• No results found

Request for Quote E-Rate Eligible Services Scope of Work - Internal Connections: Network Infrastructure Equipment and Cabling

N/A
N/A
Protected

Academic year: 2021

Share "Request for Quote E-Rate Eligible Services Scope of Work - Internal Connections: Network Infrastructure Equipment and Cabling"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

(1)

Request for Quote – E-Rate Eligible Services

Scope of Work - Internal Connections: Network Infrastructure

Equipment and Cabling

Due Date: Allowable Contract Date from Posted 470

The Saddle Mountain Unified School District is requesting quotes for Network Infrastructure Equipment, Wireless LAN Equipment, Low Voltage Cabling and Fiber Optic Cabling per the detailed specifications and quantities listed below. The contract start date will be July 1, 2014 or upon notification of approval of E-Rate funding for this project; whichever comes later. In any case, no work will begin prior to July 1, 2014.

General Specifications:

The District is seeking services and pricing through an approved State Master Contract or other Cooperative Purchasing Contract that is acceptable according to the Arizona State Procurement Rules. Please be advised that this is a Request for Quote and not a formal sealed RFP/Bid process. Arizona State Procurement Code requires a formal sealed bidding process; or purchasing from an approved cooperative purchasing contract, or compliant consortium procured contract for any award in excess of $100,000.00. Any quote whose total value exceeds $100,000.00 and is not linked to a current approved cooperative purchasing contract, or a compliant consortium procured contract will be disqualified by Arizona State Procurement Code.

The pricing quoted must be compliant with the prospective vendor’s State Master Contract or Cooperative Purchasing Contract pricing structure. A copy of any and all contracts that the district will be expected to sign must accompany the quote provided.

All original contracts offered should not expire prior to September 30, 2015, and should include specifications that allow for extensions at the discretion of the applicant; not to exceed a total of 60 months.

All quotes must clearly identify the prospective vendor’s Cooperative Purchasing Contract number, if applicable, and E-Rate SPIN.

Please quote the cost for all equipment, supplies, and labor, including any costs for campus assessment, project management, documentation, travel, taxes, etc. All items on the Required Equipment List must be quoted; no partial quotes will be accepted.

(2)

2 | P a g e

The District will evaluate all compliant quotes received, and reserves the right to select the quote that is the most cost effective, compliant with FCC Fair and Competitive Bidding Rules. The District reserves the right to make multiple contract awards.

Failure to comply with these general specifications may be grounds for disqualification and award may be made to the next most cost effective provider.

If you need further information please contactEric Brunning via email at [email protected].

Equipment Specifications:

The preferred equipment brand is for Cisco Systems. However, equivalent brands can be quoted and will be considered. Any brands and models specified in the Required Equipment List below is included in order to establish the level of quality and/or feature set being sought. Please include a statement with your quote indicating the level of partnership your organization has with the original equipment manufacturer being proposed.

All equipment installed will be labeled by the successful vendor using durable labels. Labels will identify E-Rate year and E-Rate Funding Request Number.

The quote must include all Category 6 patch cables and fiber optic jumper cables. The patch cables should be a variety of 3 foot to 10 foot cables customized to the lengths needed in the rack space. Jumper cables should be a variety of 1 meter to 3 meters customized to the requirements of the rack space with connectors compatible with the equipment quoted.

The minimum acceptable warranty period is 3 years. Please specify the warranty period for all equipment quoted. If there is a cost to extend the warranty to meet the minimum requirement, please include this cost in the quote under ineligible for E-Rate support.

We are currently looking to upgrade the network infrastructure of the sites listed below along with the Cisco or equivalent devices mentioned.

Tartesso Elementary

 1 Cisco 4510R+E Chassis

 4 new UPOE 48 port blades

 1 - 12 port fiber blade

 1 - new Supervisor blade

 2 new 6000VAC power supplies for the Cisco 4510R+E chassis

(3)

Also needed is a new beefy 2U DC with Raid 5 configuration (fully populated drive bays with a min 300G drives). Minimum Specs include 4 - Intel processors, 32G RAM, Dual Power Supplies, and 10G Network Interface fiber card and a 10G SFP module.

New Cisco 2951 or better Voice Gateway Router with 4FXO interface card 4 - APC 5000 or equivalent UPS’s with Management cards

Tartesso’s IDF is in need of a Cisco 4507 or equivalent chassis switch with 4 UPOE 48 port blades with a Supervisor and a 10G SFP.

Ruth Fisher/Maintenance

All 5 IDF’s need upgraded to a Cisco 3750X stackable UPOE 10G interface or equivalent 48 port stackable Gig POE with 10 - 10G SFP Modules included.

