end-to-end delay analysis
END TO END DELAY WITH MARKOVIAN QUEUING BASED OPTIMUM ROUTE ALLOCATION FOR MANETs
6
Comprehensive Cross Layer Analysis Framework for Delay Distribution in WSN
10
Improving End to End Delay Distribution in Wireless Sensor Networks
8
Performance Analysis of ZigBee Protocol in the Large Scale Network Topologies
5
A Review on Energy Comparison for AODV, ZRP and AODVDR Routing Protocols
5
PERFORMANCE ANALYSIS OF AODV ROUTING PROTOCOL IN MANETS
6
A Survey and Analysis on Scheduling Algorithms in IEEE 802 16e (WiMAX) Standard
10
An Optimal Traffic Distribution Method Supporting End-to-End Delay Bound
11
End to End Delay based Comparison of Routing Protocols in Wireless Networks
6
PERFORMANCE EVALUATION OF WIMAX NETWORKS FOR VOICE OVER IP
7
Analysis of end-to-end delay characteristics for various packets in IEC 61850 substation communications system
5
Support for End-to-End Response-Time and Delay Analysis in the Industrial Tool Suite: Issues, Experiences and a Case Study
30
End to End Delay Performance and Comparative analysis of Various TCP Variants in Mobile Ad hoc Networks (MANETs)
5
AN IMPROVED RECEIVER – CENTRIC MAC PROTOCOL FOR EFFECTIVE POWER MANAGEMENT IN WIRELESS SENSOR NETWORKS
5
Performance Analysis of Backoff Exponent Behaviour at MAC Layer In ZigBee Sensor Networks
7
Buffer aided relaying improves both throughput and end to end delay
17
End to End Delay Performance Analysis of Video Conferencing over LTE
5
End to end delay bound analysis for location based routing in hybrid vehicular networks
17
PERFORMANCE EVALUATION OF AODV IN DIFFERENT ENVIRONMENTS
6
End-to-end Behavior of Delay Tolerant Networks with Message Ferries
90