• No results found

SOMS: A Subway Operation and Maintenance System Based on Planned Maintenance Model with Train State

N/A
N/A
Protected

Academic year: 2020

Share "SOMS: A Subway Operation and Maintenance System Based on Planned Maintenance Model with Train State"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Structure of SOMS.
Figure 2. Interfaces of subway operation and maintenance system.
Table 2. Distinguish matrix table of maintenance support resources.
Figure 3. The whole maintenance business flow chart.
+3

References

Related documents

This means 14 minutes per average employee a day is spent on non-business email, in addition, recovery time has to be added for each interrupt.. If it takes 15 minutes to recover

pestis yapV yapK double mutant bound significantly less to A549 cells than did the parental nonmutated strain, and the phenotype was significantly complemented with a plasmid

[r]

To compare the responses of the principal and marginal macrocolumns to their responses to the same stimulus amplitudes but in isolation, single stimuli with amplitudes matching

The required characteristics for the diagnosis of BSCR according to Levinson [1] are bilateral disease, the presence of at least three peripapillary ‘ birdshot lesions ’ inferior

subsidiaries without imposing the profound burdens of a prior restraint against political expenditures on people and companies who in fact pose little or no risk of bringing

In the example questionnaire provided in this guide, the IBF module provides information for calculation of the indicators for the first sampling universe category, all children

Cost per item to (reverse) geocode is a function of the number of addresses to process in one batch.. An invoice will be submitted after geocoding has