Appendix C – Assessment Record List of Interviews and respondents.

17/06/2010

Kings Place, London

INTERVIEW to discuss Network Rail asset management benchmarking activity

Andrew Newby (NR) Andrew Kirwan (NR)

23/06/2010

71 Fenchurch Street, London

INTERVIEW with ORR Reporter AMCL

Richard Edwards (AMCL)

28/06/2010

Great Minster House, London

INTERVIEW to discuss industry supply chain

Simon Lydiard (DfT) Simon Baskerville (DfT) 28/06/2010

Melton Street, London

INTERVIEW to discuss Network Rail reliability centred maintenance activity Deanne Haseltine (NR) Barny Daley (NR) Dan Boyde (NR) 30/06/2010 London

INTERVIEW to discuss Network Rail asset information activity

Brian Halliday (NR) Andrew Newby (NR) 06/07/2010

East Anglia House, London

INTERVIEW to discuss Network Rail: Enhancements – regional example.

Simon Maple (NR Programme Sponsor Waterloo capacity scheme).

09/07/2010

Kings Place, London

INTERVIEW to discuss Network Planning with Network Rail

Richard Eccles (NR)

09/07/2010

Kings Place, London

INTERVIEW to discuss Network Rail delivery

Simon Kirby (NR) Roger Dickinson (NR) 09/07/2010

Kings Place, London

INTERVIEW to discuss Network Development with Network Rail

Stephen Prendergast (NR)

12/07/2010

1 Kemble Street, London

INTERVIEW with ORR Head of Infrastructure and Asset Management

Jim Bostock (ORR)

12/07/2010

Great Minster House, London

INTERVIEW with DfT Director General National Networks

Mike Mitchell (DfT)

13/07/2010

Great Minster House, London

INTERVIEW with DfT to discuss Rolling Stock Age and Replacement Profile

Brian Freemantle (DfT)

13/07/2010

Melton Street, London

INTERVIEW with Network Rail to discuss maintenance / renewals trade-off

James Dean (NR) Andrew Newby (NR)

13/07/2010

1 Kemble Street, London

INTERVIEW with ORR Director Planning and Performance

Michael Lee (ORR)

14/07/2010

15 Canada Square, Canary Wharf, London, E14 5GL

WORKSHOP to review and

challenge findings and hypotheses.

Value for Money team and industry experts, drawn from members of the cross-industry Atkins’ team.

16/07/2010

Kings Place, London

INTERVIEW with Network Rail to discuss asset management improvement plans

Andrew Newby (NR) Jerry England (NR)

16/07/2010

40 Melton Street, London

INTERVIEW with Network Rail to discuss the Supply Chain

© C row n co pyr ight , 20 11 23/07/2010

Floor 28 - South Wing, Euston Tower, London

INTERVIEW on supply chain management

Neil Porter (Atkins)

23/07/2010

Great Minster House, London

INTERVIEW with DfT Director Franchises and Strategy

Bob Linnard (DfT)

26/07/2010

Bombardier's offices, Euston, London

INTERVIEW with Bombardier Neil Walker, Allan Morgan, Paul Roberts, Jon Seddon, Mike Burgess (Bombardier)

27/07/2010

Kings Place, London

INTERVIEW with Network Rail Andy Doherty (NR), deputising for Steve Yianni (NR)

27/07/2010

Macmillan House, London

INTERVIEW with FirstGroup Ian Grindlay, Dave Gausby, Hugh Clancy, Alan Cockerham (FirstGroup)

28/07/2010

Network Rail's offices, Milton Keynes

INTERVIEW with Network Rail to discuss NDS Procurement

Ken Blackley (NR)

29/07/2010

40 Melton Street, London

INTERVIEW with Network Rail Danny Mair, Brian Neve, and Neil Carruthers (NR)

30/07/2010

9 Millbank, London

INTERVIEW with ofgem Chris Watts, Paul Branston (ofgem)

