™ ™
Healthcare
Buildings
4
(0–)
X
2006
Wernick Buildings Limited
Head Office:
Nidum Works, Neath Abbey, Neath, SA10 7DS.
Telephone: 01792 321222 Fax: 01792 321400
e-mail: sales@wernick.co.uk www.wernick.co.uk
Divisional Offices
Cutting costs not corners
The information supplied in this brochure is for general guidance only, detailed specification is supplied with our design and quotation.
Scotland Souterhouse Path, Dundyvan Industrial Estate, Coatbridge, Glasgow, ML5 4AQ. Telephone: 01236 425777 Fax: 01236 425888 South Wales & the West Nidum Works, Neath Abbey,
Neath, SA10 7DS. Telephone: 01792 321222 Fax: 01792 321400 West Country Bissoe, Truro, Cornwall, TR4 8QZ. Telephone: 01872 863404 Fax: 01872 865876 Northern England Portrack Grange Road, Portrack Industrial Estate Stockton on Tees TS18 2PH Telephone: 01642 603326 Fax: 01642 603367
Midlands & North Wales Aldridge House, Westgate, Aldridge, Walsall, WS9 8EX. Telephone: 01922 742622 Fax: 01922 742633
South & South East England Molineux House, Russell Gardens, Wickford, Essex, SS11 8BL. Telephone: 01268 735544 Fax: 01268 560026 Desi gn ed by www .plum-d esi gn.co.uk
Addresses shown are Main Divisional Sales Offices
This brochure is designed as a useful guide for all those involved in the design and provision of new build Hospital and Health Centre building projects.
Wernick Buildings has over 70 years experience in the manufacture and construction of modular buildings, and are rightly proud of their reputation for outstanding quality, value for money and high levels of customer service.
Wernick Buildings have been specified by Health Authorities and Health Practices throughout the UK and used for a variety of applications from doctor’s surgeries and healthcare centres, dental surgeries, dialysis units, wards and pathology laboratories to administration and on-site nurse accommodation and complete hospitals.
Wernick are used to working closely with all those concerned with healthcare building projects including NHS trust managers, architects and planners who can confidently draw on our design and manufacturing expertise.
All our buildings are based on the proven steel frame Rapidplan™ 3000 modular system. The units are
manufactured under strict quality controlled conditions to ISO 9001.
Wernick’s partnership for Health –
meeting the requirements of the Healthcare sector
• HTM compliant as required
• Flexible purchase/lease purchase or hire options
• Full design and build package
• Fast track building at competitive cost
• Fully complies with Building Regulations
• Flexible system with choice of finishes
• High quality build with low maintenance
• Scores highly in ‘best value’ assessment
• Nationwide service
Trust Wernick to meet your
Healthcare Building needs.
Rapidplan™ 3000 steel frame units are used toform buildings of any size and can be stacked to form buildings up to three storeys high.
A variety of external finishes are offered. Internally the building can be finished and equipped to meet specialist Health Technical Memorandum requirements. Buildings comply with all current building and fire safety regulations.
If you would like more information and detailed technical specification on Wernick Rapidplan™ 3000, or you wish to discuss a particular requirement or project, please contact the divisional office closest to your location.
Wernick Guide to Healthcare Buildings
Wernick was chosen because
of the rapidity with which
it was able to provide the
new accommodation.
Simon Shelter,
Mid Essex Senior Estates Manager Broomfield Hospital Chelmsford
6
5
Wernick provided us with
an option that would
limit disruption to the
hospital’s facilities
and was competitive.
John Moore, Principal Projects Manager with Estates and Business Agency in Coventry,
Wallsgrave Hospital, Coventry.
}
Your briefing can be as vague or as detailed as you like. From a sketch or fully documented architectural proposal, you can rely on us to get the job done.
Initial proposals and concepts are the starting point for more in-depth discussions which allow us to fully interpret your requirements and design a building to meet your needs.
We are able to progress the project through all stages including CDM Regulations, Planning and Building Regulation consents, manufacture and site installation including all groundworks and services.
We have an experienced team which includes CAD designers, contracts managers and structural engineers.
We maintain an approved list of specialist sub-contractors to carry out the site works under the direction of our contract managers.
We are able to include specialist clinical and laboratory furniture and services such as medical gases.
We’ll design a building to
suit your specific requirements
Complete Hospitals
Wernick’s Rapidplan™ 3000 buildings are fabricatedin a factory quality controlled environment and delivered to site with services and decoration completed where possible. The system incorporates an integral, robust steel frame which allows for stacking without additional structural support. This flexibility and fast track construction makes it ideal for either a new ward block or an entire Hospital.
Wernick buildings have been specified by local authorities, private practice and health trusts for short term use and for long term use as permanent buildings.
When working in partnership with architects and planners Wernick can call on its many years experience in the construction of healthcare buildings.
