-16,414.80
633437001 CONTRACT ID:
PROJECT: RMC - 633437001
CONTRACT:
12184004 PROJECTED AMOUNT: $304,046.00 CONTRACTOR:
HIGHWAY: US0271
DISTRICT NAME:
COUNTY:
AREA ENGINEER:
AREA NUMBER: 054 CATOCON, INC.
Tommy Bruce, P.E.
TITUS
ESTIMATE NUMBER:
to
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/09/21
12/13/2018 AWARD DATE:
ESTIMATE PERIOD:
0018
03/31/2021
LETTING DATE:
NOTICE TO PROCEED DATE: 01/14/2019
12/05/2018 ESTIMATE PAID:
428
123.00
ADJ. PROJECTED AMOUNT:
ESTIMATE TYPE: FINL WORK BEGIN DATE: 02/12/2019
$287,631.20 CONTRACT:
06/01/2020 AWARD AMOUNT: $304,044.00
ATLANTA
% COMPLETE:
% TIME USED:
% RETAINAGE: 0.00
99.77
ACCEPTED DATE:
PHYSICAL WORK COMPLETION DATE:
06/30/2020
00/00/0000
100.00
Estimate Number 0018
RECAPITULATION
TOTAL TO DATE PREV TO DATE THIS ESTIMATE
$165,030.70
ITEM EARNINGS
$139,005.70 $26,025.00
$0.00
PARTICIPATING
$0.00
$165,030.70
NON-PARTICIPATING
$26,025.00
$0.00
$0.00
RETAINAGE$0.00
LIQUIDATED DAMAGES
$0.00
$0.00
INCENTIVE
$0.00
$0.00
DISINCENTIVE
$0.00
$0.00
OTHER ADJUSTMENTS
$0.00
$139,005.70
$165,030.70
OWED TO CONTRACTORPREVIOUS ACCOUNT BALANCE CURRENT BALANCE
$0.00
$0.00
$139,005.70
$0.00
$0.00
$0.00
$0.00
PAID TO CONTRACTOR
-$300.00
$26,025.00 ($26,325.00)
$0.00
Estimate Number 0017
RECAPITULATION
THIS ESTIMATE
ITEM EARNINGS
$0.00
PARTICIPATING
$0.00
NON-PARTICIPATING
$0.00
RETAINAGE
Negative Estimate Period
LIQUIDATED DAMAGES
$0.00
INCENTIVE
$0.00
DISINCENTIVE
$0.00
OTHER ADJUSTMENTS
($26,325.00)
OWED TO CONTRACTOR
$0.00
($26,325.00)
Note: See Worked Performed Section for previous history.
CONTRACT ADJUSTMENTS THIS ESTIMATE
ADJUSTMENT DESCRIPTION:
ADJUSTMENT AMOUNT:
REMARKS:
LINE ITEM ADJUSTMENTS THIS ESTIMATE
ADJUSTMENT DESCRIPTION:
ADJUSTMENT AMOUNT:
REMARKS:
CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR
AREA/PROJECT ENGINEER
DATE
CONTRACT ID
633437001 ESTIMATE 0018
CONTRACTOR'S ESTIMATE PACKAGEPage 4 of 10
LIQ DAMAGE RATE:
LIQUIDATED DAMAGES:
TOTAL:
$590.00
$0.00 ASSESSED LIQ DAMAGES:
DAYS AT
$590.00 PER DAY
0 0
C. O. ADJUSTED DAYS:
428 BID DAYS:
CURRENT DAYS:
DAYS CHARGED TO DATE:
WORK BEGIN DATE:
TIME CHARGES BEGIN:
02/12/2019 02/12/2019
306 123 429
CONTRACT TIME STATEMENT
CONTRACT ID
633437001 ESTIMATE 0018
CONTRACTOR'S ESTIMATE PACKAGEPage 5 of 10
DAILY BREAKDOWN
Date or Days
Charged
Days Credited
PERIOD SUMMARY Days
Date or Days
Days Charged
Days Credited Diary
Adjustment
62 52 10
HOLIDAY 1
SUNDAY 9
05/01/2020 1 05/02/2020 1
05/03/2020 1 SUNDAY
05/04/2020 1 05/05/2020 1 05/06/2020 1 05/07/2020 1 05/08/2020 1 05/09/2020 1
05/10/2020 1 SUNDAY
05/11/2020 1 05/12/2020 1 05/13/2020 1 05/14/2020 1 05/15/2020 1 05/16/2020 1
05/17/2020 1 SUNDAY
05/18/2020 1 05/19/2020 1 05/20/2020 1 05/21/2020 1 05/22/2020 1 05/23/2020 1
05/24/2020 1 SUNDAY
05/25/2020 1 HOLIDAY