30/07/2010

Portland House, London

INTERVIEW with Angel Trains Tim Dugher, Steve Lamey (Angel Trains)

30/07/2010

40 Melton Street, London

INTERVIEW with Network Rail Steve Featherstone (NR)

30/07/2010

40 Melton Street, London

INTERVIEW with Network Rail Andrew Newby, Jerry England (NR)

02/08/2010

40 Melton Street, London

INTERVIEW with Network Rail Mick Martin, Andrew Newby (NR)

04/08/2010 RSSB's offices

INTERVIEW with RSSB Len Porter, Anson Jack and Andrew Sharpe (RSSB)

05/08/2010

55 Victoria Street, London

INTERVIEW with Chiltern Railways Vic Michel

05/08/2010

55 Victoria Street, London

INTERVIEW with ORR

Enhancements Reporter Nichols

Peter Hansford & Rod Croucher

06/08/2010

Cathcart Business Park, Glasgow

INTERVIEW with Scottish Power Wholesale

Martin Sedgwick (ScottishPower Energy Wholesale)

06/08/2010

New Alderston House, Bellshill, Scotland

INTERVIEW with Scottish Power Networks

Jeff Hunt (ScottishPower Energy Networks)

9/08/2010

Railway Industry Association, 22 Headfort Place, London, SW1X 7RY, England

WORKSHOP to review and challenge potential areas for improvements and conclusions.

Value for Money team and industry experts, drawn from members of the cross-industry Atkins’ team.

© C row n co pyr ight , 20 11 10/08/2010

HA office, The Cube, Birmingham, B1 1RN

INTERVIEW with Highways Agency Mark Gripton (HA)

02/09/2010

Utrecht, The Neatherlands

INTERVIEW with NedTrain Theo Walbeek (NedTrain)

02/09/2010

Utrecht, The Neatherlands

INTERVIEW with NS Reizigers Irene Doosje (NS Reizigers)

06/09/2010 Videoconference

INTERVIEW with Trafikverket Vivianne Karlsson, Per Norrbin, Per Hurtig, Ulla Ericson, Dan Eriksson, Per-Olof Kraik- Larsson

10/12/2010

40 Melton Street, London

WORKSHOP to consider asset information management principles

Andrew Newby (NR), Patrick Bossert (NR), David Wilkes (NR), Jon Seddon

(Bombardier), Jim Bostock (ORR), David McLeish (AMCL) 16/12/2010

40 Melton Street, London

WORKSHOP to consider national engineering services

Andrew Newby (NR), Martin Elwood (NR), Richard Spoors (ind), David Wyn (NR), Francis How (RIA)

© C row n co pyr ight , 20 11 Appendix D – Research

1. Accenture. (2003, 07 11). Review of Network Rail’s Supply Chain. 2. AMCL. (2009, 11 07). 2009 Best Practice Review Update.

3. AMCL. (2010, 05 04). Asset Management Improvement Roadmap.

4. AMCL. (2008, 01). Case Study: Network Rail Independent Reporter Asset Management Assessment.

5. AMCL. (2010, 05 04). Network Rail Asset Management Improvement Roadmap Appendix D (part 1).

6. AMCL. (2010, 05 04). Network Rail Asset Management Improvement Roadmap Appendix D (part 2).

7. AMCL. (2010, 03 09). RFF Infrastructure Manager Interviews.

8. ATKearney. (2010, 03 31). 2010 Assessment of Excellence in Procurement (AEP Study). 9. ATKearney. (2007, 09 10). CP4 Procurement Opportunity Assessment - Appendix 2. 10. ATKearney. (2007, 09 10). CP4 Procurement Opportunity Assessment - Main Report. 11. ATKearney. (2007, 10 30). CP4 Procurement Opportunity Assessment - Main Report

Update.

