E x p e r t P l a n n i n g f o r

T e c h n o l o g i c a l E n g i n e e r i n g

F i n a n c i a l P r o j e c t

(2)

B u s i n e s s P o r t f o l i o

E x p e r t P l a n n i n g f o r

Te c h n o l o g i c a l E n g i n e e r i n g

F i n a n c i a l

P r o j e c t M a n a g e m e n t

• Biogas from biowastes and renewable

raw materials

• Biomethane injection to gas distribution system

• Use of biomass in combined cycle power plants

• Feasibility Studies

Biomass surveys, material flow analysis, contract negotiation,

approvability studies

• Concept and Project Development

Biogas plants, heat efficiency concepts, combined cycle power plants,

bioenergy villages

• Technology Comparison and Evaluation

Single component and system comparisons, process analysis

• Energy Concepts

Combined cycle power plants, micro networks, process steam supply,

ORC-plants, fuel cells

- Commercial Project Management

- Economic Analysis

- Investor Consolidation

- Operating Control

(3)

B i o g a s R e f i n e m e n t t o N a t u r a l G a s

Q u a l i t y a n d I n f e d t o G a s G r i d

G r u n d l a g e n

• Economic Analysis

Tailored and system approaches

• Approval Planning

Preliminary planning, concept adoption, approval planning according

to BImSchG and building lease

• Project Execution

Construction supervision, quality management, start-up

• Supervision

Analysis and biological process assessment, technical management

GreenGas Plant in Rathenow/ Brandenburg

520 Nm³/h Biomethane Production

With the Bio Natural Gas production of one year, you can supply

• electricity to 5,700 3-person households,

• heat and warm water to 2,000 3-person households

With the Bio Natural Gas production of one year, you can run

a CNG vehicle, consuming 6kg/100 km

• 60 mio. km or 1,500 times around the globe or

• 3,000 CNG vehicle, each able to run up to 20,000 km per year

Tendering for gas refinement procedures for CO2 sequestration,

incorporating latest laws, regulations and DVGW standards.

State of the art procedure in:

- pressure water scrubbing

- selexol gas scrubbing

- gas scrubbing with amine solution

- pressure swing adsorption

Client recommendation based on calculation of optimal refining

technology according to site-specific, technological and economic

evaluation criteria

Approval planning for gas refining plants

Establishing on site contact and leading dialogue to gas grid operators

based on statutory provisions, e.g. Gas Grid Access Regulations,

adjustment and clarification of operator interface between processing plant

and connection to the grid.

Planning support for grid connection in cooperation with the local

net operator

(4)

O u r F e r m e n t a t i o n P h i l o s o p h y

The fermentation tank, as the heart of any biogas plant, is engineered

according to industrial standards and has significant advantages compared to

conventional flat fermenters due to its elevated design (height > diameter):

• Very low occurence of sedimentation

• Lower floor space required due to high usable volume

• Lower dead volume fraction

• Optimized reactor space in terms of retention time, biomass retention

and volume load

• Long retention time achieved by single reactor

• Very low risk of short circuiting

• Advantageous surface-volume ratio (H > D), and subsequent low heat

radiation surface leads to reduced emissions/ heat loss from the liquid surface

• Low power input and low shear forces during stirring with only one central

agitator at low speed (18 rpm)

• Very low power consumption of the complete system

• Our independent quality standards mean that the client always receives the

best, most efficient and sensible solution for the enterprise

• Separation between planning and realization in the interest of the building

owner, providing a range of individually tailored solutions

• Industrial standard, high and enduring efficiency of all plants

• more than 10 years of experience gives you security for a technological

and economically optimized solution

• cooperation with several renowned institutes in the field of safety and

lightning protection engineering, guarantee high safety standards

The four phases of the biogas process

Delivery of Solid Biomass Weighing and Dosage

Sulfur Removal Dehumidification Gas Refinement Gas Distribution System Gas Filling Station

CHP (Combined Heat and Power Unit)

