Pilot evaluation of an adolescent risk and injury prevention programme incorporating curriculum and school connectedness components
Full text
Figure
Related documents
Using this method, we evaluated two different hypotheses: (1) that the Titan craters we observe are fresh and have similar depths to fresh Ganymede craters of the same size and (2)
Overall, the results showed significant improvement for both flow field and noise predictions when modeling inside the nozzle was applied, compared to the typical approach based
Przemyslaw “Mac” Stopa designs two installations for the Interni Hybrid Architecture & Design exhibition during Milan Design Week 2013: the Interni Press Room with Samsung
The dilemma for the social planner is: on one hand, selection efficiency would require that the contenders’ budget constraints be sufficiently relaxed via equity or risky debt
To determine the relationship between parental involvement and peers support with mathematics engagement among students secondary board- ing schools... To determine factors
This system that entail the contractor to be responsible for both the design and construction of the project, allows for the early start of construction through the
Comparative controlled local anesthetic blocks provided a prevalence rate of facet joint pain in patients with CLBP in postlumbar surgery syndrome of 16% (95% CI, 9% ⫺ 23%) in