05/26/2020 1 05/27/2020 1 05/28/2020 1 05/29/2020 1 05/30/2020 1
05/31/2020 1 SUNDAY
06/01/2020 1 06/02/2020 1 06/03/2020 1 06/04/2020 1 06/05/2020 1 06/06/2020 1
06/07/2020 1 SUNDAY
06/08/2020 1
06/09/2020 1
06/10/2020 1
06/11/2020 1
06/12/2020 1
06/13/2020 1
CONTRACT ID
633437001 ESTIMATE 0018
CONTRACTOR'S ESTIMATE PACKAGEPage 6 of 10
06/14/2020 1 SUNDAY
06/15/2020 1 06/16/2020 1 06/17/2020 1 06/18/2020 1 06/19/2020 1 06/20/2020 1
06/21/2020 1 SUNDAY
06/22/2020 1 06/23/2020 1 06/24/2020 1 06/25/2020 1 06/26/2020 1 06/27/2020 1
06/28/2020 1 SUNDAY
06/29/2020 1
06/30/2020 1
CONTRACT ID
633437001 ESTIMATE 0018
CONTRACTOR'S ESTIMATE PACKAGEPage 7 of 10
WORK PERFORMED THIS PERIOD
Estimate Number 0018
PROJECT
RMC - 633437001
CONTROL633437001
CATEGORY
001
DESCRIPTIONCALLOUT MBGF REPAIR
ITEM CODE
DESCRIPTION UNIT UNIT
PRICE
QTY THIS ESTIMATE SP
NBR LINE
NBR
QTY Paid To Date Total Bid
Quantity AMOUNT PAID
THIS ESTIMATE
05006033 000 MOBILIZATION (CALLOUT) EA 400.000 2.000 $800.00
0070 15.00 12.36
07706001 000 REPAIR RAIL ELEMENT (W - BEAM) LF 20.000 656.250 $13,125.00
0120 2,134.90 2,791.15
07706003 000 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 45.000 7.000 $315.00
0130 15.00 7.00
07706011 000 REM / REPL TIMBER / STL POST W/CONC FND EA 50.000 6.000 $300.00
0140 25.00 118.00
07706021 000 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 26.000 75.000 $1,950.00
0150 777.20 852.20
07706028 000 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 900.000 1.000 $900.00
0170 11.00 12.00
96086001 UNIQUE CHANGE ORDER ITEM 1 DOL 3,530.000 2.000 $7,060.00
0171 26.00 10.00
Upgrade damaged Systems to current MASH Compliant System
07706017 REALIGN POSTS EA 15.000 25.000 $375.00
0173 200.00 119.00
07706006 RAISE RAIL ELEMENT LF 6.000 75.000 $450.00
0174 1,500.00 375.00
61856002 000 TMA (STATIONARY) DAY 150.000 5.000 $750.00
0235 25.00 24.17
$26,025.00
TOTAL ITEM EARNINGS THIS ESTIMATE
CONTRACT ID
633437001 ESTIMATE 0018
CONTRACTOR'S ESTIMATE PACKAGEPage 8 of 10
CONTRACT LINE ITEMS
633437001
PROJECTRMC - 633437001
CONTROL001 CALLOUT MBGF REPAIR
CATEGORY DESCRIPTION
ITEM CODE
DESCRIPTION SP
NBR
UNIT UNIT
PRICE
BID QUANTITY
NET CO QUANTITY
QTY PAID TO DATE
AMOUNT LINE
NBR SUPP DESCRIPTION $
0065 04326045 000 RIPRAP (MOW STRIP)(4 IN) CY 200.000 10.000 0.000 2.00 400.00
0070 05006033 000 MOBILIZATION (CALLOUT) EA 400.000 15.000 0.000 12.36 4,944.00
0075 05406001 000 MTL W-BEAM GD FEN (TIM POST) LF 15.000 250.000 0.000 50.00 750.00
0100 06586015 000 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 EA 13.000 30.000 0.000 1.00 13.00
0110 06586061 000 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 17.000 30.000 0.000 8.00 136.00
0115 06586062 000 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 19.000 30.000 0.000 2.00 38.00
