• No results found

An Optimization Model for Multi-period Multi-Product Multi-objective Production Planning

N/A
N/A
Protected

Academic year: 2020

Share "An Optimization Model for Multi-period Multi-Product Multi-objective Production Planning"

Copied!
14
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1. Facility, suppliers, distributors and customer network. The problem is formulated as a mixed integer linear
Fig. 2. Model flow. The model considers fixed costs for all nodes, materials
Table I Verification model parameters
Table IV Number of batches transferred from the facility to distributors.
+6

References

Related documents

academic writing instruction; ACRL Standards; bibliographic instruction; critical librarianship; composition studies; information literacy; neoliberalism; new literacy studies;

We compare three different historical baseline methods and one innovative dynamic model baseline approach to appraise their applicability under a future REDD policy framework using

alternate earthing up and dibbling in flat and mulching up while dibbling on both sides of the bed in moist as well as in dry conditions followed by irrigation and weeding twice

Keywords: Deployable Structures, Girdle Beam Element, Scissor- Like- Element (SLE), Flats Scissor- Like-Elements and Structural Optimization.. Corresponding

exposure to traumatic events, PTSD symptomology, and use of coping methods is different than?. that of the

Beneath Keathley Canyon (KC) off the Southern Coast of Louisiana and Texas, allochthonous salt bodies have attained thicknesses of over 7620 m (25000 feet), providing excellent