• No results found

system times-to-failure

Bayesian Analysis of Competing Risks Models with Masked Causes of Failure and Incomplete Failure Times

Bayesian Analysis of Competing Risks Models with Masked Causes of Failure and Incomplete Failure Times

... series system, the components of which possess independent log-normal life ...the failure times for the competing risks have a Weibull ...of failure might be masked, and compared their result ...

11

Cost Benefit Analysis of a System with Server Failure and Replacement of the Unit at Different Failure Modes Subject to Inspection

Cost Benefit Analysis of a System with Server Failure and Replacement of the Unit at Different Failure Modes Subject to Inspection

... single-unit system which may fail completely either directly from normal mode or via partial ...complete failure to examine the feasibility of ...The system remains operative with partially failed ...

7

Profit Analysis of a Computer System With Priority to Software Replacement over Hardware Repair Subject to Maximum Operation and Repair Times

Profit Analysis of a Computer System With Priority to Software Replacement over Hardware Repair Subject to Maximum Operation and Repair Times

... computer system in which h/w and s/w components fails independently direct from normal ...computer system as a single- ...the system for conducting PM, repair and replacement of the ...h/w ...

17

Using simulation for a new production line at Philips Drachten

Using simulation for a new production line at Philips Drachten

... For the remaining cells 40 weeks of available data from the factory information system is studied. Similar cells show MTTF values between 1000 and 1500 seconds and MTTR values between 80 and 300 seconds. Based on ...

76

Ferocious Times: The IRA, the RIC, and Britain’s failure in 1919 1921

Ferocious Times: The IRA, the RIC, and Britain’s failure in 1919 1921

... 16 I found the real situation so much more serious that I imagine there must be very few officers, even at the War Office, who really know what the state of affairs is. The British Army in Ireland is besieged. … the ...

20

Analysis of a Repairable System Operating Under Different Weather Conditions

Analysis of a Repairable System Operating Under Different Weather Conditions

... the system. It is assumed that the distribution of failure time and time to change in weather conditions and repair time are general ...The system is observed at suitable regenerative epochs by using ...

5

Fuzzy Reliability Evaluation of a Repairable System with Imperfect Coverage, Reboot and Common-cause Shock Failure

Fuzzy Reliability Evaluation of a Repairable System with Imperfect Coverage, Reboot and Common-cause Shock Failure

... repairable system consisting of two independent operating units, by incorporating the coverage ...a failure is known as the coverage ...shock failure are also considered. The times to ...

8

Reliability Measures of a Two Unit Cold Standby Repairable System with Priority to Operation over Preventive Maintenance

Reliability Measures of a Two Unit Cold Standby Repairable System with Priority to Operation over Preventive Maintenance

... Transition probabilities Mean sojourn times Mean time to system failure Steady State Availability Busy period of the server due to repair Busy period of the server due to preventive main[r] ...

5

Profit Analysis of a Computer System with H/W Repair and S/W Replacement

Profit Analysis of a Computer System with H/W Repair and S/W Replacement

... computer system of two identical units in which each unit has independent complete failure of h/w and s/w components from normal ...The failure time of the unit due to failure of h/w and s/w ...

8

A New Extension of the Lomax Distribution with Properties and Applications to Failure Times Data

A New Extension of the Lomax Distribution with Properties and Applications to Failure Times Data

... , are availble if needed, Setting the nonlinear system of equations 𝑈 𝜃 = 0, 𝑈 𝛼 = 0, 𝑈 𝛾 = 0 and 𝑈 𝛽 = 0 and solving them simultaneously yields the MLE Θ ̂ = (𝜃̂, 𝜆̂, 𝛽̂, ) ⊺ . To solve these equations, it is ...

19

A local quality initiative to improve follow-up times for patients with heart failure

A local quality initiative to improve follow-up times for patients with heart failure

... PDSA 1, an educational intervention, generally consid- ered to be ‘low impact’ on the hierarchy of effective- ness, (Institute for Safe Medication Practices 1999) was an essential step in enhancing stakeholder engagement ...

5

Investigation of failure modes of exhaust gas recirculation (EGR) system

Investigation of failure modes of exhaust gas recirculation (EGR) system

... Salunkhe et al. (Pravin S. Salunkhe and Dhummansure, S. R. Babar, 2015) studied the failure of EGR housing due to its loading conditions. The loading setup of EGR housing is shown in Figure 5. The material of ...

5

Cost-Analysis Of A Computer System With Hardware Repair Subject To Inspection And Arbitrary Distributions For Hardware and Software Replacement

Cost-Analysis Of A Computer System With Hardware Repair Subject To Inspection And Arbitrary Distributions For Hardware and Software Replacement

... The failure time of the unit due to failure of hardware and software components is distributed exponentially while the distributions of inspection, replacement and repair times are taken as ...

14

Attitude towards E-learning Technology -- A study in Kerala

Attitude towards E-learning Technology -- A study in Kerala

... computer system with software redundancy in cold ...computer system in which hardware and software failures occur independently with some ...the system at hardware failure while software is ...

8

Vol 3, No 11 (2012)

Vol 3, No 11 (2012)

... standby system is analyzed in which operative unit suffers a random shock with some ...the system immediately to conduct maintenance and repair of the ...and failure times of the unit follow ...

7

Development of a Reliable Prediction Method for Urgent Infra Failure Recovery Times at ProRail B V

Development of a Reliable Prediction Method for Urgent Infra Failure Recovery Times at ProRail B V

... the failure location, the weather in The Netherlands or the performance of Manchester United last weekend) can influence the FRT and its influence should therefore be ...of failure recovery are ...a ...

132

Effect analysis of reliability, availability, maintainability and safety (rams) of train operation

Effect analysis of reliability, availability, maintainability and safety (rams) of train operation

... DP system, Reliability Centered Maintenance (RCM) and its application as a main tool have been ...the system, based on MTBF and MTTR of different components of the system (Ali Ebrahimi ...

38

Physico-mechanical and Tribological Properties of Fe-Cu-Ni-Sn and Fe-Cu-Ni-Sn-VN Nanocomposites Obtained by Powder Metallurgy Methods

Physico-mechanical and Tribological Properties of Fe-Cu-Ni-Sn and Fe-Cu-Ni-Sn-VN Nanocomposites Obtained by Powder Metallurgy Methods

... Cu–Fe materials with a nanocrystalline structure is 2–7 times higher than that of coarse-grained analogs [3,4]. According to [4], the growth of microhardness in the Cu–Fe nanocomposite is due to the formation of ...

11

A22 6825 0 360 Instr Timing pdf

A22 6825 0 360 Instr Timing pdf

... SySTEM/360 INSTRUCTION TIMING INFORMATION These instruction time tables provide average instruction times, in microseconds, for all models of the IBM System/360.. All times for instructi[r] ...

11

BUSINESS PROCESS REENGINEERING TO IMPROVE PROCESS ALIGNMENT & INFORMATION SYSTEM 
PLATFORM AT STAINLESS EQUIPMENT COMPANY

BUSINESS PROCESS REENGINEERING TO IMPROVE PROCESS ALIGNMENT & INFORMATION SYSTEM PLATFORM AT STAINLESS EQUIPMENT COMPANY

... FMECA was originally developed by the National Aeronautics and Space Administration (NASA), which aims to improve and verify the reliability Hardware space program MIL-STD- 785, entitled the Reliability Program for ...

10

Show all 10000 documents...

Related subjects