0120 07706001 000 REPAIR RAIL ELEMENT (W - BEAM) LF 20.000 2,500.000 -365.100 2,791.15 55,823.00
0130 07706003 000 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 45.000 15.000 0.000 7.00 315.00
0135 07706010 000 REM / REPL TIMBER/STL POST W/O CONC FND EA 54.000 250.000 0.000 29.00 1,566.00
0140 07706011 000 REM / REPL TIMBER / STL POST W/CONC FND EA 50.000 25.000 0.000 118.00 5,900.00
0145 07706016 000 REPAIR STEEL POST WITH BASE PLATE EA 200.000 5.000 0.000 3.00 600.00
0150 07706021 000 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 26.000 1,000.000 -222.800 852.20 22,157.20
0155 07706022 000 REPLACE SINGLE GDRAIL TERMINAL POST EA 88.000 100.000 0.000 81.00 7,128.00
0170 07706028 000 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 900.000 30.000 -19.000 12.00 10,800.00
0171 96086001 UNIQUE CHANGE ORDER ITEM 1 DOL 3,530.000 0.000 26.000 10.00 35,300.00
Upgrade damaged Systems to current MASH Compliant System
0173 07706017 REALIGN POSTS EA 15.000 0.000 200.000 119.00 1,785.00
0174 07706006 RAISE RAIL ELEMENT LF 6.000 0.000 1,500.000 375.00 2,250.00
0200 07746028 000 REPAIR (QUAD) (N) (BAY) EA 500.000 10.000 0.000 3.00 1,500.00
0210 07746055 000 REPAIR (FASTRACC) (BAY) EA 1,000.000 10.000 0.000 10.00 10,000.00
0235 61856002 000 TMA (STATIONARY) DAY 150.000 25.000 0.000 24.17 3,625.50
Category Subtotal $165,030.70
633437001 RMC - 633437001
PROJECT CONTROL
001
CATEGORY DESCRIPTION
CALLOUT MBGF REPAIR
LINE NBR
ITEM CODE
SP NBR
DESCRIPTION UNIT UNIT
PRICE
BID QUANTITY
NET CO QUANTITY
QTY PAID TO DATE
AMOUNT SUPP DESCRIPTION ($)
0060 04296005 000 CONC STR REPAIR(DECK REP (FULL DEPTH)) SF 100.000 40.000 0.000 0.000 0.00
0069 04506018 RAIL (TY T631) LF 90.000 0.000 50.000 0.000 0.00
Change Order #4
0080 05406016 000 DOWNSTREAM ANCHOR TERMINAL SECTION EA 1,500.000 3.000 0.000 0.000 0.00
0085 05446004 000 GDRAIL END TRT(INST)(WOOD POST)(TY I) EA 1.000 2.000 0.000 0.000 0.00
0090 05446005 000 GDRAIL END TRT(INST)(WOOD POST)(TY II) EA 1.000 1.000 0.000 0.000 0.00
0095 05446006 000 GDRAIL END TRT(INST)(WOOD POST)(TY III) EA 1.000 1.000 0.000 0.000 0.00
0105 06586016 000 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 14.000 30.000 0.000 0.000 0.00
0125 07706002 000 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 45.000 25.000 0.000 0.000 0.00
0160 07706023 000 REPAIR OF TERMINAL ANCHORS POSTS EA 100.000 3.000 0.000 0.000 0.00
0165 07706024 000 REPLACE TERMINAL ANCHOR POSTS EA 100.000 10.000 0.000 0.000 0.00
0175 07746001 000 REMOVE AND REPLACE (TRACC) EA 12,000.000 2.000 -2.000 0.000 0.00
0180 07746004 000 REMOVE AND REPLACE (WIDE REACT 350) EA 20,000.000 2.000 -2.000 0.000 0.00
CONTRACT ID
633437001 ESTIMATE 0018
CONTRACTOR'S ESTIMATE PACKAGEPage 9 of 10
0190 07746008 000 REPAIR (WIDE TRACC) EA 4,000.000 2.000 0.000 0.000 0.00
