• No results found

Application CCM: A Customer Experience Session Software Logistics Approach at ABN AMRO

N/A
N/A
Protected

Academic year: 2021

Share "Application CCM: A Customer Experience Session Software Logistics Approach at ABN AMRO"

Copied!
25
0
0

Loading.... (view fulltext now)

Full text

(1)

Software Logistics at ABN AMRO Bank

Application CCM: A Customer Experience

Session 8407

Software Logistics Approach at ABN AMRO

Jan Boef

Wednesday, July 25 2001 @ 4:30pm

(2)

Software Logistics at ABN AMRO Bank

ABN AMRO Bank

• Ranked as Europe’s 5 large bank and 16 largest of the world

• Total assets Euro 533 bn • approx. 3500 branches • 110.000 employees

• Headoffice in Amsterdam, the Netherlands • over 10.000 people in ICT

(3)

Software Logistics at ABN AMRO Bank

Speaker info

• Jan Boef

• 29 years in ICT

• Experience in Development and Operations

• Solution Integrator with ICT as business • Area’s: Software Logistics

(4)

Software Logistics at ABN AMRO Bank Concept of software logistics

ST Acc PR DWH Req Design Coding UT/UIT Information Warehouse

(5)

Software Logistics at ABN AMRO Bank Delivery C u s to m e r Assembly A B C Design Product Warehouse Purchasing Specifications D Construction Order Internal Part Stock The CHIPS-model

(6)

Software Logistics at ABN AMRO Bank development maintentance part checking Release assembly Release checking Configuration checking Distribution Installation Software Parts Warehouse Software Products Repository Support & monitoring dev el opm ent m anagem ent rel eas e m anagem ent Conf igur at io n m anagem ent Problem reports Product &-part -design Product & part definitions Productwishes Market trends System configurations prod uc t m anagem ent purchase

(7)

Software Logistics at ABN AMRO Bank

Migration plan Start situation

A D D S Tools OVS HOS ???

(8)

Software Logistics at ABN AMRO Bank Migration plan A D D S Tools OVS HOS ??? Audit Repository ARTIS 1

(9)

Software Logistics at ABN AMRO Bank Migration plan A D D S Tools OVS HOS ??? Repository ARTIS ISPW 2 1

(10)

Software Logistics at ABN AMRO Bank Migration plan A D D S HOS Repository ARTIS ISPW 2 1 3

(11)

Software Logistics at ABN AMRO Bank Migration plan A D D S HOS Repository ARTIS ISPW 2 1 3 Dev. Tools 4 4 3

(12)

Software Logistics at ABN AMRO Bank Migration plan A D D S HOS Repository ARTIS ISPW 2 1 3 Dev. Tools 4 4 3 5

(13)

Software Logistics at ABN AMRO Bank

Status today

• ISPW fully implemented for MVS • Migration in 5 weekends

• 750 developers and supporters use ISPW • 400.000 components in ISPW, with

versions in 30 lpars

• 80 componenttypes defined • 390 applications

(14)

Software Logistics at ABN AMRO Bank

Benefits of ISPW

1 OVERVIEW

• Which components belong to an application • Which ones are in development/test

• Which versions exist and what is their status • Who did what with a component

• What is the content of a release

• Which components of an assignment are completed

• Which troubleshootversions are in production • ………...

(15)

Software Logistics at ABN AMRO Bank

Benefits of ISPW

2 SURENESS

• Feedback on distribution of a component • Only one active version on a level

• Parallel development/implementation supported • Formal process for troubleshoot

• QA processes standardized • Controlled generation

• Negative handover with consistency

• Clean up of components that do not reach production

(16)

Software Logistics at ABN AMRO Bank

Benefits of ISPW

3 SPEED

• Distribution per release/set

• Administration is always reflecting reality • Realtime processing in distribution

• Scheduling for implementation in production • Easy to learn

• Easy to take over activities • ……...

(17)

Software Logistics at ABN AMRO Bank

The way forward

Evaluation of the migration plan: • ISPW BenchMark is developing

functionality for multi-platform release management

• Our repository solution appears to be end-of-life

• Hyperlinks and data warehousing

(18)

Software Logistics at ABN AMRO Bank

Next steps

• Extending release management • Impact analysis

• Integrated systems documentation • Automated transformations

(19)

Software Logistics at ABN AMRO Bank

Release management

• Distribution under control of ISPW • Activation under control of ISPW • Enhanced fallback possibilities

• Also for non-MVS target platforms • 7x24 hours support

• Integration with non-MVS development • Enhanced audit possibilities

(20)

Software Logistics at ABN AMRO Bank

Impact analysis

• Which information is needed for which ICT activity and why

• Which approval procedures are necessary and why

• How to cope with changes in services that are used in many applications

• Leads to requirements for systems documentation

(21)

Software Logistics at ABN AMRO Bank

Systems documentation

• Which documentation is really needed • When is it needed

• Which documentation can be generated • Integrated QA for documentation in the

logistics process

• Status of documentation connected to status of application

(22)

Software Logistics at ABN AMRO Bank

Automated transformation

• Programming languages are formal languages

• For JCL we are doing this already for many years

• Y2K was very expensive

• A lot of testing is wasted time

(23)

Software Logistics at ABN AMRO Bank

We are just at the beginning of

our job.

The current implementation of

ISPW is a solid basis

(24)

Software Logistics at ABN AMRO Bank

We want to compete in eTime

with business strength

(25)

Software Logistics at ABN AMRO Bank

References

Related documents

The results indicated that, while evaluating port throughput criteria, Colombo is the highest ranked port with a relative closeness index (RCI) of 0.95. The port provided

Moody’s Investors Service, Inc., a wholly-owned credit rating agency subsidiary of Moody’s Corporation (“MCO”), hereby discloses that most issuers of debt securities

Previously, associated with Bank of America, ABN AMRO Bank and Fullerton India Credit

Sheet Index: S1 Splice Connections S2 Brace Connections S3 Beam-Column Connections S4 Beam-Beam Connections S5 Miscellaneous Details S6 Composite Beams 6 COV MISCDET_STL 2007 TBQ

There is already a considerable amount of work within Biological Physics regarding the concept of entropy in biological systems (e.g., Udgaonkar 2001), but we will try to give

Internally available Cloud •DashDB •Google Cloud SQL •Microsoft Azure •Hadoop… Access 100 Sources • DB2 • Netezza.. Cloud •DashDB •Google Cloud SQL •Microsoft

(1) Tenant sales performance in Unibail- Rodamco’s shopping centres (excluding the Netherlands) on portfolio of shopping centres in operation including extensions of existing

This study which focused on re-engineering corporate culture and organizational receptivity to change, through its research methodology discovered a significant