ 5. List off-site locations and maximum value at each:

6. Transit:

List key items (individual items over $100,000 value) point of origin, location where insured accepts responsibility (F.O.B.):

7. Testing:

(a) Who will perform testing operations?

(b) Describe operations involved in testing and commissioning:

(c) Will project involve installations of any used equipment? Yes No 8. Location Information:

(a) Distance to nearest Fire Department (b) Name of city or town providing protection

(c) Hydrants (operational) Number within 1,000 ft (d) Describe private fire protection

(e) Will the project be sprinklered? Yes No If so, at which time will the sprinkler system be in operations? 9. Construction Data:

(a) Has a geotechnical report been completed? If not, please advise reasons

(b) Will the project be constructed in compliance with geotechnical recommendations? Yes No With Modifications

If modifications are required, describe in detail:

SUBLIMITS LIMITS DEDUCTIBLE

Soft Costs $ $

Delayed Start-up $ $

Off-site $ $

(6)

9. Construction Data:

(c) If a copy of the geotechnical report summary and recommendations is not available, provide soil descriptions:

(d) Type of foundation for each structure

(e) Are wood forms to be used? Yes No

(f) Describe any unusual or experimental features in construction or design

(g) Describe any special features such as stained glass, glass curtain walls, artwork to be incorporated or included

10. Flood Exposure:

(a) Nearest body of water: Name Distance (b) Past flood history at site

(c) Height of project above maximum flood stage

(d) Describe exposure during and after excavation from surface water (e) Describe precautions to be taken to prevent damage from flood

(f) What is being done to prevent run-off damage?

11. Site Risks:

Detail exposures from:

(a) Winter heating conditions (type of heaters)

(b) Explosion (Detail use of any highly flammable or explosive materials to be present on site)

12. If Soft Costs/Delayed Start-up coverage is required, please detail: (a) Contracted Completion Date

Anticipated Completion Date

Item Delivery Period Supplier Location

Item Delivery Period Supplier Location

Item Delivery Period Supplier Location

(7)

13. Provide details of your loss control program that will protect the insured property:

14. Claims Experience:

Detail any Builders’ Risk or Installation Floater claims (exceeding $10,000 per loss) incurred during the past five (5) years by the Owner, General Contractor and/or Project/Construction Manager indicating the dates, amounts and nature of claims:

When available, please provide:

(a) Breakdown of values for the various structures and types of work (b) Site plan indicating distance, construction and occupancy of exposures (c) Schedule of construction

(d) Summary and recommendations for the geotechnical report (e) Schedule indicating build-up of construction values

It is understood and agreed that the completion of this application does not bind the insurers to sell, nor does it obligate the applicant to purchase the insurance.

Name of Applicant Title

References

Related documents

KOTOpoMY COBepIDaIOT naJIOMHMqeCTBa npe,n:CTaBHTeJIM pa3HhlX KOH.peCCMH:.. C.1l.enaJI HCCne.1l.0BaTenbCKMH XOn.1l.MHr ROMIR Monitoring B X0.1l.e oKTH6pbCKoro BCepoccMHcKoro

 Wrap-up liability insurance programs: OCIPs and CCIPs  Builder’s risk and permanent property insurance...

Off-premises transportable equipment coverage for property damage, business income, extra expense and data restoration Cloud computing service interruption coverage.. Data

Coverages exposed: Home Owners, Auto, Commercial General Liability, Workers Compensation, Employers Liability, Property, Business Interruption, Event Coverage.. Basis of coverage:

You may extend the insurance provided by this Coverage Form to apply to loss or damage to sod, trees, shrubs and plants outside of buildings on the described premises, if the

(1) When a Covered Cause of Loss causes damage to property that is away from, but within 1,600 metres of the job site described in the Builders’ Risk Business Income Declarations,

(B) Disclose, in the case of my broker, the information obtained to insurers with whom he is doing business; when it is my insurers, to institutions that gather and compile data

2) WRAP UP LIABILITY COVERAGE Completed Operations Period: Limit(s) of Liability Insurance required: Other: Other: $ $ $ Deductible Requested: $ Deductible Requested: $