0195 07746015 000 REPAIR (NARROW QUAD) EA 3,000.000 2.000 0.000 0.000 0.00
0205 07746038 000 REMOVE AND REPLACE (FASTRACC) EA 13,000.000 2.000 -2.000 0.000 0.00
0215 07766004 000 REPAIR (STL POST W/ DOUBLED W-BEAMS-T6) LF 40.000 25.000 0.000 0.000 0.00
0220 07766011 000 REP METAL POST W/ BASE PLATE(T101 RAIL) EA 100.000 15.000 0.000 0.000 0.00
0225 07766034 000 REPAIR(W-BEAM, TUBE & SPLICE-T101 RAIL) LF 40.000 100.000 0.000 0.000 0.00
0230 07766035 000 REPAIR (W-BEAM - T101 RAIL) LF 30.000 500.000 0.000 0.000 0.00
0240 96012001 MATERIAL ON HAND DOL 1.000 1.000 0.000 0.000 0.00
Material on Hand
0245 96022001 PAYMENT ADJUSTMENT-POS DOL 1.000 1.000 0.000 0.000 0.00
Payment Adjumstment - Positive
0250 96022002 PAYMENT ADJUSTMENT-NEG DOL -1.000 1.000 0.000 0.000 0.00
Payment Adjustment - Negative
0255 96066056 FORCE ACCOUNT - SAFETY CONTINGENCY DOL 1.000 1.000 0.000 0.000 0.00
Safety Contingency
0.00 Category Subtotal
TOTAL ITEM EARNINGS THIS CONTRACT
$165,030.70
CONTRACT ID
633437001 ESTIMATE 0018
CONTRACTOR'S ESTIMATE PACKAGEPage 10 of 10
CONSTRUCTION ESTIMATE COMBINED($) AMOUNT QTY PAID
TO DATE BID
QUANTITY UNIT
PRICE UNIT
DESCRIPTION SP
NBR ITEM
CODE
04326045 000 RIPRAP (MOW STRIP)(4 IN) CY 200.000 10.00 2.000 400.00
05006033 000 MOBILIZATION (CALLOUT) EA 400.000 15.00 12.360 4,944.00
05406001 000 MTL W-BEAM GD FEN (TIM POST) LF 15.000 250.00 50.000 750.00
06586015 000 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 EA 13.000 30.00 1.000 13.00
06586061 000 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 17.000 30.00 8.000 136.00
06586062 000 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 19.000 30.00 2.000 38.00
07706001 000 REPAIR RAIL ELEMENT (W - BEAM) LF 20.000 2,500.00 2,791.150 55,823.00
07706003 000 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 45.000 15.00 7.000 315.00
07706006 RAISE RAIL ELEMENT LF 6.000 0.00 375.000 2,250.00
07706010 000 REM / REPL TIMBER/STL POST W/O CONC FND EA 54.000 250.00 29.000 1,566.00
07706011 000 REM / REPL TIMBER / STL POST W/CONC FND EA 50.000 25.00 118.000 5,900.00
07706016 000 REPAIR STEEL POST WITH BASE PLATE EA 200.000 5.00 3.000 600.00
07706017 REALIGN POSTS EA 15.000 0.00 119.000 1,785.00
07706021 000 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 26.000 1,000.00 852.200 22,157.20
07706022 000 REPLACE SINGLE GDRAIL TERMINAL POST EA 88.000 100.00 81.000 7,128.00
07706028 000 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 900.000 30.00 12.000 10,800.00
07746028 000 REPAIR (QUAD) (N) (BAY) EA 500.000 10.00 3.000 1,500.00
07746055 000 REPAIR (FASTRACC) (BAY) EA 1,000.000 10.00 10.000 10,000.00
61856002 000 TMA (STATIONARY) DAY 150.000 25.00 24.170 3,625.50
96086001 UNIQUE CHANGE ORDER ITEM 1 DOL 3,530.000 0.00 10.000 35,300.00
Upgrade damaged Systems to current MASH Compliant System