Review and Pit Optimization of

Eti Gümüs Silver Mine in Turkey

(according to international standards)

(according to international standards)

Authors:

Authors:

• Dirk Wagner

Senior Project Manager

IMC-Montan Consulting GmbH

Muhanned Arar GM Exploration and Development

Yildizlar SSS Holding

• Muhanned Arar GM Exploration and Development

Yildizlar SSS Holding

(2)

Contents

1.

Introduction

2.

Project

3.

Base Parameters

4

Results

4.

Results

5.

Future

(3)

Contents

1.

Introduction

2.

Project

3.

Base Parameters

4

Results

4.

Results

5.

Future

(4)

Introduction

Eti Gümüs – largest silver producer in Turkey

Preparation for IPO (Istanbul)

Preparation for IPO (Istanbul)

International Mining Consultancy was required for preparation

g

y

q

p p

of a report following Canadian NI 43-101 / JORC Code

Yildizholding selected IMC-Montan Consulting, a subsidiary of

DMT GmbH & Co. KG, member of TÜV-Nord Group

p

Scope of Work: - Operational and Life of Mine Plan (LOM)

(5)

Introduction

YILDIZLAR

 

SSS

 

YILDIZLAR

 

SSS

 

HOLDING

HOLDING

 

 

A.S.

A.S.

MINING GRUOP

MINING GRUOP

CERAMIC/GRANITE 

CERAMIC/GRANITE 

GROUP

GROUP

ENERGY 

ENERGY &PETROL

&PETROL

OTHER 

OTHER 

SERVICE

SERVICE

ETI

 

GUMUS

 

A.S

ETI

 

GUMUS

 

A.S

..

SOGUTSEN

SOGUTSEN

 

 

SERAMIK

SERAMIK

 

 

A S

A S

3S

3S

 

 

ENERJI

ENERJI

 

 

A.S.

A.S.

 

 

YSSS

 

ENTEGRE

 

YSSS

 

ENTEGRE

 

ORG TAR A S

ORG TAR A S

A.S.

 

A.S.

 

ORG.TAR.A.S.

ORG.TAR.A.S.

YILDIZ

 

BAKIR

 

A.S.

YILDIZ

 

BAKIR

 

A.S.

GRANITO

GRANITO

 

 

GIRARTO

GIRARTO

 

 

A.S.

A.S.

GUMUS

GUMUS

 

 

PETROL

PETROL

 

 

A.S.

A.S.

 

 

3S

3S

 

 

NAKLIYAT

NAKLIYAT

 

 

A.S.

A.S.

 

 

NESKO

 

MADEN

 

A.S.

 

NESKO

 

MADEN

 

A.S.

 

3S

3S

 

 

MADENCILIK

MADENCILIK

 

 

A.S.

A.S.

 

 

DEDELI

DEDELI

 

 

DOGALGAZ

DOGALGAZ

 

 

A.S.

A.S.

 

 

3S

3S

 

 

SIGORTA

SIGORTA

 

 

A.S.

A.S.

 

 

RAS

İ

H

 İ

HSAN

 

LTD.STI.

RAS

İ

H

 İ

HSAN

 

LTD.STI.

DEDELI

DEDELI

 

 

ELEKTRIK

ELEKTRIK

 

 

ENERJI

 

A.S.

ENERJI

 

A.S.

YILDIZLAR

 

SSS

 

PLAZA

 

YILDIZLAR

 

SSS

 

PLAZA

 

TURIZM

 

A.S.

TURIZM

 

A.S.

ZAMANTI

 

MADEN

 

ZAMANTI

 

MADEN

 

LTD.STI.

LTD.STI.

OSMANGAZI

OSMANGAZI

 

 

ELEKTRIK

ELEKTRIK

 

 

YILDIZLAR

YILDIZLAR LAB ANALIZ

LAB ANALIZ

DAGITIM

 

A.S.

DAGITIM

 

A.S.

YILDIZLAR

YILDIZLAR

 

 

LAB.ANALIZ

LAB.ANALIZ

 

 

HIZ.A.S.

HIZ.A.S.

YAVUZ

 

MUH.

 

A.S.

 

YAVUZ

 

MUH.

 

A.S.

 

SENA

 

YATIRIM

 

INS.A.S.

SENA

 

YATIRIM

 

INS.A.S.

DEDEL

İ 

YATIRIM

 

A.S.

 

DEDEL

İ 

YATIRIM

 

A.S.

