SECTION C

(2)

__________________________________________________________________________________________________ Project ID : ISD 14/15 SS 26 I C/ 1 June 2015 Supply and Installation of F5 Viprion Load Balancer

and Access Policy Manager

Table of Contents

C/

1 Introduction and Overview... 2

1.1 Statement of Confidentiality ... 2

1.2 Mission and Overview ... 2

1.3 Purpose of the RFP ... 3

1.4 Tenderer Response ... 3

1.5 Delivery Plan ... 4

1.6 Selection Process and Evaluation Criteria ... 4

1.7 Acronyms ... 5

2 Statement of Work and Business Requirements ... 5

2.1 Objective ... 5

2.2 Project Description ... 5

2.3 Project Scope ... 5

2.4 Technical Specification ... 6

2.5 Project Deliverables: ... 7

(3)

__________________________________________________________________________________________________ Project ID : ISD 14/15 SS 26 I C/ 2 June 2015 Supply and Installation of F5 Viprion Load Balancer

and Access Policy Manager

1 Introduction and Overview

1.1

Statement of Confidentiality

This Request for Proposals (RFP) and all materials provided by Ashghal (Public Works Authority), concerning the affairs of the company, must be considered confidential. It must not be forwarded to any third party for evaluation or for any other purpose without the written consent of Ashghal.

When submitting confidential material to Ashghal, the Tenderer must clearly mark it as such.

1.2

Mission and Overview

Ashghal’s mission is to provide and maintain state-of-the-art infrastructure that fully meet the national economic and social development plans by adopting the best practices known internationally.

Background

Public Works Authority “ASHGHAL” was established on the basis of the Emiri Decree No. (1) issued by HH the Emir Sheikh Hamad bin Khalifa Al Thani on January 20, 2004, as an autonomous body to oversee all infrastructure related projects as well as public amenities of the State. The Emiri Decree stressed on quality and perfection of work as per international specifications and standards.

The establishment of ASHGHAL marked an important turning point in the history infrastructure development of the State of Qatar which has embarked on a major phase of change and development in all aspects of life.

Strategic goals & objectives

:

 Fully meet all our customers’ needs in the most efficient and effective manner.

 Develop a comprehensive communication strategy that raises the level of awareness of ASHGHAL’s activities externally (within the community) and internally (our employees).  Maximize the employment of Qatari nationals and realize their full potential.

 Develop the most competent "human capital" within the corporation with the emphasis on leadership, management and technical capabilities.

 Adopt and deploy best practice in the domain of infrastructure development and management.

 To comply with and exceed local and international standards in our practices.

 To fully optimize the use of all our resources to implement our plan in the most effective and efficient manner.

 To operate in a financially accountable and transparent manner and fully maximize the value we deliver from our funding expenditure.

(4)

__________________________________________________________________________________________________ Project ID : ISD 14/15 SS 26 I C/ 3 June 2015 Supply and Installation of F5 Viprion Load Balancer

and Access Policy Manager

1.3

Purpose of the RFP

The objective of this Request for Proposal (RFP) is to procure

F5 Viprion Load Balancer

solution. The solution should provide high availability, redundancy, load balancing and

centralized access policy enforcement for applications mentioned below and other

applications with high availability and centralized access policy requirements.

1.4

Tenderer Response

 The Tenderer(s)’s response shall include a Technical and Commercial Proposal with complete technical information and pricing details of their solution, products and services, which will meet or exceed Ashghal’s requirements and specifications as described in this document.

 The Tenderer shall also propose a clear implementation strategy and provide its corporate profile and scope of capability information.

 The proposal must contain the signature of a duly authorized officer or agent of the company submitting the proposal.

 The price you quote should be inclusive. If your price excludes certain fees or charges, you must provide a detailed list of excluded fees with a complete explanation of the nature of those fees.