7
8
This way we get a very energy efficient, purpose-built
facility, ready wired for our IT needs and conforming to
all the latest Building Regulations.
Robert Forster, Trusts Project Engineer, Norfolk Health Trust, Norwich
}
~
Wernick proved to be the
best option. It delivers the
quality of building we
need in a financially
competitive way.
Mike Bunyan, Architect with designers Carless Adams, Battle Hospital, Berkshire
}
STUDIO POD STANDARD AT GROUND FLOOR LEVEL STUDIO POD ECONOMY AT GROUND FLOOR LEVEL STUDIO POD DE-LUXE AT FIRST FLOOR LEVEL BALCONY B BALCONY B STAIRCASE LOBBY ENTRANCE VESTIBULE STUDIO POD STANDARD AT GROUND FLOOR LEVEL STUDIO POD STANDARD AT GROUND FLOOR LEVEL STUDIO POD DISABLED AT GROUND FLOOR LEVEL STUDIO POD DE-LUXE AT FIRST FLOOR LEVEL
Staff accommodation
The low cost answer to staff accommodation problems.
9
10
Wernick Buildings offer a range of dwelling units including bungalows and multi occupancy studio blocks. Many NHS Trusts experience recruitment and staff retention problems because of the high cost of housing in their area.
These units offer the following benefits
• Traditional or modern finishes available
• Relocatable or permanent buildings
• Multi occupation or family units
• Assists in hospital recruitment and staff retention
• Fully comply with current building regulations
• Low maintenance finishes
• Low energy requirements keep running costs down
• Fast track construction at fixed price
Typical solutions
LIVING AREA STUDIO POD - STANDARD
LIVING MODULE - SINGLE BEDROOM LIVING MODULE - TWIN BEDROOM
COMPACTHOUSING UNIT - TWIN BEDROOM ??????????????????
STUDIO POD - DE-LUXE
KITCHEN "ALCOVE" LIVING AREA KITCHEN "ALCOVE" LIVING AREA BEDROOM BEDROOM LIVING AREA BEDROOM KITCHEN "ALCOVE" LIVING AREA BEDROOM BEDROOM BEDROOM BEDROOM KITCHEN/DINER LOUNGE KITCHEN "ALCOVE" BATHROOM BATHROOM BATHROOM BATHROOM SHOWER KITCHEN "ALCOVE" LIVING AREA STUDIO POD - STANDARD
LIVING MODULE - SINGLE BEDROOM LIVING MODULE - TWIN BEDROOM
COMPACTHOUSING UNIT - TWIN BEDROOM ??????????????????
STUDIO POD - DE-LUXE
KITCHEN "ALCOVE" LIVING AREA KITCHEN "ALCOVE" LIVING AREA BEDROOM BEDROOM LIVING AREA BEDROOM KITCHEN "ALCOVE" LIVING AREA BEDROOM BEDROOM BEDROOM BEDROOM KITCHEN/DINER LOUNGE KITCHEN "ALCOVE" BATHROOM BATHROOM BATHROOM BATHROOM SHOWER KITCHEN "ALCOVE" LIVING AREA STUDIO POD - STANDARD
LIVING MODULE - SINGLE BEDROOM LIVING MODULE - TWIN BEDROOM
COMPACTHOUSING UNIT - TWIN BEDROOM ??????????????????
STUDIO POD - DE-LUXE
KITCHEN "ALCOVE" LIVING AREA KITCHEN "ALCOVE" LIVING AREA BEDROOM BEDROOM LIVING AREA BEDROOM KITCHEN "ALCOVE" LIVING AREA BEDROOM BEDROOM BEDROOM BEDROOM KITCHEN/DINER LOUNGE KITCHEN "ALCOVE" BATHROOM BATHROOM BATHROOM BATHROOM SHOWER KITCHEN "ALCOVE"
Twin bedroom home
LIVING AREA STUDIO POD - STANDARD
LIVING MODULE - SINGLE BEDROOM LIVING MODULE - TWIN BEDROOM
COMPACTHOUSING UNIT - TWIN BEDROOM ??????????????????
STUDIO POD - DE-LUXE
KITCHEN "ALCOVE" LIVING AREA KITCHEN "ALCOVE" LIVING AREA BEDROOM BEDROOM LIVING AREA BEDROOM KITCHEN "ALCOVE" LIVING AREA BEDROOM BEDROOM BEDROOM BEDROOM KITCHEN/DINER LOUNGE KITCHEN "ALCOVE" BATHROOM BATHROOM BATHROOM BATHROOM SHOWER KITCHEN "ALCOVE"
De-luxe Twin bedroom compact housing unit
Single bedroom home
LIVING AREA STUDIO POD - STANDARD
LIVING MODULE - SINGLE BEDROOM LIVING MODULE - TWIN BEDROOM
COMPACTHOUSING UNIT - TWIN BEDROOM ??????????????????