Main building IDF needs a 10G fiber blade for a Cisco 4507 Chassis and 2 – 10G SFP modules.

Maintenance building needs a 24 port Cisco 3750X UPOE Gig uplink Stackable switch or equivalent. This requires 2 – 10G SFP’s for interconnectivity.

Tonopah Valley High School

Need 14 Cisco 3750X 48 port stackable UPOE switches or equivalent for 7 IDF’s with 10G uplinks and 14 - 10G SFP modules.

1 APC 5000 with Management Card or equivalent with down converter to 120v.

1 - 24 port Cisco 3750X or equivalent stackable UPOE with 10G interface and 2 - 10G SFP modules for Transportation.

1 – 8 port Cisco 3560X with 10G uplink and 2 - 10G SFP modules or equivalent with wall mount brackets for our Press Box.

Nutanix 3050 with 4 nodes and VMware licensing for new DC/DNS/DHCP/Remote Access Server and Mail server.

New Cisco 6513 or equivalent core chassis with 2 – 10G fiber blades, Supervisor blade, 8 – 48 port UPOE blades, WiSM2 Wireless Services Module.

New Cisco 3750X 48 port stackable UPOE 10G uplink with 2 - 10G SFP modules for District Office

(4)

4 | P a g e

20Kva APC or equivalent UPS for core Cisco 6500 chassis with network monitoring interface card.

Fiber Optic Cabling Specifications:

Each fiber optic cable run will meet the following specifications:

 All fiber optic cable runs will be (50 micron (OM4) multi-mode fiber).

 All fiber optic cable runs will be terminated on rack mounted LIUs using LC connectors.  All fiber optic cable runs will have Plenum rated jackets.

 All inside fiber optic cable runs will be indoor-rated. Any fiber optic cable runs that exit buildings and/or are pulled through in-ground conduit will be outdoor-rated and installed in inter-duct.

 The existing cabling plant will be removed in order to clear pathways for the new cabling plant. This cost must be included and identified in the quote.

 All fiber optic cable runs will be clearly and professionally labeled at each end of the run. Handwritten labels are not acceptable.

 The successful vendor will provide all fiber optic jumper cables. A variety of 1 meter to 3 meter jumper cables will be provided customized to the lengths needed in each rack space and terminated using LC/SC connectors.

 All fiber optic cable runs will be tested and certified. The successful vendor will provide a complete testing report for all fiber optic cable runs.

Required Minimum Number of Cable Runs

Location Number of MDF/IDF Number of Copper Drops Number of Indoor Fiber Runs Number of Outdoor Fiber Runs

Campus wide Cat6 4 200

Campus wide OM4 50micron 15 1000ft 3000ft

TES OM4 50micron 2 100ft

Vendor Qualifications:

(5)

2. Please include a statement with your quote indicating the level of partnership your organization has with the original equipment manufacturer being proposed.

3. Provide three references including the name of organization, address, contact person, and phone number for which a comparable installation was successfully completed.

Evaluation Criteria:

Evaluation of the quotes provided will be based on the following criteria in order of priority: 1. Cost of ELIGIBLE Services – Primary evaluation factor.

2. Cost of INELIGIBLE Services – Ineligible costs exceeding 30% of the total cost quoted may cause the district’s E-Rate funding request to be denied according to the FCC’s “30% Rule.” Such a quote may be determined to not be cost effective and result in possible disqualification.

3. Equivalence of Technical Design/Meets Scope of Work – Conformance with general and technical specifications.

References

Related documents

Web and desktop applications threats are one of the most often e-crimes at present time. We fulfilled research about the most often risks and we have chosen to propose an

Because much of the literature on teaching effectiveness or best practices in the online environment describes the importance of building community online or facilitating

These three cases seem to indicate that religion remains, for the French national minorities of Canada, a powerful identity marker, especially when the minority feels that its

In addition to understanding how the software classifier works, respondents listed other responsibilities for predictive coding experts: collaborate with the review team to create

For type testing in installation: Test circuit in the high-voltage lab at the University of Duisburg-Essen with the new PFISTERER accessories for 420 kV: IXOSIL outdoor

If the applicant is required to file a business or conversion plan with its primary regulator in order to obtain approval to conduct the business for which it is making this

U nastavku proračuna za prvi stupanj plinske turbine računati ćemo brzine na izlazu iz sapnica i ulazu u lopatice te tangencijalne i aksijalne komponente brzina, kako

Taken together, these results confirm tubulin as the molecular target of this series of β-lactam combretastatin derivatives and demonstrate mitotic catastrophe in MCF- 7 breast