 

SILVER

SILVER

 

 

KORUMA

KORUMA

 

 

GUVENLIK

 

A.S.

 

(6)

Introduction

TÜV NORD Group (Germany)

100%

DMT GmbH & Co. KG (Germany)

IMC-Montan Consulting

GmbH

(Germany)

IMC Group Consulting Ltd.

(UK)

DMT Geosciences Ltd.

(Canada)

PT IDMT EEC

(Indonesia)

IMC-Montan JV

(Russia)

100%

50%

100%

100%

74%

(Germany)

(UK)

(Canada)

(Russia)

(Indonesia)

51%

(7)

Introduction

TÜV NORD Group (Germany)

100%

DMT GmbH & Co. KG (Germany)

Planned in 2013/14

DMT-IMC Turkey

IMC-Montan Consulting

GmbH

(Germany)

IMC Group Consulting Ltd.

(UK)

DMT Geosciences Ltd.

(Canada)

PT IDMT EEC

(Indonesia)

IMC-Montan JV

(Russia)

100%

50%

100%

100%

74%

(Germany)

(UK)

(Canada)

(Russia)

(Indonesia)

51%

(8)

The Parent Company …

DMT GmbH & Co. KG at a glance

130 Mio. € annual turnover (2012)

Approx. 660 employees

16 government approved expert bodies for safety

3 accredited testing laboratories

3 accredited testing laboratories

(9)

Services for the Mining Industry

deposit-modelling

mine planning

greenfield development

process design

p

g

assistance during

operation

(10)

Geology & Orebody Modelling

Scope of Services IMC

Geology & Orebody Modelling

Resource/Reserve Estimates compliant

to JORC or NI 43-101

Bankable Studies

Bankable Studies

Engineering Services

-

Mine Design

-

Process Design

Project Management Services

Environmental & Social Impact

Assessments

Rehabilitation of Mine Sites

Investors‘ Support

-

Due Diligence

Mineral Expert Report

-

Mineral Expert Report

-

Project Valuations

Management Assistance during

Operation

p

(11)

Geology & Resources (DMT-EG)

Services

Mapping

Software Expertise

SURPAC

DATAMINE

Exploration

Resource evaluation

Geological risk analyses

DATAMINE

VULCAN

SURFER

IRAP RMS

IRAP RMS

PETREL

MINEX

ROCKWORKS

Planning and supervision of

2D and 3D seismic surveys

G

l

t i

i

t

Geotechnical analysis of rocks o in ts Plane of division Birdview ed d in g p la n e S lic ke n sid e) o nd it io n . B ed d in g 2 . T h ic k n es s in e ra liz in g 0 External form Splitting strength RQLD . P ro p e rt ie s o f ro ck s Rockstrength d [ N/ mm² ] of parting

LYNX

Geoelectrics, gravimetry a.o.

Prospecting and drilling

Sampling and QC

Borehole geophysics

1076 m 160 0 160 Seam 24 1078m Fl. 24 K B 1074 m 1072 m 1070 m B 2 0 SH SP SP 12 77 4 . J o SP SH SP SH SP SP SP SP 80 6 8 10 12 Bedding Intersaction 4 . B e g b X O X O X O G O O O 30 40 85 (S 6 . C o 1 7 . M u gurre weB100 B 8 0 B 6 0 B 4 0 14,4 8,4 7,2 5,1 8,6 [ N / mm² ] 100 45 65 Diametral Axial 9,6 14,4 14,4 37,6 27,7 14,4 60,6 56,7 40,0 52,9 33,2 57,8 85,5 75 50 25 3 B 1 0 k oabgezrle [ N / mm² ] 6,9 z

Borehole geophysics

1080 m 1078 m SH 13 X G O O 45 60 4,1 90 75 21,8 21,8 27,7 56,1 50 2575100

(12)

Rock Mechanics

Geotechnical Assessments

Stabilisation of Mine Workings

g

Assessment of underground

excavations

excavations

Simulation and Testing of Roof

Support elements

Support elements

Rock Burst Prevention

(13)

Extraction Technologies for Coal &

Extraction & Haulage

Extraction Technologies for Coal &

Ore

Layout and design of

Shovel & Truck

Long Wall

R&P

Bucket Wheel Mines

Life of Mine Plans

Layout and design of haulage

systems

Layout and Design of Backfilling

Plants

Plants

(14)