(5)

__________________________________________________________________________________________________ Project ID : ISD 14/15 SS 26 I C/ 4 June 2015 Supply and Installation of F5 Viprion Load Balancer

and Access Policy Manager

 If the execution of work to be performed by your company requires the hiring of sub-contractors you must clearly state this in your proposal. Sub-sub-contractors must be identified and the work they will perform must be defined. In your proposal please provide the name, address, and EIN of the sub-contractor. ASHGHAL will not refuse a proposal based upon the use of sub-contractors; however we retain the right to refuse the sub-contractors you have selected.

 Provisions of this RFP and the contents of the successful responses are considered available for inclusion in final contractual obligations.

 ASHGHAL will negotiate contract terms upon selection. All contracts are subject to review by Contracts Affairs and Legal Affairs Departments, and a project will be awarded upon signing of an agreement or contract, which outlines terms, scope, budget and other necessary items.

1.5

Delivery Plan

The response must include a detailed Delivery Plan including Timeframes. The plan should be inclusive of any and all project phases.

ASHGHAL reserves the right to modify time estimated by bidder for a certain project activity or as a whole project after consulting with the bidder.

1.6

Selection Process and Evaluation Criteria

ASHGHAL selects services and solutions based on the best value and affordability in meeting or exceeding the company’s requirements. The Technical and Commercial

Proposals may be evaluated separately prior to the final decision. The technical evaluation will utilize a scoring approach based on requirements compliance and company capability to determine the value of a proposal.

The proposal will also be qualified according to its responsiveness according to following criteria:

 Shows understanding of the problem/s

 Adequately addresses stated objectives (e.g. makes recommendations)  Addresses standards, prototypes and other key issues.

 Exhibits creative thinking with proper clarity  How complete the response is

(6)

__________________________________________________________________________________________________ Project ID : ISD 14/15 SS 26 I C/ 5 June 2015 Supply and Installation of F5 Viprion Load Balancer

and Access Policy Manager

1.7

Acronyms

 ASHGHAL Public Works Authority

 ISD Information Systems Department. ASHGHAL.

 LTM Local Traffic Manager

 APM Access Policy Manager

2

Statement of Work and Business Requirements

2.1

Objective

The objective is to procure F5 Viprion. The solution should provide high availability, redundancy, load balancing and centralized access policy enforcement for any ASHGHAL applications.

2.2

Project Description

F5 Viprion is a scalable solution to provide high availability, redundancy, load balancing and centralized access policy enforcement for all ASHGHAL applications. F5 Viprion has multiple other features on-demand: Datacenter Firewall, Global Traffic Manager for site redundancy, secure DNS and support for application Centric Infrastructure in future. All functions are running in isolated virtual environment. Additional functionality can be procured by license purchase. Additional productivity can be covered by new blade purchase.

2.3

Project Scope

Contractor’s responsibility in respect of performance of Services under this Contract shall include, but not be limited to the following:

• All Manpower Tool and Equipment to deliver the complete solution. • Planning and Progress Statement.

• Contractor to provide a program of On-Site and Off-site activities within 14 days from Award.

• Devices in scope: 2 F5 Viprion in High Availability mode (Ref. 2.4 Technical Specifications)  Provision of Access Policy Management (APM) for 2500 users

• Installation, configuration and software upgrade to the latest available version. • Documentation of the installation and support processes.

 Knowledge transfer training for: a) LTM configuration training b) BIG-IP Administration training, and c) BIG-IP Edge Gateway and APM training

(7)

__________________________________________________________________________________________________ Project ID : ISD 14/15 SS 26 I C/ 6 June 2015 Supply and Installation of F5 Viprion Load Balancer

and Access Policy Manager

2.4

Technical Specification

Description Part No. QTY

VIPRION 2400 Local Traffic Manager Chassis (4 x Slots,

Dual AC Power Supplies) F5-VPR-LTM-C2400-AC 2 Level 1-3 Premium Service for VIPRION (7x24) F5-SVC-VPR-PRE-L1-3 6 VIPRION 2150 Blade (32 GB Memory, SSD, 8 x SFP+