Delivery of Liquid Biomass Main Fermenter Fermentation Residue Repository

Process Water

Filling

Admixture of Dry Substrate

Emergency Flare Decentralised

Energy Supply Location-Based Energy Supply Electrical Energy Recuperator Natural Gas Quality Heat Energy Heat Energy

CHP (Combined Heat and Power Unit) Heat Reservoir Gas Warming

Electrical Energy Post Digester with Double Membrane Gas Storage

Y o u r A d v a n t a g e s

S c h e m a t i c D i a g r a m o f B i o g a s P r o d u c t i o n f r o m B i o m a s s

(1 and 2)

Weighing and verification management of biomass, optimal

preparation and dosage, pre-crushing and trash matter segregation

(3)

Creation of optimal living conditions for microorganisms (temp: 38°C,

pH-value, stirring, ideal mixed loop reactor to prevent swim and sink layers)

(1)

(3)

(2)

A team of dedic ated and experienced

engineers is at your side .

Hydrolyse Phase Acidification Phase

Hydrolytic

Bacteria Fermentative Bacteria

Basic Raw Material (Carbohy drates, Fats, Proteins) Low Fat Acids (Propionic Acid, Butyric Acid) Other Products (Lactic Acid, Alcohols etc.) Basic Organic Components (Amino Acids, Fatty Acids, Sugars)

(5)

• Application of all safety-related regulations and recommendations in the

execution of our projects, e.g.

- European Machinery Directive

- Ordinance on Industrial Safety and Health

- Pressure Equipment Directive (97/23/EC)

- ATEX 94/9/EC Explosion protection directive

- Labour Protection Act and Guidance on Employers‘ Liability Insurance

Association

- Gas industry technical rules and standards (et al. DVGW, TRG and VDE)

Delivery of Solid Biomass Weighing and Dosage

Sulfur Removal Dehumidification Gas Refinement Gas Distribution System Gas Filling Station

CHP (Combined Heat and Power Unit)

Delivery of Liquid Biomass Main Fermenter Fermentation Residue Repository

Process Water

Filling

Admixture of Dry Substrate

Emergency Flare Decentralised

Energy Supply Location-Based Energy Supply Electrical Energy Recuperator Natural Gas Quality Heat Energy Heat Energy

CHP (Combined Heat and Power Unit) Heat Reservoir Gas Warming

Electrical Energy Post Digester with Double Membrane Gas Storage

S c h e m a t i c D i a g r a m o f B i o g a s P r o d u c t i o n f r o m B i o m a s s

(3)

Creation of optimal living conditions for microorganisms (temp: 38°C,

pH-value, stirring, ideal mixed loop reactor to prevent swim and sink layers)

(4)

Biogas preconditioning, securing of quality for engine and gas

grid requirements

(5)

Spread of high-quality fermentation residue in an efficient

manner, in accordance with professional standards

(6)

Advanced refinement up to natural gas quality according to

DVGW G 260 and G262, usage of gas distribution system, utilization within

one gas financial year according to Gas Grid Access Regulations and the

Rene-wable Energies Act

(7)

Efficient biogas utilization in combined heat and power unit with heat use

concept based on the renewable energies act (EEG)

(4)

(6)

(5)

(7)

Biogas Plant Homburg/Efze 340 Nm3/h Biomethane Production

Start-up phase of a biogas plant (tank filling, start-up of EI&C Technology and CHP unit, setup of working pressure in main and secondary fermenter, initiation of biogas production)

Our expertise gives you security

for your project

Acetogene Phase Methanogene Phase Hydrolyse Phase Acidification Phase

Methano-genic Bacterium Acetic Acid Bacteria Acetic Acid

(6)

Biogas Plant Friedrichshagen - Mecklenburg-Western Pomerania Location: 17379 Wilhelmsburg/ Friedrichshagen

Plant size: 2.7 MW electric

Input: Liquid manure and renewable raw materials

Field: Blueprint planning, approval planning according to BImSchG, implementation planning

Biogas Plant Claußnitz - Saxony Location: 09236 Claußnitz Plant size: 626 kW electric