Mineral Processing

Processing Technologies

Coal

Iron Ore

Base Metals

L b

d Pil t Pl

t T

ti

Lab and Pilot Plant Testing

Simulation Software for

Processing

Flow Sheet Development

Design of Beneficiation Plants

(15)

Specialist Services

Underground Mine Ventilation

Coal Mine Methane & Utilisation

Mine Closure Planning

S b id

C

t l

Subsidence Control

Hydrogeology and Mine Water

Environmental Services

Environmental Services

Methane Inflow Forecast Calculation

Gas Outburst Prevention

(16)

Introduction – NI 43-101

Item 1:

Summary

Item 14: Mineral Resource Estimates

Item 2:

Introduction

Item 3:

Reliance on Other Experts

Item 4:

Property Description and

L

ti

Item 15: Mineral Reserve Estimates

Item 16: Mining Methods

Item 17: Recovery Methods

It

18 P j

t I f

t

t

Location

Item 5:

Accessibility, Climate, Local

Resources, Infrastructure and

Physiography

Item 18: Project Infrastructure

Item 19: Market Studies and Contracts

Item 20: Environmental Studies,

Permitting and Social or

Physiography

Item 6:

History

Item 7:

Geological Setting and

Mineralization

Permitting and Social or

Community Impact

Item 21: Capital and Operating Costs

Item 22: Economic Analysis

Mineralization

Item 8:

Deposit Types

Item 9:

Exploration

Item 10: Drilling

Item 22: Economic Analysis

Item 23: Adjacent Properties

Item 24: Other Relevant Data and

Information

Item 11: Sample Preparation,

Analyses and Security

Item 12: Data Verification

It

13 Mi

l P

i

d

Item 25: Interpretation and

Conclusions

Item 26: Recommendations

It

27 R f

Item 13: Mineral Processing and

Metallurgical Testing

(17)

Contents

1.

Introduction

2.

Project

3.

Base Parameters

4

Results

4.

Results

5.

Future

(18)
(19)

Project – other key data

Historical production up to 4 Mt/a

Target: Stable production of 4.32 Mt/a

Resource grade (measured and indicated): 128.6 g Ag/t and

0.68% Zn

(20)
(21)
(22)
(23)

Contents

1.

Introduction

2.

Project

3.

Base Parameters

4

Results

4.

Results

5.

Future

(24)

Base Parameters

First Time Pit Optimization for the Operation

Dataset not in the required format

Effort was required to collect and generate required

Effort was required to collect and generate required

dataset

(25)

Base Parameters

Final compiled set of base parameters for Pit Optimization

Sil

P i

30 US$/

Silver Price

30 US$/oz

Waste Mining Cost

1.95 $/t

Ore Mining Cost

2.15 $/t

Processing and G&A Cost

21.5 $/t

Silver Recovery

52 %

Mining Dilution

g

5 %

Mining Losses

5 %

Overall Pit Slope

45 deg

(26)

Contents

1.

Introduction

2.

Project

3.

Base Parameters

4

Results

4.

Results

5.

Future

(27)
(28)

Mine Development year 1

7 3 37 50 E 7 3 40 00 E 7 3 42 50 E 7 3 45 00 E 7 3 47 50 E 7 3 50 00 E 7 3 52 50 E 7 3 55 00 E 7 3 57 50 E 7 3 60 00 E 7 3 62 50 E 7 3 65 00 E 7 3 67 50 E 7 3 70 00 E 4373000 N 4373000 N

Year 1

4372000 N 4372000 N 4372500 N 4372500 N 4371000 N 4371000 N 4371500 N 4371500 N 4370000 N 4370000 N 4370500 N 4370500 N E E E E E E E E E E E E E E 4369000 N 4369000 N 4369500 N 4369500 N 7 3 37 50 7 3 40 00 7 3 42 50 7 3 45 00 7 3 47 50 7 3 50 00 7 3 52 50 7 3 55 00 7 3 57 50 7 3 60 00 7 3 62 50 7 3 65 00 7 3 67 50 7 3 70 00 4369000 N 4369000 N 0 100200300400500600700800900 1:20000

(29)

Mine Development year 2

7 3 37 50 E 7 3 40 00 E 7 3 42 50 E 7 3 45 00 E 7 3 47 50 E 7 3 50 00 E 7 3 52 50 E 7 3 55 00 E 7 3 57 50 E 7 3 60 00 E 7 3 62 50 E 7 3 65 00 E 7 3 67 50 E 7 3 70 00 E 4373000 N 4373000 N