Ports with 2 x 10GBASE-SR Transceivers included) F5-VPR-LTM-B2150 2 Level 1-3 Premium Service for VIPRION (7x24) F5-SVC-VPR-PRE-L1-3 6 VIPRION Access Policy Manager Base Module for 2400

Chassis (500 Concurrent VPN Users) F5-ADD-VPRAPM-C2400B 2 Level 1-3 Premium Service for VIPRION (7x24) F5-SVC-VPR-PRE-L1-3 6 BIG-IP & VIPRION SFP+ 10GBASE-SR Transceiver

(Short Range, Field Upgrade) F5-UPG-SFP+-R 8 VIPRION Virtual Clustered Multiprocessing License for

2400 Chassis F5-ADD-VPR-VCMP-2400 2

Level 1-3 Premium Service for VIPRION (7x24) F5-SVC-VPR-PRE-L1-3 6 VIPRION Add-on License for Access Policy Manager

(500 Concurrent VPN Users) F5-ADD-VPR-USER-500 2 Level 1-3 Premium Service for VIPRION (7x24) F5-SVC-VPR-PRE-L1-3 6 VIPRION Application Security Bundle for 44X0 Platform

(Application Security Manager, Advanced Client Authentication, Max SSL)

F5-ADD-VPR-ASM-C2400 2

Level 1-3 Premium Service for VIPRION (7x24) F5-SVC-VPR-PRE-L1-3 6

(8)

__________________________________________________________________________________________________ Project ID : ISD 14/15 SS 26 I C/ 7 June 2015 Supply and Installation of F5 Viprion Load Balancer

and Access Policy Manager

2.5

Project Deliverables:

Contractor is required to provide but not be limited to the following: • F5 Viprion hardware

• Latest software and licenses for LTM and APM

• Professional services for software installation, upgrade and configuration • Documentation of the following:

- F5 Viprion Installation processes - F5 Viprion administration document. - F5 support portal access.

-F5 APM Installation processes -F5 APM Administration document

Minimum 10 business applications should be configured for both LTM and APM.

2.6

ASHGHAL to provide

• Access to Data Center for hardware installation.

• Remote access from ASHGHAL office to F5 hardware installed in Datacenter. • The proper network setup for the new F5 Viprion solution.

2.7 Hardware and Software Compatibility Requirements:

The solution should have no conflict with most common browsers.

2.8

Support Services:

(9)

__________________________________________________________________________________________________ Project ID : ISD 14/15 SS 26 I C/ 8 June 2015 Supply and Installation of F5 Viprion Load Balancer

and Access Policy Manager

2.9

Time for Completion

The Time for Completion of the Services is illustrated as follows: Key Stage # Description Period for Completion in Calendar Days

Completion Period from Commencement Date (CD)

in Calendar Days 1

Supply of F5 Viprion Load Balancer and Access Policy

Manager 42 CD + 42

2 Installation, Configuration, Commissioning & Training 60 CD + 102

3 Support Services 1095 CD + 1197

Total Period CD + 1197

References

Related documents

California Proposition 65: This product contains a chemical known in the State of California to cause

Ratios of gene expression for 47 AP2/ERF genes of Hevea brasiliensis in response to latex harvesting stress in mature trees and various types of abiotic stress in juvenile

5 The Subconsultant agrees that, in the event of the termination of the Contract or in the event of the Consultant becoming insolvent or having a liquidator, receiver, manager,

• Compressor: Scaled up directly from the GE10 gas turbine with more than 100 units installed worldwide; 11 stages; 17:1 pressure ratio; IGVs and first- and second-stage stator

The 2021 Project Gryphon Turnaround will be utilizing Syncrude Location Services to enhance the safety and productivity of its workforce throughout the duration of the

Based on the results of this study, the researcher determined that mClass Reading 3D Oral Reading Fluency (ORF) and Text Reading and Comprehension (TRC) measures

Distance Education research emphasizes the importance of interactions (among students and between students and instructors) for effective distance teaching (Garrison, Anderson,