• No results found

A Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses

N/A
N/A
Protected

Academic year: 2020

Share "A Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses"

Copied!
9
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1.  Proposed MCDM approach with interval computations for evaluating the RRAs in mega projects

References

Related documents

Ablation/ accumulation rates measured at a network of stakes in Horseshoe Valley show average accumulation of 70 kg m –2 a –1 in the central part of the valley, and a maximum

[r]

Miss Cold Spring Miss Jägers Miss Loreley Miss Rekatochklart Mister Postman Mistral Skift Mon Amie Skift Most Wanted As* (DE) Moveslikejagger Movieland Mr Hot Shot (FI)

By virtue of this legal provision, which implements into the Polish legal system the rules contained in Article 30(2) of the Directive, portability fees should not

[ 59 ] performed an in vitro biomechanical comparison of two-part fractures treated with an S3 plate and the Syn- thes locking plate and recorded higher stiffness for the S3 plate

Adopter une stra- tégie d’acculturation valorisée par le pays d’accueil et/ ou le pays d’origine est susceptible de donner une bonne image de la migrante elle-même mais

With that there was carried out an analysis based on all the stages of the MASP, in which, the first one would be in the identification of the problem if she used