• No results found

18 results with keyword: 'mekong basin focal project synthesis report'

Mekong Basin Focal Project: Synthesis report

To investigate the link of water constraints to livelihoods especially of the poor at the household level, three sets of questionnaires and checklists of Focus Group

Protected

N/A

140
0
0
2021
Microsoft SQL Server 2012 Eğitimleri. Microsoft Windows Server 2012 Eğitimleri. Virtualization Eğitimleri. Forefront Eğitimleri

Oracle Database 11g: Managing Oracle on Linux for DBAs 2 Gün Oracle Database 11g: New Features & Change Management Overview 2 Gün Oracle Database 11g: New Features

Protected

N/A

12
0
0
2021
Sérgio Roberto Belisário

2/XX INFOVIAS– ServicesandClients TelecommunicationsatCEMIG– HistoryandEvolution INFOVIAS– StrategicPositioning INFOVIAS– MainNumbers INFOVIAS– Outlook Agenda... 3/25

Protected

N/A

25
0
0
2021
Comparative Study of Metabolic Gene Regulation with Seasonal Fluctuation of Temperature in Rainbow Trout (Onchorynchus mykiss) Under Captive Conditions

We have studied the effect of low temperature induced expression of genes and found that onset of Winter (Nov, Dec and Jan) the expression of these genes are very low in

Protected

N/A

8
0
0
2020
Basin Focal Project Volta

We have developed a simulation model of the inflows to Lake Volta that takes into account possible rainfall variations over the basin in the climate change context, and

Protected

N/A

81
0
0
2021
Basin Focal Project Niger

Agriculture relies predominantly on rainfall (95% is rainfed) and cropping zones have therefore adapted to rainfall and roughly follow isohyets. In the extreme north, land is

Protected

N/A

130
0
0
2021
Die verband tussen doop en lidmaatskap van die kerk

Daarom moet bulle ook deur die doop as teken van die verbond in die Christelike kerk ingeIyf en van die kinders van dIe ongelowiges onderskei word. DIE VERBANO TUSSEN OOOP EN

Protected

N/A

24
0
0
2020
Fish and Fisheries in the Sesan River Basin

Baran  E,  Seng  Sopheak  2010.  Fish  migrations  in  the  Sekong,  Sesan  and  Srepok  Rivers  (Mekong  River  Basin).  Report  for  the  project 

Protected

N/A

61
0
0
2021
The Virtual Laboratory for Satellite Training and Data Utilization

near real time data to the WMO Regional Meteorological Training Centers (RMTCs) in Barbados and Costa

Protected

N/A

26
0
0
2021
Effects of cooking time, temperature, and salt concentration on the phenolic content and antioxidant activity of selected edible mushrooms

To determine the effect of cooking time, temperature, and salt concentration on the antioxidant activity and total phenolic content of edible mushroom, four species were used in

Protected

N/A

5
0
0
2022
Chapter 6 Reports. Base Handbook

If you have chosen to have a group header and perhaps a group footer, these elements will appear as sections in the report navigator under the corresponding fieldname

Protected

N/A

24
0
0
2021
CIVIC EDUCATION IN THE MODERN WORLD

The Civic Education in the Modern World seminar continues the series of enlightenment events held within the framework of the mutual project of the Moscow School of Civic

Protected

N/A

18
0
0
2021
Taxes, leverage, and stimuli of investment under uncertainty

Similar to the benchmark case wherein the firm is restricted to be all-equity financed, we show that the commitment made by the government on the terms of the tax-subsidy program

Protected

N/A

22
0
0
2021
Data mining using rule extraction from Kohonen self-organising maps

9 Rules extracted from the SOM trained on the various data sets; a Iris data set, b Monks data set.. and c lung cancer

Protected

N/A

17
0
0
2021
Regionalism, Identity, and Hydropower Dams: The Chinese-Built Lower Sesan 2 Dam in Cambodia

Mekong Basin: Case Studies of Lower Sesan 2 and Kamchay Hydropower Projects, Cambodia , Final Report of the CGIAR Research Program on Water, Land and Ecosystems in the Greater

Protected

N/A

37
0
0
2021
Healthy Schools BC Evaluation Year 1 Summary Report. Methods

stakeholders, as indicated by their responses to how they apply CSH in their work. 3) The majority of school staff reported that they noticed changes towards a healthy

Protected

N/A

6
0
0
2021
CAPITALAND MALAYSIA MALL TRUST. 1Q 2021 Results Presentation 16 April 2021

▪ lower utilities expenses as a result of lower consumption and 10% discount on electricity consumption from 1 January 2021 until 31 March 2021; and.. ▪ lower marketing and

Protected

N/A

30
0
0
2021

Upload more documents and download any material studies right away!