• No results found

Risk Assessment of Highway Construction Projects using Fuzzy Logic and Multiple Regression Analysis

N/A
N/A
Protected

Academic year: 2020

Share "Risk Assessment of Highway Construction Projects using Fuzzy Logic and Multiple Regression Analysis"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table-2: impact and probability of risk factors
Fig -1: Rule viewer
Table -6: Regression parameters obtained from validation

References

Related documents

Flicker’s goals are (1) to provide multiple hardware options in terms of peripherals and harvesting technologies, (2) realize runtime and design time flexibility, (3) enable

The drinking water produced in Irish Water’s treatment plants for supply through the public water mains to each property meets all the requirements of the European Union

The treatment effect was better for juveniles and for high risk offenders, and was better in well‐documented programmes and programmes that were delivered

Figure 1 The anti-tumour effects of orlistat and cisplatin combination therapy in A2780cis human ovarian carcinoma xenografts. (b) Tumour

On the mound, starter Ruben Alaniz (9-9) earned is ninth win of the season after tossing five and one third innings, allowing four runs (just one earned) on seven hits and one

Linear feedback shift register, Miller-Rabin test, the Euclidean algorithm and the left-to-right-binary exponentiation algorithm have been successfully implanted using the

Anchorage-independent growth activity was examined using soft agar formation assays, whose results showed that TLE3 overexpression also repressed the proliferation of SW480 and

67-LR: 67-kDa laminin receptor; ANOVA: analysis of variance; BBB: blood – brain barrier; CNS: central nervous system; DMEM: Dulbecco ’ s modeified Eagle ’ s medium; EGCG: (