Input: Liquid manure and renewable raw materials

Field: Approval according to BImSchG, blueprint, preliminary and implementation planning, execution and supervision of construction work, start-up, acceptances, detailed planning of gas desulfurization, support and optimization during operating stage, planning of plant extension; first carbon-free school in Saxony

Biogas Plant Lüchow - Lower Saxony Location: 29439 Lüchow Plant size: 3.6 MW electric

Input: Liquid manure and renewable raw materials

Field: Expert‘s report, nominal/actual value status acquisition, fermenter stage expansion by preliminary anaerobic stage, building application, detailed planning for hygienisation

Biogas Plant Alteno - Brandenburg Location: 15926 Duben Plant size: 1.252 MW electric

Input: Biowastes and biogenous residues, w/o liquid manure

Field: Approval according to BImSchG, blueprint, preliminary and implementation planning, execution and supervision of construction work, start-up, acceptances Biogas Plant Neubukow - Mecklenburg-Western Pomerania

Location: 18233 Neubukow Plant size: 938 kW electric

Input: Liquid manure and co-enzymes, biowastes

Field: Blueprint, preliminary and implementation planning, execution and supervision of construction work, start-up, acceptances, planning and conversion according to the new Waste Management Law Biogas Plant Vietlübbe - Mecklenburg-Western Pomerania

Location: 19386 Vietlübbe

Plant size: 220 kW electric, 194°F/ 1h hygienisation Input: Liquid manure and co-enzymes, biowastes Field: Planning, acceptance and construction, start-up UASB Sewage Treatment Plant MSP - Tangermünde - Saxony-Anhalt Location: 39590 Tangermünde

Plant size: UASB Sewage Treatment Plant with sequencing batch and methane reactors for biogas production

Input: Industrial effluent and sanitary water

Field: Aproval according to BImSchG, blueprint, preliminary and implementation planning, execution and supervision of construction work, start-up, acceptances, extension of fermentation stage, plant monitoring, comparison of feasible extensions, study on energetic use

BioPowerPlant Land Wursten - Lower Saxony Location: 27570 Nordholz

Plant size: 1.8 MW electric, 4.7 km biogas pipe line Input: Liquid manure and renewable raw materials

S e l e c t e d R e f e r e n c e s

Client: Biokraft Nordholz GmbH & Co. KG

Field: Blueprint and approval planning according to BImSchG, tendering for the plant, site and project management, start-up check, service contract over plant operation period

Biomethane Plant Schweringen - Lower Saxony Location: 27333 Schweringen

Plant size: 1.0 MW electric, steam production Input: Liquid manure and renewable raw materials Building owner: Raiffeisen Warengenossenschaft Grafschaft Hoya eG

Field: Blueprint and approval planning according to BImSchG, tendering, general planning, execution and supervision of construction work, supervision during operating period, general planning for AGRAVIS Raiffeisen AG Münster Biogas research centre (BRC) Tineo – Spain

Location: ES – 33877 Tineo Plant size: 248 kW electric

Field: General planning, blueprint planning, preliminary planning, implementation planning, site management and realisation of the plant

GreenGas Plant Rathenow - Brandenburg Location: 14704 Rathenow

Plant size: 1100 Nm³/h crude gas production, 520 Nm³/h GreenGas/ BioMethane Input: Liquid manure and renewable raw materials

Client: GreenGas Produktionsanlage Rathenow GmbH & Co. KG Partner: EMB GmbH Potsdam and GASAG Berliner Gaswerke AG

Field: Economic-technical feasibility study, biomass hedging, financal consulting, blueprint and approval planning, general planning of the plant, supervision of construction work

GreenGas Plant Stadtwerke Aachen AG , STAWAG Aachen - North Rhine-Westphalia Location: Area of Aachen a.o. Kerpen

Plant size: 1000 - 2000 Nm³/h crude gas production, biogas conditioning into natural gas quality Input: Renewable raw materials, biomass

Client: Stadtwerke Aachen AG, STAWAG

Field: Economic-technical feasibility study for biomethane plants in the area of Aachen, blueprint and preliminary planning, production site analysis Biogas Plant Zehna - Mecklenburg-Western Pomerania

