• No results found

Appendix B ABBREVIATIONS

In document ENI - Completion Procedures Manual (Page 187-192)

AC/DC Alternate Current, Direct Current AHTS Anchor Handling Towing Supply API American Petroleum Institute BG Background gas

BHA Bottom Hole Assembly BHP Bottom Hole Pressure BHT Bottom Hole temperature BJ Blast Joint

BMT Blue Methylene Test BOP Blow Out Preventer BPD Barrel Per Day BPM Barrels Per Minute BPV Back Pressure Valve BSW Base Sediment and Water BUR Build Up Rate

BWOC By Weight Of Cement BWOW By Weight Of Water C/L Control Line

CBL Cement Bond Log

CCD Centre to Centre Distance CCL Casing Collar Locator CDP Common Depth Point CET Cement Evaluation Tool CGR Condensate Gas Ratio

CMT Cement

CP Conductor Pipe CR Cement Retainer

CRA Corrosion Resistant Alloy

CSG Casing

C/T Coiled Tubing CW Current Well DC Drill Collar

DE Diatomaceous Earth DHM Down Hole Motor

DHSV Down Hole Safety Valve DIF Drill in Fluid

DLP Dog Leg Potential DLS Dog Leg Severity

D&CM Drilling & Completion Manager DOB Diesel Oil Bentonite

DOBC Diesel Oil Bentonite Cement DOR Drop Off Rate

DP Drill Pipe

DPHOT Drill Pipe Hang off Tool DRLG Drilling

DST Drill Stem Test

DV DV Collar

E/L Electric Line

ECD Equivalent Circulation Density ECP External Casing Packer EMS Electronic Multi Shot EMW Equivalent Mud Weight EOC End Of Curvature EP External Pressure

ESD Electric Shut-Down System ESP Electrical Submersible Pump ETA Expected Arrival Time ETU Endless Tubing Unit

FBHP Flowing Bottom Hole Pressure FBHT Flowing Bottom Hole Temperature FC Flow Coupling

FINS Ferranti International Navigation System FPI/BO Free Point Indicator / Back Off

FTHP Flowing Tubing Head Pressure FTHT Flowing Tubing Head Temperature GCT Guidance Continuous Tool

GLR Gas Liquid Ratio

GLS Guidelineless Landing Structure GMS Gyro Multi Shot

GOC Gas Oil Contact GOR Gas Oil Ratio GP Gravel Pack

GPM Gallon (US) per Minute GPS Global Positioning System

GR Gamma Ray

GRA Guidelines Re-Entry Assembly GSS Gyro Single Shot

HAZOP Hazard and Operability HDT High Resolution Dipmeter HHP Hydraulic Horsepower HO Hole Opener

HP/HT High Pressure - High Temperature HSI Horsepower per Square Foot HW/HWDP Heavy Weight Drill Pipe

IADC International Drilling Contractor IBOP Inside Blow Out Preventer ICGP Inside Casing Gravel Packing ID Inside Diameter

IFR Imposta Fabbricazione Ridotta IP Internal Pressure

IPR Inflow Performance Relationship JAM Joint Make-up Torque Analyser

KMW Kill Mud Weight KOP Kick Off Point

L/D Lay Down

L/S Long String

LAT Lowest Astronomical Tide LC 50 Lethal Concentration 50% LCDT Last Crystal to Dissolve oC LCM Lost Circulation Materials LCP Lower Circulation Position (GP) LEL Lower Explosive Limit

LMRP Low Marine Riser Package LN Landing Nipple

LOT Leak Off Test LQC Log Quality Control LTA Lost Time Accident LTT Lower Tell Table (GP) LWD Log While Drilling M/D Martin Decker

M/U Make Up

MAASP Max Allowable Annular Surface Pressure MD Measured Depth

MLH Mudline Hanger MLS Mudline Suspension MMS Magnetic Multi Shot

MODU Mobile Offshore Drilling Unit MOP Margin of Overpull

MPI Magnetic Particle Inspection MSCL Modular Single Completion Land MSL Mean Sea Level

MSS Magnetic Single Shot MUT Make up Torque

MW Mud Weight

MWD Measurement While Drilling N/D Nipple Down

N/U Nipple Up

NACE National Association of Corrosion Engineers NB Near Bit Stabiliser

NDT Non Destructive Test NMDC Non Magnetic Drill Collar NSG North Seeking Gyro

NTU Nephelometric Turbidity Unit OBM Oil Base Mud

OD Outside Diameter OEDP Open End Drill Pipe

OH Open Hole

OHGP Open Hole Gravel Packing OIM Offshore Installation Manager

OMW Original Mud weight ORP Origin Reference Point OWC Oil Water Contact P&A Plugged & Abandoned

P/U Pick up

PBR Polished Bore Receptacle PCG Pipe Connection Gas

PDC Polycrystalline Diamond Cutter PDM Positive Displacement Motor PGB Permanent Guide Base PI Productivity Index

PKR Packer

PLT Production Logging Tool POB Personnel On Board POOH Pull Out Of Hole PPB Pounds per Barrel PPG Pounds per Gallon ppm Part Per Million PTR Piano Tavola Rotary PV Plastic Viscosity

PVT Pressure Volume Temperature

Q Flow Rate

Q/A Q/C Quality Assurance, Quality Control

R/D Rig down

R/U Rug up

RBP Retrievable Bridge Plug RCP Reverse Circulating Position RFT Repeat Formation Test RIH Run In Hole

RJ Ring Joint

RKB Rotary Kelly Bushing ROE Radius of Exposure ROP Rate Of Penetration ROU Radios Of Uncertainty ROV Remote Operated Vehicle RPM Revolutions Per Minute RPSP Reduced Pump Strokes RT Rotary Table

S (HDT) High Resolution Dipmeter S/N Serial Number

SBHP Static Bottom Hole Pressure SBHT Static Bottom Hole Temperature SCC Stress Corrosion Cracking SD Separation Distance SDE Senior Drilling Engineer SF Safety Factor

SICP Shut-in Casing Pressure SIDPP Shut-in Drill Pipe Pressure SIMOP Simultaneous Operations SPM Stroke per Minute

SR Separation Ratio SRG Surface Readout Gyro SSC Sulphide Stress Cracking ST Steering Tool

STG Short trip gas

TCP Tubing Conveyed Perforations TD Total Depth

TFA Total Flow Area

TG Trip Gas

TGB Temporary Guide Base TOC Top of Cement

TOL Top of Liner

TVD True Vertical Depth TW Target Well

UAR Uncertainty Area Ratio UGF Universal Guide Frame UR Under Reamer

VBR Variable Bore Rams (BOP) VDL Variable Density Log VSP Velocity Seismic Profile W/L Wire Line

WBM Water Base Mud

WC Water Cut

WL Water Loss WOB Weight On Bit WOC Wait On Cement WOW Wait On Weather WP Working Pressure YP Yield Point

In document ENI - Completion Procedures Manual (Page 187-192)