12. Atkins. (2010, 01). Process & Lifecycle Framework.

13. Bombardier. (n.d.). Value for Money in rail – Bombardier’s perspective.

14. BSL Management Consultants. (2008, 08 26). Rail Infrastructure Cost Benchmarking - Integration of East-Asian Comparators carried out on behalf of the Railway Industry Association, London.

15. Competition Commission. (2009, 04 07). Rolling Stock Leasing Market Investigation - Competition Commission.

16. Dean, James; Network Rail. (2010, 07 30). Supplementary Information On Asset Management Policies.

17. Department for Transport. (2010). High Speed Rail. London: Department for Transport. 18. Department for Transport. (2005, 12 12). Thameslink/GN Franchise SLC1.

19. Department for Transport. (2007, 07). White Paper - Delivering a Sustainable Railway. 20. Department for Transport, Office of Rail Regulation. (2010, 03 31). Rail Value for Money -

Scoping study report.

21. Department for Transport; BIS. (2010, 06). The UK rail supply chain: Stakeholder views on barriers to growth and efficiency - Appendixes.

22. Department for Transport; BIS. (2010, 06). The UK rail supply chain: Stakeholder views on barriers to growth and efficiency - Executive Summary.

23. Department for Transport; BIS. (2010, 06). The UK rail supply chain: Stakeholder views on barriers to growth and efficiency - Report.

© C row n co pyr ight , 20 11

24. Doherty, Andy; Network Rail. (2010, 07 30). Track Friendly Trains – A Summary.

25. Freshfields Bruckhaus Deringer. (2005, 12). First Capital Connect Franchise Agreement. 26. Freshfields Bruckhaus Deringer. (n.d.). The National Rail Franchise Terms.

27. Gray, B. (2009). Review of Acquisition for the Secretary of State for Defence. London: Ministry of Defence.

28. Halcrow Group Limited. (2009, 08). Executive Summary: Birmingham New Street Gateway Project.

29. Halcrow Group Limited. (2009, 03). Executive Summary: Kings Cross Redevelopment Project 2009.

30. Halcrow Group Limited. (2009, 12). Executive Summary: North London Line Project (CH002).

31. House of Commons. (2010, 03). Railways: 2007 White Paper.

32. Institute for Transport Studies. (2009, 10). International benchmarking of Network Rail's maintenance and renewal costs: An economic study based on the LICB dataset (1996 - 2006).

33. Institute for Transport Studies; Office of Rail Regulation. (2009, 06). International benchmarking of Network Rail's maintenance and renewal costs.

34. Larkinson, John; Office of Rail Regulation. (2010, 04 26). Electrification Projects: Regulatory Arrangements.

35. Larkinson, John; Office of Rail Regulation. (2009, 11 27). Protocol for Network Rail Work on the Crossrail Enhancement Project.

36. Lee, Michael Lee; Office of Rail Regulation. (2010, 04 16). Monitoring and Enforcement of Delivery of Network Rail Enhancement Projects in Scotland.

37. Lee, Michael; Office of Rail Regulation. (2010, 06 03). West Coast main line timetable performance modelling: lessons learned.

38. McNaughton, A. (2010, 07 29). Submission to VfM Study.

39. Ministry of Defence. (2001, 12). Defence Acquisition - Ministry of Defence Policy Paper. 40. Ministry of Defence. (2002, 01). The Acquisition Handbook: A guide to achieving "Faster,

Cheaper, Better".

41. MVA Consultancy. (2010, 05 05). West Coast Main Line – Timetable Performance Modelling Lessons Learnt.

42. Network Rail. (n.d.). Asset Management Benchmarking Tracker.

43. Network Rail. (2010, 03). Asset Policy Documents – What has changed from October 2007. 44. Network Rail. (2010). Investment Projects Group.