Year 2

4372000 N 4372000 N 4372500 N 4372500 N 4371000 N 4371000 N 4371500 N 4371500 N 4370000 N 4370000 N 4370500 N 4370500 N E E E E E E E E E E E E E E 4369000 N 4369000 N 4369500 N 4369500 N 7 3 37 50 7 3 40 00 7 3 42 50 7 3 45 00 7 3 47 50 7 3 50 00 7 3 52 50 7 3 55 00 7 3 57 50 7 3 60 00 7 3 62 50 7 3 65 00 7 3 67 50 7 3 70 00 4369000 N 4369000 N 0 100200300400500600700800900 1:20000

(30)

Mine Development year 3

7 3 37 50 E 7 3 40 00 E 7 3 42 50 E 7 3 45 00 E 7 3 47 50 E 7 3 50 00 E 7 3 52 50 E 7 3 55 00 E 7 3 57 50 E 7 3 60 00 E 7 3 62 50 E 7 3 65 00 E 7 3 67 50 E 7 3 70 00 E 4373000 N 4373000 N

Year 3

4372000 N 4372000 N 4372500 N 4372500 N 4371000 N 4371000 N 4371500 N 4371500 N 4370000 N 4370000 N 4370500 N 4370500 N E E E E E E E E E E E E E E 4369000 N 4369000 N 4369500 N 4369500 N 7 3 37 50 7 3 40 00 7 3 42 50 7 3 45 00 7 3 47 50 7 3 50 00 7 3 52 50 7 3 55 00 7 3 57 50 7 3 60 00 7 3 62 50 7 3 65 00 7 3 67 50 7 3 70 00 4369000 N 4369000 N 0 100200300400500600700800900 1:20000

(31)

Mine Development year 4

7 3 37 50 E 7 3 40 00 E 7 3 42 50 E 7 3 45 00 E 7 3 47 50 E 7 3 50 00 E 7 3 52 50 E 7 3 55 00 E 7 3 57 50 E 7 3 60 00 E 7 3 62 50 E 7 3 65 00 E 7 3 67 50 E 7 3 70 00 E 4373000 N 4373000 N

Year 4

4372000 N 4372000 N 4372500 N 4372500 N 4371000 N 4371000 N 4371500 N 4371500 N 4370000 N 4370000 N 4370500 N 4370500 N E E E E E E E E E E E E E E 4369000 N 4369000 N 4369500 N 4369500 N 7 3 37 50 7 3 40 00 7 3 42 50 7 3 45 00 7 3 47 50 7 3 50 00 7 3 52 50 7 3 55 00 7 3 57 50 7 3 60 00 7 3 62 50 7 3 65 00 7 3 67 50 7 3 70 00 4369000 N 4369000 N 0 100200300400500600700800900 1:20000

(32)

Mine Development year 5

7 3 37 50 E 7 3 40 00 E 7 3 42 50 E 7 3 45 00 E 7 3 47 50 E 7 3 50 00 E 7 3 52 50 E 7 3 55 00 E 7 3 57 50 E 7 3 60 00 E 7 3 62 50 E 7 3 65 00 E 7 3 67 50 E 7 3 70 00 E 4373000 N 4373000 N

Year 5

4372000 N 4372000 N 4372500 N 4372500 N 4371000 N 4371000 N 4371500 N 4371500 N 4370000 N 4370000 N 4370500 N 4370500 N E E E E E E E E E E E E E E 4369000 N 4369000 N 4369500 N 4369500 N 7 3 37 50 7 3 40 00 7 3 42 50 7 3 45 00 7 3 47 50 7 3 50 00 7 3 52 50 7 3 55 00 7 3 57 50 7 3 60 00 7 3 62 50 7 3 65 00 7 3 67 50 7 3 70 00 4369000 N 4369000 N 0 100200300400500600700800900 1:20000

(33)

Mine Development year 6

7 3 37 50 E 7 3 40 00 E 7 3 42 50 E 7 3 45 00 E 7 3 47 50 E 7 3 50 00 E 7 3 52 50 E 7 3 55 00 E 7 3 57 50 E 7 3 60 00 E 7 3 62 50 E 7 3 65 00 E 7 3 67 50 E 7 3 70 00 E 4373000 N 4373000 N

