• No results found

road section

Performance of concrete block pavement on sloped road section

Performance of concrete block pavement on sloped road section

... The constructions of concrete block pavement on sloping road section, that must be contain the paving and prevent horizontal creep and subsequent opening of joints. The normally vertical traffic loading ...

10

INVESTIGATION OF TRAFFIC ACCIDENT PRONE AREAS RELATED TO EXISTING ROAD CONDITION AND DRIVER’S BEHAVIOR ALONG MENAGESHA- AMBO ROAD SECTION

INVESTIGATION OF TRAFFIC ACCIDENT PRONE AREAS RELATED TO EXISTING ROAD CONDITION AND DRIVER’S BEHAVIOR ALONG MENAGESHA- AMBO ROAD SECTION

... Traffic accidents worldwide is increasing due to a pragmatic vehicle ownership, acquisition, which necessitates daily activities. The primary objective of this research work was to identify the most hazardous location ...

18

Classification and provenance studies of the sandstones exposed along Durtlang road section, Aizawl, Mizoram

Classification and provenance studies of the sandstones exposed along Durtlang road section, Aizawl, Mizoram

... Durtlang road section specifically exposes the Middle Bhuban Forma- tion predominated by argillaceous rocks interca- lated with a lesser but sometimes massive and ...

10

Game Approach for Handover Scheme Based on Road-section in VANET

Game Approach for Handover Scheme Based on Road-section in VANET

... The payoff of the two vehicles gaming each other is reported in Fig. 7(a), which shows the two vehicles using our game method get almost the same payoff. When the vehicle begins to leave RSU1, the payoff of the vehicle ...

8

INVESTIGATION OF TRAFFIC ACCIDENT PRONE AREAS RELATED TO EXISTING ROAD CONDITION AND DRIVER’S BEHAVIOR ALONG MENAGESHA- AMBO ROAD SECTION

INVESTIGATION OF TRAFFIC ACCIDENT PRONE AREAS RELATED TO EXISTING ROAD CONDITION AND DRIVER’S BEHAVIOR ALONG MENAGESHA- AMBO ROAD SECTION

... Ababa road, a total length of study road section of ...the road stretch were found to be accident prone ...study road section, it is recommended that provision of speed limit ...

13

Design of Road Section for Automatic Severity Estimation of Automotive Accidents

Design of Road Section for Automatic Severity Estimation of Automotive Accidents

... The CDS is placed during a remote space, that is received the warning message from all alternative vehicle and conjointly from Road Side Unit (RSU). once its receive a waning messages from other vehicles and RSU, ...

5

Temporal variability of damage potential on roads as a conceptual contribution towards a short-term avalanche risk simulation

Temporal variability of damage potential on roads as a conceptual contribution towards a short-term avalanche risk simulation

... whole road section (see ...the road traffic authorities (Autonome Provinz Bozen-S¨udtirol/ASTAT 2002, ...the road (g), the average speed of cars (v) and the average number of passengers per ...

8

Dynamic risk simulation to assess natural hazards risk along roads

Dynamic risk simulation to assess natural hazards risk along roads

... Parameters used in the simulator can be evaluated by three different ways (Tables 4 and 5). The first and the best way to collect data is in the field with a pocket radar (which can measure vehicle speed very easily) and ...

15

Jaspers annual report 2009

Jaspers annual report 2009

... Hanyi-Tiszasüly South Buda Bekescsaba Nyireghaza Construction of second track Skiveri - Krustpils Riga - Krustpils section E22 road section Ludza - Terehova E22 road section Riga Tinuzi [r] ...

44

Multi path transportation assignment model in urban transportation based on real road network survey

Multi path transportation assignment model in urban transportation based on real road network survey

... a section of road as basic analysis unit, but multi-path transportation assignment model based on real road-network take path (a series of road section from origin to destination) as ...

6

USE OF DEMOLISHED CONSTRUCTION AGGREGATES FOR CONSTRUCTION OF BASE COURSE FOR ROAD CONSTRUCTION

USE OF DEMOLISHED CONSTRUCTION AGGREGATES FOR CONSTRUCTION OF BASE COURSE FOR ROAD CONSTRUCTION

... The managing and use of demolished aggregate in new construction had led the environment friendly that led the use of waste to utilize it in different fields including construction fields. The main aim is to do the ...

8

Pothole Dimensions Measurement Using Mean Shift Based Speckle Filtering

Pothole Dimensions Measurement Using Mean Shift Based Speckle Filtering

... in road surfaces are mostly caused by water and regular road maintenance is vital to prevent the decaying ...a road with potholes is shown in ...the road are example factors that lead to ...

9

Determining the Correlation Between Daytime and Night-Time Road Markings Visibility

Determining the Correlation Between Daytime and Night-Time Road Markings Visibility

... Abstract. Road markings quality control implies conducting several different tests, of which the most significant are visibility tests comprising daytime and night-time visibility measurements by applying the ...

8

Futures Trading In Rubber- Are The Stakeholders In Kerala Benefitted?

Futures Trading In Rubber- Are The Stakeholders In Kerala Benefitted?

... of road function was achieved by arterial roads as this kind of roads functioned as the main road for long- distance and high average-speed ...Furthermore, road Class 1 reached the highest score in ...

5

Download
			
			
				Download PDF

Download Download PDF

... study section of the ...the road section, after which some engineering properties - natural moisture content, in-situ dry density, optimum moisture content, maximum dry density, and relative density, ...

6

Estimating network related risks: A methodology and an application in the transport sector

Estimating network related risks: A methodology and an application in the transport sector

... Figure 1. Schematic overview of the modules used for the application. Modules, represented by nodes with certain inputs and outputs, are related to the events that need to be modeled to estimate risk. The assessment ...

21

The Making of California’s Art Recovery Statute: The Long Road to Section 338(c)(3)

The Making of California’s Art Recovery Statute: The Long Road to Section 338(c)(3)

... concluded in May 2011, but oral argument was not scheduled until November 2013. During that time, two developments occurred that impacted the issues on appeal in Deirmenjian. First, the Ninth Circuit issued its en banc ...

44

Filling in the Clearance of a Forest Road Cross-Section in Beech Forest (p.53-62)

Filling in the Clearance of a Forest Road Cross-Section in Beech Forest (p.53-62)

... forest road cross-section affects both the forest and the ...forest road cross-section in beech stands of south-east ...forest road, 0.74 m in a 35-year old road, and ...est ...

10

Minimising road infrastructure maintenance costs by managing the traffic

Minimising road infrastructure maintenance costs by managing the traffic

... The deterioration of the pavement caused by cars turns out to be insignificant in comparison to the deterioration caused by lorries. Therefore we made a model that only depends on the number of lorries. To get executable ...

97

Analysis of Three different types of Culverts for same Loading Conditions as per I R C  Loadings using Analysis Tool SAP2000

Analysis of Three different types of Culverts for same Loading Conditions as per I R C Loadings using Analysis Tool SAP2000

... Culverts throughout the country are approaching or are past their original design lives. These `baby boomer' culverts will need to be repaired, rehabilitated, or replaced. Because entire culvert replacement is so ...

5

Show all 10000 documents...

Related subjects