• No results found

Short term Wind Power Forecasting Algorithm Based on Similar Time Period Clustering

N/A
N/A
Protected

Academic year: 2020

Share "Short term Wind Power Forecasting Algorithm Based on Similar Time Period Clustering"

Copied!
10
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Schematic diagram of similar day prediction.
Figure 2. Schematic diagram of the reference vector.
TABLE 1. STATISTICS OF MONTHLY MEAN ERROR.
TABLE 2. THE CORRELATION COEFFICIENT BETWEEN POWER AND EACH METEOROLOGICAL FACTOR.
+2

References

Related documents

Especially Foucaultian discourse analysis should be regarded as a candidate, to be developed and applied in the theoretical frame of convention theory to elaborate EC’s capacity

Conclusions: The data presented in this study indicate that upregulation of g - cyto actin in dystrophic skeletal muscle can attenuate force loss during eccentric contractions and

However, to ensure the availability of platelets, if you have measures in place to promptly alert the transfusion service that the product has tested positive for bacterial

We contend that the concept of flood disadvantage offers a useful lens to appreciate the constraints of technical approaches to flood risk management, in particular, its

Rana proteinurija poslije Tx je neovisni čimbenik progresije intersticijske fibroze tijekom prve godine od Tx bubrega (p=0.02).. Pokazali smo da rana proteinurija može

BE IT RESOLVED that the Board of Education approves the High Bridge Board of Education School Maintenance Budget Amount Worksheet (Form M-1) and the detailed

Šiuolaikinio pasaulio būsenoje išskiriami du pasibaigus Šaltajam karui išryškėję civilizacinės savivokos „vektoriai“: Vakarų pusėje – istorijos užbaiga,

Configuration identification is the management of identification and order of the items (a configuration item is any item within the project which are subjec to the SCM process,