STUDIO POD - DE-LUXE
KITCHEN "ALCOVE" LIVING AREA KITCHEN "ALCOVE" LIVING AREA BEDROOM BEDROOM LIVING AREA BEDROOM KITCHEN "ALCOVE" LIVING AREA BEDROOM BEDROOM BEDROOM BEDROOM KITCHEN/DINER LOUNGE KITCHEN "ALCOVE" BATHROOM BATHROOM BATHROOM BATHROOM SHOWER KITCHEN "ALCOVE"
Twin bedroom compact housing unit Studio pods
Options
• Single, two or three storey • Traditional finishes • Choice of services • Fully furnished • Hire, lease purchase
or outright purchase
Walls
The external walls are manufactured ‘off line’ and are of composite panel construction. This method of fabrication forms a sandwich in which all the
components are bonded in a press. This type of construction ensures quality throughout and produces a wall panel with excellent impact resistance. The walls can be clad in a variety of finishes or can be used to form an inner skin to a
traditional brickwork finish.
Roof
Roof options are either a cost effective warm deck finished in profiled steel, or traditional truss construction for tiles.
In both cases the building is delivered to site in a weatherproof condition to enable finishing trades
on site to complete their work without
the usual delays.
Floors
Floors are laid on galvanised steel floor joists and incorporate rigid insulation giving the required level of thermal protection.
Ceilings
Standard ceilings are 2.4m high finished in white vinyl faced plasterboard. Suspended ceilings with recessed lighting are available with 2.7m high ceiling option for larger areas.
Doors
Standard doors fitted are of aluminium for external use and self finished for internal use.
Internal Partitions
The internal walls are also
manufactured ‘off-line’ which helps achieve a shorter build time. The panels consist of self finished
plasterboard bonded onto timber frames. Sound
deadening infills and linings are
incorporated as required.
Windows
Powder coated, aluminium construction, double glazed with low E float glass to inner pane. UPVC also available.
Heating
Wet central heating by wall mounted radiators or ceiling panels. Also available, air conditioning and comfort cooling systems.
Electrical installations
Electrical installations are where possible fitted in the factory prior to delivery using standard fittings and wired in accordance with current I.E.E. Regulations.
Plumbing Installations
All plumbing within building sections is installed prior to delivery using white vitreous china sanitary-ware which complies with current regulations.
Specification & Comparison
11
12
The galvanised steel frame, Rapidplan™ 3000 system, is suitable for semi permanent and permanent buildings from single to 3 storeys high.
The structure of the system is all steel with timber in the walls and partitioning. A variety of external finishes are offered.
The system is based on modules 3.00m and 4.00m wide and in unit lengths from 6.00m to 12.00m. The steel frame modules are linked side-to-side, and/or end-to-end to form the building.
Two and three storey buildings are created by stacking the modules which incorporate their own steel frame without the need for any additional structural supports.
Using the Rapidplan™ 3000 steel frame system, reduces building programme times thus cutting the cost of building.
With Wernick Buildings there are no compromises on quality or comfort. Ask the already established list of clients from schools, local authorities, business the defence industry and many NHS Trusts.
The buildings include such items as passenger lifts, climate control, high levels of insulation and double glazed windows. We can also provide full IT installations, medical gases etc. to meet specific client requirements.
The flexibility of steel frame modular construction is often under estimated by designers. The modular Rapidplan™ 3000 system can be used to form buildings of any size, and can be added to at a later date, reduced in size, or even relocated.*
Wernick Buildings use maintenance free or low maintenance materials throughout their buildings to help keep running costs as low as possible.
It is also worth noting that most of the materials are recyclable should you ever wish to demolish the building!
*When built with re-location in the design
Benefits of the Rapidplan
™3000 building system
Rapidplan™ Traditional
3000 Build
Brickwork finish 4 4
Tiled pitched roof 4 4
Fast track construction 4 8
1, 2 or 3 Storey 4 4
Meets current building regulations 4 4
Permanent construction 4 4
Meets fire requirements 4 4
Reduced building cost 4 8
Design & build package 4 4
Long design life 4 4
Extra value for money 4 8
Solid walls 4 4
Possible to relocate standard buildings* 4 8
Choice of heating/air conditioning 4 4
Suspended ceilings 4 4
Pre-decorated 4 8
No drying out period 4 8
• Solid, permanent, quality buildings
• Virtually indestructible steel frame
• Accurately engineered for consistency and reliability
• Floor structure unaffected by wood boring insects/wood rot
• More dependable building programme
• Up to 50% faster to complete
• Low energy consumption
• Solid core walls – giving better impact resistance
• Resistant to earth tremors
• Complete design and build service from an experienced design team
• Fully complies with Building Regulation Requirements
• Fast track construction method keeps costs down
• Flexible, low maintenance building system
On comparison RapidplanTM3000 has the edge on traditional building.
The above information is supplied for general guidance and a detailed specification is supplied with our design and quotation.