Location: 18276 Zehna Plant size: 537 kW electric

Input: Liquid manure and renewable raw materials Client: CONINVEST GmbH Schönefeld

Field: In corporation with RHB GmbH Berlin, approval planning according to 4.BImschG, implementation planning, tendering and placing,

construction management, general planning, support during operation period, start-up and plant optimizing

Bio methane in Hesse

Location: D – 61200 Wölfersheim

Plant size: 1000 Nm3/h raw biogas, 500 Nm3/h biomethane Building owner: OVAG Energie AG

Field: economic and technical feasibility study, raw material organization, general planning, blueprint planning, approval planning according to the Federal Immission Control Act (BImSchG), construction supervision

Biogas Plant Heinersdorf - Brandenburg Location: 15518 Heinersdorf Plant size: 2.2 MW electric

Input: Liquid manure and renewable raw materials and animal excrement Client: MILSANA Handels & Produktionsgesellschaft mbH/Hese GmbH Field: Approval planning according to 4.BImschG

(7)

Biomethane Plant Infed into NG distribution system - Hagen a.T.W. Input: Liquid manure and renewable raw materials Plant size: 500 - 1000 Nm³/h crude gas production

Client: TEN Teutoburger Energie Netzwerk eG, Hagen a.T.W.

Field: Preliminary planning, technology concept, basic evaluation, biomass analysis, profitability checks through the exploration of alternatives,

project management biogas conditioning

Biomethane Production and Phyto Decontamination - Clausthal Zellerfeld Input: Liquid manure and renewable raw materials

Client: Clausthaler Umwelttechnik-Institut GmbH, Univ.-Prof. Dr. Ing. Otto Carlowitz

Field: Preliminary planning, technology concept, basic evaluation, biomass analysis, profitability checks through the exploration of alternatives, biogas refinement

Speicherstadt Potsdam

Client: SSP Speicherstadt Betreibergesellschaft mbH Location: 14469 Potsdam

Field: Economic-technical feasibility study of a GreenGas production, plant with decentralized power generation and application in fuel cells

Biomethane Production, Refinement and Infed - Lower Saxony Location: 31535 Schneeren

Input: Liquid manure and renewable raw materials Plant size: 500 Nm³/h crude gas production

Client: Gaz de France Produktion Exploration Deutschland GmbH Lingen, Gelsenwasser AG, AGRAVIS AG

Field: Preliminary planning, technology concept, basic evaluation, blueprint planning, biomass analysis, profitability checks through the exploration of alternatives in corporation with regional farmers and AGRAVIS Raiffeisen AG Münster

Biomethane Production, Refinement and Infed - North Rhine-Westphalia Location: 32657 Lemgo

Input: Renewable raw materials

Plant size: 250/500/1000 Nm³/h crude gas production Client: Stadtwerke Lemgo GmbH

Field: Feasibilty study incl. technology concept, basic evaluation, biomass analyses, profitability checks through the exploration of alternatives, refinement and gas infed

Biomethane Plants in Brandenburg - Havel and vicinity Location: 14772 Brandenburg an der Havel

Plant size: 500 Nm³/h - 1500 Nm³/h crude gas production Client: Stadtwerke Brandenburg an der Havel GmbH

Field: Feasibilty studies on biomass, technical concept and economic evaluation, engine application a./o. gas refinement and gas infed

Biomethane Plant with local heat concept - Brandenburg Location: Liquid manure and renewable raw materials Plant size: 500 Nm³/h crude gas production

Client: Stadtwerke Brandenburg an der Havel GmbH

Field: Biomass hedging with preliminary contracts, technical concept and economic evaluation, engine application

Biogas plant Agro-on PhaYao – Thailand Location: Th – 56000 PhaYao Plant size: 1,5MW electrical

Field: general planning, blueprint planning, preliminary planning, implementation planning, site management and realisation of the plant

Biomethane Production, Refinement and Infed - Hesse Location: 34576 Homberg/Efze

Input: Liquid manure and renewable raw materials Plant size: 630 Nm³/h crude gas production Client: Städtische Werke AG Kassel

