• No results found

18 results with keyword: 'discrete particle optimization algorithms permutation flowshop scheduling problem'

The Discrete Particle Swarm Optimization Algorithms For Permutation Flowshop Scheduling Problem

We modified some algorithms based on Hybrid Discrete Particle Swarm Optimization (HDPSO) algorithm by Clerc [25] and modified particle swarm optimization (MPSO)

Protected

N/A

12
0
0
2021
Combinatorial particle swarm optimization for solving blocking flowshop scheduling problem

In [28 ,19] a discrete particle swarm optimization algorithm (DPSO) was proposed for solving permutation fl owshop scheduling problem and no-wait fl owshop scheduling

Protected

N/A

17
0
0
2021
Achieving Regulatory Success: Areas of focus for biotechnology companies. Michael J. Schlosser, PhD, DABT April 21, 2013

• Understanding regulatory guidances and their level of enforcement is critical for not being under or over compliant. • Incorporate available predictive tools

Protected

N/A

24
0
0
2021
Comparative Analysis of Metaheuristic Approaches for Makespan Minimization for No Wait Flow Shop Scheduling Problem

[7] developed a discrete particle swarm optimization (DPSO) algorithm is presented to solve the no-wait flowshop scheduling problem with both makespan and total flow

Protected

N/A

7
0
0
2022
Discrete Particle Swarm Optimization Algorithm for Flowshop Scheduling

An Application of Particle Swarm Optimization Algorithm to Permutation Flowshop Scheduling Problems to Minimize Makespan, Total Flowtime and Completion Time Variance, Proceedings

Protected

N/A

29
0
0
2021
A Systematic Review for Solving Flow Shop Scheduling Problem Using Differential Evolution Algorithm

S23 A discrete differential evolution algorithm for the permutation flowshop scheduling problem [25] S24 A novel differential evolution algorithm for no-idle permutation

Protected

N/A

11
0
0
2021
Heuristics for a permutation flowshop scheduling problem with weighted squared tardiness

This investigation considers these two factors and presents algorithms for a permutation flowshop scheduling problem with a weighted squared tardiness objective

Protected

N/A

48
0
0
2021
Cooperatives as organizational forms suitable for the sustainable development of tourism in rural areas

U Hrvatskoj postoje ruralna područja koja su već razvila prepoznatljivost svoje turističke ponude, poput Istre, no mnoga područja koja tek razvijaju turističke

Protected

N/A

10
0
0
2021
Proving Termination of Imperative Programs via Term Rewriting ⋆

by PA -based rewrite rules from P ∪ {l → rJCK}. Thus, assume some infinite chain contains.. 3) } by the termination processor of Theorem 22 since the rewrite rules (2) and (3) are

Protected

N/A

44
0
0
2021
The distributed assembly permutation flowshop scheduling problem

This paper proposes a Distributed Assembly Per- mutation Flowshop Scheduling Problem (DAPFSP) with two stages to model and study complex supply chains2. This problem is a

Protected

N/A

30
0
0
2021
Department of Education and Training

Approved bypass schools: Where the distance eligibility criteria to the nearest Queensland Government school with the appropriate school year level for the student is not met and

Protected

N/A

8
0
0
2021
Particle Swarm Optimization Algorithms for Two stage Hybrid Flowshop Scheduling Problem with No wait

For example, [4] formulated the problem as an integer programming model and adopted an ant colony optimization (ACO) algorithm to minimize the total completion time in a two-stage

Protected

N/A

15
0
0
2020
Colic and Crying Syndromes in Infants

Colic may be best viewed as a clinical manifestation of normal emotional development, in which an infant has diminished capacity to regulate crying duration..

Protected

N/A

7
0
0
2020
Overview of e-asean Initiative

regional Internet exchanges and gateways to make Internet traffic flow within ASEAN more efficient and cost-effective. •

Protected

N/A

31
0
0
2021
ONLINE ADMINISTRATION OF ASSESSMENTS

INCOMPLETE (red) = student has quit the assessment before completing it IN PROGRESS (orange) = student is in the process of taking the assessment COMPLETED (green) = student

Protected

N/A

11
0
0
2021
Sharp Becker Stark’s type inequalities with power exponential functions

Motivated by (.), in this paper, we give some inequalities with power exponential func- tions derived from the left hand side of Becker-Stark’s inequality (.)... Therefore,

Protected

N/A

11
0
0
2020
Download
			
			
				Download PDF

The project team have delivered training to disparate groups, brokered partnerships between local skills providers and people in need of support (Opportunity UK – Belsay

Protected

N/A

7
0
0
2020
LORIOT Network Server

A server architecture designed to grow with the network, from local deployments to national coverage, our network infrastructure and server distribution provides robust availability

Protected

N/A

14
0
0
2022

Upload more documents and download any material studies right away!