Year 6

4372000 N 4372000 N 4372500 N 4372500 N 4371000 N 4371000 N 4371500 N 4371500 N 4370000 N 4370000 N 4370500 N 4370500 N E E E E E E E E E E E E E E 4369000 N 4369000 N 4369500 N 4369500 N 7 3 37 50 7 3 40 00 7 3 42 50 7 3 45 00 7 3 47 50 7 3 50 00 7 3 52 50 7 3 55 00 7 3 57 50 7 3 60 00 7 3 62 50 7 3 65 00 7 3 67 50 7 3 70 00 4369000 N 4369000 N 0 100200300400500600700800900 1:20000

(34)

Mine Development year 7

7 3 37 50 E 7 3 40 00 E 7 3 42 50 E 7 3 45 00 E 7 3 47 50 E 7 3 50 00 E 7 3 52 50 E 7 3 55 00 E 7 3 57 50 E 7 3 60 00 E 7 3 62 50 E 7 3 65 00 E 7 3 67 50 E 7 3 70 00 E 4373000 N 4373000 N

Year 7

4372000 N 4372000 N 4372500 N 4372500 N 4371000 N 4371000 N 4371500 N 4371500 N 4370000 N 4370000 N 4370500 N 4370500 N E E E E E E E E E E E E E E 4369000 N 4369000 N 4369500 N 4369500 N 7 3 37 50 7 3 40 00 7 3 42 50 7 3 45 00 7 3 47 50 7 3 50 00 7 3 52 50 7 3 55 00 7 3 57 50 7 3 60 00 7 3 62 50 7 3 65 00 7 3 67 50 7 3 70 00 4369000 N 4369000 N 0 100200300400500600700800900 1:20000

(35)

Mine Development year 8

7 3 37 50 E 7 3 40 00 E 7 3 42 50 E 7 3 45 00 E 7 3 47 50 E 7 3 50 00 E 7 3 52 50 E 7 3 55 00 E 7 3 57 50 E 7 3 60 00 E 7 3 62 50 E 7 3 65 00 E 7 3 67 50 E 7 3 70 00 E 4373000 N 4373000 N

Year 8

4372000 N 4372000 N 4372500 N 4372500 N 4371000 N 4371000 N 4371500 N 4371500 N 4370000 N 4370000 N 4370500 N 4370500 N E E E E E E E E E E E E E E 4369000 N 4369000 N 4369500 N 4369500 N 7 3 37 50 7 3 40 00 7 3 42 50 7 3 45 00 7 3 47 50 7 3 50 00 7 3 52 50 7 3 55 00 7 3 57 50 7 3 60 00 7 3 62 50 7 3 65 00 7 3 67 50 7 3 70 00 4369000 N 4369000 N 0 100200300400500600700800900 1:20000

(36)

Mine Development year 9

7 3 37 50 E 7 3 40 00 E 7 3 42 50 E 7 3 45 00 E 7 3 47 50 E 7 3 50 00 E 7 3 52 50 E 7 3 55 00 E 7 3 57 50 E 7 3 60 00 E 7 3 62 50 E 7 3 65 00 E 7 3 67 50 E 7 3 70 00 E 4373000 N 4373000 N

Year 9

4372000 N 4372000 N 4372500 N 4372500 N 4371000 N 4371000 N 4371500 N 4371500 N 4370000 N 4370000 N 4370500 N 4370500 N E E E E E E E E E E E E E E 4369000 N 4369000 N 4369500 N 4369500 N 7 3 37 50 7 3 40 00 7 3 42 50 7 3 45 00 7 3 47 50 7 3 50 00 7 3 52 50 7 3 55 00 7 3 57 50 7 3 60 00 7 3 62 50 7 3 65 00 7 3 67 50 7 3 70 00 4369000 N 4369000 N 0 100200300400500600700800900 1:20000

(37)

Mine Development year 10

7 3 37 50 E 7 3 40 00 E 7 3 42 50 E 7 3 45 00 E 7 3 47 50 E 7 3 50 00 E 7 3 52 50 E 7 3 55 00 E 7 3 57 50 E 7 3 60 00 E 7 3 62 50 E 7 3 65 00 E 7 3 67 50 E 7 3 70 00 E 4373000 N 4373000 N