Field: Feasibilty study incl. technology concept, profitability checks through the exploration of alternatives, refinement and infed, blueprint planning,

renewable raw material contracts, approval planning, tendering for component assembly, general planning Biomethane Production, Refinement and Infed - Lower Saxony Location: 30952 Ronnenberg

Input: Renewable raw materials

Plant size: 400/600/900 Nm³/h crude gas production Client: Stadtwerke Hannover AG, enercity

Field: Profitability checks through the exploration of alternatives, consulting services, tender for engineering and commercial comparison of gas preparation processes, licensing procedures

Bio Natural Gas, Micro Gas Distribution System - Lower Saxony Location: 29525 Uelzen

Plant size: 500/1000/1500 Nm³/h crude gas production Client: Stadtwerke Uelzen GmbH, mycity

Field: Survey, profitability checks through the exploration of alternatives, regional concept, integration of existing biogas plants and centralized gas refinement Bio Natural Gas - Thuringia

Input: Renewable raw materials

Plant size: 1000/1500/2000 Nm³/h crude gas production Client: Verbundnetz Gas AG

Field: Profitability checks through the exploration of alternatives, investment analysis, technology comparison of wet- and dry fermentation, CHP technology, fuel cells an gas refinement with infed, service phases 1-3 HOAI Bio Natural Gas - Baden-Württemberg

Location: Schwäbisch Hall Input: Renewable raw materials Plant size: 5 MW natural gas power Client: Stadtwerke Schwäbisch Hall GmbH

Field: Economic analyisis and development of technical data, investment and operating costs

Bio Natural Gas - Hesse Location: Wetterau

Input: Renewable raw materials Plant size: 5 MW natural gas power Client: OVAG Friedberg

Field: Comparison of biogas refinement processes with sensitivity analysis, technical and economic evaluation, preliminary planning

Bio Natural Gas and Geothermics - Saxony-Anhalt Location: Stadt Arendsee/Altmark

Field: Biomass potential analysis, development of materials flow management, technical feasibility and economic evaluation, preliminary planning for

combined cycle power plant Bio methane plant Botswana - Africa Location: BW-21250 Gaborone, Botswana

Plant size: 700Nm³/h bio methane (local bottling plant and fuel station)

Field: alpha-engineering, basic- and detail-engineering, staff training, commissioning, knowledge transfer, process engineering: basic and detail

(8)

BERLIN

Köpenick Neukölln Marzahn Hellerdorf Friedrichshain Kreuzberg

ERKNER

Berliner Ring

Flughafen Schönefeld A12

E30 A10 A10 96a 96 1/5

AGRAVIS Raiffeisen AG 48155 Münster

BALANCE VNG Bioenergie GmbH 04347 Leipzig

BBK e.V. 15537 Erkner

BBpro Förderverein Biokraftstoffe Brandenburg e.V. 14712 Rathenow

BDK Biodiesel Kyritz GmbH 16866 Kyritz

BIO-FUELS KONTOR SA (Pty) Ltd. Johannesburg, Südafrika

BioKraft Nordholz GmbH & Co. KG 27570 Bremerhaven

BioWend GmbH & Co. KG 29439 Lüchow

bpg biofuel projectmanagement gmbh 15537 Erkner

CONINVEST GmbH 12529 Schönefeld

CUTEC Clausthaler Umwelttechnik-Institut GmbH 38678 Clausthal-Zellerfeld

Dalkia Energie Service GmbH 20537 Hamburg

e.disnatur Erneuerbare Energien GmbH 14467 Potsdam

EEG - Erdgas Erdöl GmbH 10117 Berlin

EMB Erdgas Mark Brandenburg GmbH 14482 Potsdam

Energiequelle GmbH 15806 Zossen

Envia AQUA GmbH 09113 Chemnitz

Erdgas Zürich AG 8010 Zürich

EWE AG 26122 Oldenburg

FEE e.V. · Fördergesellschaft Erneuerbare Energien e.V. 12555 Berlin

GASAG Berliner Gaswerke AG 10117 Berlin

Gaz de France Produktion Exploration Deutschland GmbH 49808 Lingen (Ems)

