Doc. No.:- E&I/SW/01/001 Issue No. / Date:- 001/01-12-2012 Rev. No / Date:- 000/00-00-000

S. No. ACTIVITY YES/NO REMARKS

1 Check Colour of Silica Gel in Breather ,If crystals are Pink,Replace with Reactivated Crystals.Check Oil Level in Oil cup,Top-up if required 2 Checking of Oil Leakage ,rectify wherever found.

3 Oil pumps and cooling fans to be cleaned and lubricated and trailrun of

each fans and pumps .

4 Checking of insulation & bushing and inspection for any crack/ chipping &oil level

BDV &DGA test to be made

400 KV MSDS-1 , JSPL Angul

TITLE

DEPARTMENT MAINTENANCE FORMAT FOR TRANSFORMER DEPARTMENT : ELECTRICAL &INSTRUMENTATION

MONTHLY MAINTENANCE OF TRANSFORMER

Switchyard Name :

Equipment Name :

DATE :

MAKE :

RATING :

(2)

S. No. ACTIVITY YES/NO REMARKS

1 Whether permit on the transformar taken. PTW No.

2

Whether the bay and the transformer in which maintenance is to done is identified correctly and the primary part discharged with the help of portable earth rod.

3 Whether isolation of deluge (Fire fighting) system is done.

4 Whether oil BDV, DGA,Oil PPM taken and recorded.

5 Whether Ground level earth connection on transformer & Transformer LA. Clean Corrosion as Required

6 Electrical Checking of Bucholz relay, Oil Surge Relay & Pressure Relieve Devices 7 Whether permit cancelled after completing the job.

8 Permit No.: Date: 9 Observation

QUARTERLY MAINTENANCE OF TRANSFORMER

Switchyard Name :

Equipment Name :

DATE :

MAKE :

RATING :

(3)

Doc. No.:- E&I/SW/01/001 Issue No. / Date:- 001/01-12-2012 Rev. No / Date:- 000/00-00-000

S. No. ACTIVITY YES/NO REMARKS

1 Whether permit on the transformar taken. PTW No.

2

Whether the bay and the transformer in which maintenance is to done is identified correctly and the primary part discharged with the help of portable earth rod.

3 Whether isolation of deluge (Fire fighting) system is done.

6 Inspection of main and OLTC MB's /contactors/ switches etc. to be carried out.for

mark of overheating in the TB/power & control cable.

12 Take Main Tank & OLTC Tank oil samples. Carry out DGA ,BDV &Oil PPM Tests & Record Results

13 Calbration of OTI and WTI to be carried out and Oil level in thermometre oil pockets checking and charging.

14 Cooling system , buchholz relay ,oil surge relay &PRV, interlock etc. to be checked . 15 Whether permit cancelled after completing the job.

16 Manual/ Auto starting of oil pumps & fans checked. 17 Permit No.: Date: TITLE

DEPARTMENT MAINTENANCE FORMAT FOR TRANSFORMER DEPARTMENT : ELECTRICAL &INSTRUMENTATION

MAINTENANCE OF TRANSFORMER

Switchyard Name :

Equipment Name :

DATE :

MAKE :

RATING :

(4)

S. No. ACTIVITY YES/NO REMARKS

1 Whether permit on the transformar taken. PTW No.

2

Whether the bay and the transformer in which maintenance is to done is identified correctly and the primary part discharged with the help of portable earth rod.

3 Whether isolation of deluge (Fire fighting) system is done.

4 The radiators clened externally.

5 The insulation & bushing are cleaned and inspection for any crack/ chipping carried out.

6 Inspection of main and OLTC MB's /contactors/ switches etc. carried out.for mark of overheating in the TB/power & control cable.

Inspection of OLTC operation . 7 Neutral Earth Pit Resistance

8 Cleaning of oil pumps and cooling fans and lubrication and trailrun of each fans and pumps .

9 Oil level of conservator tank, HV bushing checking and topping.

10 Insepection of Oil leakage and gasket damages and rectified wherever found.

11 Insepection of LV bushing chamber for any oil seepages.

12 Carry out IR Measurment & PI of wdgs

13 Tan delta,oil BDV, DGA,Oil PPM,winding resistance,IR value test to be taken and recorded.

14 Calbration of OTI and WTI to be carried out and Oil level in thermometre oil pockets checking and charging.

15 Checking of cooling system , buchholz relay , interlock etc. 16 Whether permit cancelled after completing the job. 17 Manual/ Auto starting of oil pumps & fans checked. 18 Permit No.: Date:

YEARLY MAINTENANCE OF TRANSFORMER

Switchyard Name :

Equipment Name :

DATE :

MAKE :

RATING :

(5)

Doc. No.:- E&I/SW/01/001 Issue No. / Date:- 001/01-12-2012 Rev. No / Date:- 000/00-00-000

S. No. ACTIVITY YES/NO REMARKS

1 Whether permit on the transformar taken. PTW No.

2

Whether the bay and the transformer in which maintenance is to done is identified correctly and the primary part discharged with the help of portable earth rod.

3 Whether isolation of deluge (Fire fighting) system is done.

4 Inspect Selector & Diverter Switch and Maintain in accordance with Manafacturer's

specification

5 Measurment of Winding resistance at all tap position 6 Measurment of winding Turns Ratio

7 Whether permit cancelled after completing the job. 8 Permit No.: Date: 9 Observation

TITLE

DEPARTMENT MAINTENANCE FORMAT FOR TRANSFORMER DEPARTMENT : ELECTRICAL 7INSTRUMENTATION

MAINTENANCE OF TRANSFORMER-5 YEAR

Switchyard Name :

Equipment Name :

DATE :

MAKE :

RATING :

References

Related documents

○ If BP elevated, think primary aldosteronism, Cushing’s, renal artery stenosis, ○ If BP normal, think hypomagnesemia, severe hypoK, Bartter’s, NaHCO3,

Quality: We measure quality (Q in our formal model) by observing the average number of citations received by a scientist for all the papers he or she published in a given

All of the participants were faculty members, currently working in a higher education setting, teaching adapted physical activity / education courses and, finally, were

Product mix is shifting towards Google and new customer sales have declined dramatically Product mix is shifting towards Google and new customer sales have declined dramatically

National Conference on Technical Vocational Education, Training and Skills Development: A Roadmap for Empowerment (Dec. 2008): Ministry of Human Resource Development, Department

Verb: Verbal, Phy.In: Physical Individual, Exclu: Social Exclusion, Rumour: Rumour spreading, Phy.grp: Physical group, Break: Breaking belongings, Mobile: sending a nasty text

As with other rapidly reconfigurable devices, optically reconfigurable gate arrays (ORGAs) have been developed, which combine a holographic memory and an optically programmable

Furthermore, while symbolic execution systems often avoid reasoning precisely about symbolic memory accesses (e.g., access- ing a symbolic offset in an array), C OMMUTER ’s test