Year 10

4372000 N 4372000 N 4372500 N 4372500 N 4371000 N 4371000 N 4371500 N 4371500 N 4370000 N 4370000 N 4370500 N 4370500 N E E E E E E E E E E E E E E 4369000 N 4369000 N 4369500 N 4369500 N 7 3 37 50 7 3 40 00 7 3 42 50 7 3 45 00 7 3 47 50 7 3 50 00 7 3 52 50 7 3 55 00 7 3 57 50 7 3 60 00 7 3 62 50 7 3 65 00 7 3 67 50 7 3 70 00 4369000 N 4369000 N 0 100200300400500600700800900 1:20000

(38)

Mine Development year 11

7 3 37 50 E 7 3 40 00 E 7 3 42 50 E 7 3 45 00 E 7 3 47 50 E 7 3 50 00 E 7 3 52 50 E 7 3 55 00 E 7 3 57 50 E 7 3 60 00 E 7 3 62 50 E 7 3 65 00 E 7 3 67 50 E 7 3 70 00 E 4373000 N 4373000 N

Year 11

4372000 N 4372000 N 4372500 N 4372500 N 4371000 N 4371000 N 4371500 N 4371500 N 4370000 N 4370000 N 4370500 N 4370500 N E E E E E E E E E E E E E E 4369000 N 4369000 N 4369500 N 4369500 N 7 3 37 50 7 3 40 00 7 3 42 50 7 3 45 00 7 3 47 50 7 3 50 00 7 3 52 50 7 3 55 00 7 3 57 50 7 3 60 00 7 3 62 50 7 3 65 00 7 3 67 50 7 3 70 00 4369000 N 4369000 N 0 100200300400500600700800900 1:20000

(39)

Mine Development year 12

7 3 37 50 E 7 3 40 00 E 7 3 42 50 E 7 3 45 00 E 7 3 47 50 E 7 3 50 00 E 7 3 52 50 E 7 3 55 00 E 7 3 57 50 E 7 3 60 00 E 7 3 62 50 E 7 3 65 00 E 7 3 67 50 E 7 3 70 00 E 4373000 N 4373000 N

Year 12

4372000 N 4372000 N 4372500 N 4372500 N 4371000 N 4371000 N 4371500 N 4371500 N 4370000 N 4370000 N 4370500 N 4370500 N E E E E E E E E E E E E E E 4369000 N 4369000 N 4369500 N 4369500 N 7 3 37 50 7 3 40 00 7 3 42 50 7 3 45 00 7 3 47 50 7 3 50 00 7 3 52 50 7 3 55 00 7 3 57 50 7 3 60 00 7 3 62 50 7 3 65 00 7 3 67 50 7 3 70 00 4369000 N 4369000 N 0 100200300400500600700800900 1:20000

(40)

Mine Development year 13

7 3 37 50 E 7 3 40 00 E 7 3 42 50 E 7 3 45 00 E 7 3 47 50 E 7 3 50 00 E 7 3 52 50 E 7 3 55 00 E 7 3 57 50 E 7 3 60 00 E 7 3 62 50 E 7 3 65 00 E 7 3 67 50 E 7 3 70 00 E 4373000 N 4373000 N

Year 13

4372000 N 4372000 N 4372500 N 4372500 N 4371000 N 4371000 N 4371500 N 4371500 N 4370000 N 4370000 N 4370500 N 4370500 N E E E E E E E E E E E E E E 4369000 N 4369000 N 4369500 N 4369500 N 7 3 37 50 7 3 40 00 7 3 42 50 7 3 45 00 7 3 47 50 7 3 50 00 7 3 52 50 7 3 55 00 7 3 57 50 7 3 60 00 7 3 62 50 7 3 65 00 7 3 67 50 7 3 70 00 4369000 N 4369000 N 0 100200300400500600700800900 1:20000

(41)

Mine Development year 14

7 3 37 50 E 7 3 40 00 E 7 3 42 50 E 7 3 45 00 E 7 3 47 50 E 7 3 50 00 E 7 3 52 50 E 7 3 55 00 E 7 3 57 50 E 7 3 60 00 E 7 3 62 50 E 7 3 65 00 E 7 3 67 50 E 7 3 70 00 E 4373000 N 4373000 N

Year 14

4372000 N 4372000 N 4372500 N 4372500 N 4371000 N 4371000 N 4371500 N 4371500 N 4370000 N 4370000 N 4370500 N 4370500 N E E E E E E E E E E E E E E 4369000 N 4369000 N 4369500 N 4369500 N 7 3 37 50 7 3 40 00 7 3 42 50 7 3 45 00 7 3 47 50 7 3 50 00 7 3 52 50 7 3 55 00 7 3 57 50 7 3 60 00 7 3 62 50 7 3 65 00 7 3 67 50 7 3 70 00 4369000 N 4369000 N 0 100200300400500600700800900 1:20000