GELSENWASSER AG 45891 Gelsenkirchen

Globos energy AG 14482 Potsdam

Greengas Produktionsanlage Rathenow GmbH & Co.KG 14712 Rathenow

HARPEN EKT GmbH 13627 Berlin

Hessen Energie GmbH 65189 Wiesbaden

InWEnt - Internationale Weiterbildung und Entwicklung gGmbH 53113 Bonn

Kartoffelverwertungsgesellschaft Cordes & Stoltenburg GmbH & Co. KG 24837 Schleswig

KFS Biodiesel GmbH & Co. KG 49661 Cloppenburg

Kraftfuttermittelwerk · Mittelweser Heide GmbH 27333 Schweringen METACON Projektentwicklungsgesellschaft mbH 10787 Berlin

Milk -Snack Produktions GmbH 39590 Tangermünde

Multi-Agrar-Claußnitz GmbH 09236 Claußnitz

OVAG Oberhessische Versorgungsbetriebe AG 61169 Friedberg

Philco Technologie GmbH 46325 Borken

Raiffeisen-Warengenossenschaft Grafschaft Hoya e.G. 27333 Schweringen

SABIO Project South Africa

Sharp Electronics (Europe) GmbH 20097 Hamburg

Sobatec GmbH 01917 Kamenz

Speicherstadt Potsdam GmbH 14469 Potsdam

Städische Betriebswerke Luckenwalde GmbH 14943 Luckenwalde

Stadt Arendsee 39616 Arendsee

Städtische Werke AG Kassel 34117 Kassel

Stadtwerke Clausthal-Zellerfeld GmbH 38678 Clausthal-Zellerfeld

Stadtwerke Cuxhaven GmbH 27472 Cuxhaven

Stadtwerke Hannover AG enercity positive energie 30057 Hannover

Stadtwerke Lemgo GmbH 32657 Lemgo

Stadtwerke Schwäbisch Hall GmbH 74523 Schwäbisch Hall

Stadtwerke Uelzen GmbH mycity 29525 Uelzen

STAWAG Stadtwerke Aachen 52070 Aachen

StWB Städtische Werke Brandenburg an der Havel GmbH 14772 Brandenburg TEN Teutoburger Energie Netzwerk e.G. 49170 Hagen VNG - Verbundnetz Gas Aktiengesellschaft 04332 Leipzig Wetterauer Agrar Service GmbH 61200 Wölfersheim

Zweckverband Grevesmühlen 23936 Grevesmühlen

ALENSYS

Engineering GmbH

Zum Wasserwerk 12

D - 15537 Erkner / Germany

Tel.: +49 (0) 3362/8859 141

Fax.: +49 (0) 3362/8859 150

[email protected]

ALENSYS · Alternative

Energiesysteme AG

Zum Wasserwerk 12

D - 15537 Erkner / Germany

Tel.: +49 (0) 3362/8859 120

Fax.: +49 (0) 3362/8859 130

[email protected]

References

Related documents

Keterampilan gerak fundamental seperti lari, lompat, tangkap dan lempar, membentuk balok penyangga yang menopang pembelajaran pendidikan jasmani yang lebih rumit dan

Course Title Course # Term Grade(s) Prerequisite(s) Major Topics. Peer Leadership 45.0590001 (Fall) 45.0590002 (Spring) S 12 Approval from

Sudionici koji su postigli viši rezultat na dimenziji adaptivnog perfekcionizma se statistički značajno razlikuju u percepciji motivacijske klime usmjerene na

(the Bb chord doesn’t sound good, because you are only getting one note of the triad. I often wind up just picking the middle string, or playing “air dulcimer” for this chord!).. If

[r]

The whole decks do not have to be in a full order, we’re only going to use half of the cards to keep the effect snappy, so just the top half of the prediction deck and the bottom

Try Scribd FREE for 30 days to access over 125 million titles without ads or interruptions. Start Free Trial

annual medical costs attributable to obesity, or more than $45 billion per year.. „ But is this a reasonable justification