(42)

Price sensitivity of Gümüsköy pit optimization

Results

500

600

80.000

90.000

400

500

60.000

70.000

/t]

0

00 t]

200

300

30 000

40.000

50.000

Grade [g

Ag

/

Ore tonnage

[0

100

200

10.000

20.000

30.000

0

0

0

5

10

15

20

25

30

35

40

(43)

Results

Unit

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

O

P d ti

000 t

4 320

4 320

4 320

4 320

4 320

4 320

4 320

4 320

4 320

4 320

Production Schedule – optimized to receive constant head grade

Ore

 

Production

000

 

t

4,320

4,320

4,320

4,320

4,320

4,320

4,320

4,320

4,320

4,320

Ore

 

Grade

g/t

145

145

143

145

146

146

146

138

136

138

Waste

 

removal

000

 

t

4,468

3,762

4,017

3,892

3,528

3,335

3,527

2,832

4,084

4,299

Stripping

 

Ratio

t/t

1.03

0.87

0.93

0.90

0.82

0.77

0.82

0.66

0.95

1.00

Recovery

y

 

Ore

%

52

52

52

52

52

52

52

52

52

52

Recovered

 

Ag

kg

325,116

326,442

320,327

325,522

327,362

328,250

328,565

311,026

306,613

308,899

Unit

2023

2024

2025

2026

2027

2028

2029

2030

Total

Ore

 

Production

000

 

t

4,320

4,320

4,320

4,320

4,320

4,320

4,320

172

73,612

Ore

 

Grade

g/t

140

140

152

148

140

136

116

114

141

Waste

 

removal

000

 

t

3,661

3,634

7,371

8,125

7,517

6,141

17,457

745

92,396

Stripping

 

Ratio

t/t

0.85

0.84

1.71

1.88

1.74

1.42

4.04

4.33

1.26

Recovery Ore

%

52

52

52

52

52

52

52

52

Recovery

 

Ore

%

52

52

52

52

52

52

52

52

Recovered

 

Ag

kg

315,578

314,361

341,429

332,374

313,499

306,059

261,510

10,214

4,511,864

(44)

Contents

1.

Introduction

2.

Project

3.

Base Parameters

4

Results

4.

Results

5.

Future

(45)

Future

Operational and Life of Mine Plan (LOM) of Eti Gümüs based

on optimization results

Reconciliation to improve the accuracy of the geological

model

Establishing long/short-term mine plan and updating it

(46)

For more information, please contact

THANK YOU VERY MUCH FOR YOUR ATTENTION

IMC M

t

C

lti

G bH

Mi h

l L

Ul i h R

l

IMC-Montan Consulting GmbH

Am Technologiepark 1

45307 Essen / Germany

Michael Loos

Ulrich Ruppel

Technical Director

Mining Director

Tel. +49 201 172-1536

Tel. +49 201 172-1507

www.dmt.de

www.imcgcl.com

Fax +49 201 172-1727

Fax +49 201 172-1727

michael.loos@dmt.de

ulrich.ruppel@dmt.de

References

Related documents

Although surgery on the gall bladder is about as common as that for inguinal hernia and appendicitis, what anatomical fact accounts for the much higher frequency of

The SSR estimated from the shadow/ZLB term structure model can evolve to negative level in the ZLB environment and provide consistent view of the stance of

Pada penelitian ini setiap variabel akan diukur dengan indikator-indikator yang sesuai dengan variabel yang bersangkutan agar tidak terjadi kesalahpahaman atau perbedaan

The Arizona Department of Public Safety (DPS) is mandated by law to coordinate a program that uses state of the art technologies that is implemented based on the statewide

We hypothesized that higher intake of vitamin B-6, vitamin B-12, folate, folic acid, and methionine were associated with favorable body composition outcomes, since these

determining what type of outsourcing is required and choosing the most appropriate laboratory, companies can reap a great deal of benefits, which far outweigh the drawbacks.

Column 1 shows that the long-run elasticity of consumption with respect to aggregate wealth is relatively large 0.0921.8 Column 2 suggests that the marginal propensity to consume out

Alternating foot -5 second rapid pulse followed by a 1 second pause Workout 2- High impact.. Alteranting foot-1 second rapid burst followed by a 1 second pause Workout1—high