© C row n co pyr ight , 20 11

46. Network Rail. (2010, 04). Local Knowledge - Aspects.

47. Network Rail. (n.d.). Main running line track KM by new SR/SRS (rows) and Operating Route / New MDU.

48. Network Rail. (2010, 03). Network Rail Asset Management Policy Justification for Civil Engineering Policy - Civils asset policy March 2010.

49. Network Rail. (2010, 03 26). Network Rail Asset Management Policy Justification for Civil Engineering Policy - Civils Policy Justification.

50. Network Rail. (2010, 06). Network Rail CP4 Delivery Plan 2010 Enhancements programme: state of scope,outputs and milestones June 2010 update.

51. Network Rail. (2010, 06 28). Reliability Centred Maintenance.

52. Network Rail. (2004). Reviewing the Impact of Standards Changes on the Norton Bridge

Resignalling Project. London: Network Rail.

53. Network Rail. (2010, 06). ROSE - high level plan.

54. Network Rail. (2007, 10 02). ROSE Analysis of Maintenance Regimes for TI21 Track Circuits.

55. Network Rail. (n.d.). Signalling, Power and Communications Portfolio Range. Retrieved 08 2010, from Network Rail: http://www.networkrail.co.uk/aspx/5867.aspx

56. Network Rail. (2010, 03 29). Track asset policy part 4 update March 2010 - Policy Statements.

57. Nichols Group. (2010, 06 24). Comparison of railway enhancement costs in Great Britain and barriers preventing delivery of station projects by train operators (Executive Summary). 58. Nichols Group. (2010, 06 24). Comparison of railway enhancement costs in Great Britain

and barriers preventing delivery of station projects by train operators (Report). 59. Nichols Group. (2010, 06 23). Executive Summary: Delivery Plan Power Supply

Assessment: Review of Progress.

60. Nichols Group. (2009, 08 12). Executive Summary: Initial Review of Network Rail's Reading Project.

61. Nichols Group. (2009, 11 26). Executive Summary: Quality Review of Glasgow-Kilmarnock Line.

62. Nichols Group. (2009, 08 05). Executive Summary: Review of Network Rail's Assessment and Plans for its Traction Power Supply Systems Strengthening.

63. Nichols Group. (2009, 12 17). Executive Summary: Review of Network Rail's Capability to Deliver the CP4 Capital Investment Programme.

64. Nichols Group. (2009, 05). Executive Summary: Thameslink Programme Review.

65. Nichols Group. (2010, 05 17). Final Report Executive Summary: Independent Reporter's Assessment of Schedule Slippage Affecting the Thameslink Programme's Key Output 1.

© C row n co pyr ight , 20 11

66. Office of Rail Regulation. (2008, 03). ORR Best Practice Study - A report on the programme of international visits carried out by ORR between July – October 2007 - Summary Report.

67. ORR. (2010). Report on ORR’s review of RSSB. London: ORR.

68. RailKonsult. (2008, 03 05). Review of European Renewal and Maintenance Methodologies - Study Overview.

69. RailKonsult. (2008, 03 05). Review of European Renewal and Maintenance Methodologies - Technical Appendix Number 1.

70. Railway Industry Association. (2010, 02 12). RIA Update 46.

71. Railway Industry Association. (2008, 05 20). The Importance of Change Within the Supply Chain.

72. Railway Industry Association. (2010, 03 25). The Railway Supply Industry: Where Next? 73. Réseau Ferré de France. (2010, 01 31). Organigramme Detaille.

74. Royal United Services Institute. (2007). The Revolution in Defence Acquisition Affairs: Why Smart Acquisition is Working.

75. Royal United Services Institute. (2004). Why Isn't Smart Acquisition Working as it Should? 76. RVfM. (2010, 06 28). Update on Network Rail’s Reliability Centred Maintenance (RCM) -

Meeting Record.

77. RVfM. (2010, 06 28). Update on Network Rail’s Reliability Centred Maintenance (RCM) - Meeting Record with comments.

78. UIC. (2006, 12). Lasting Infrastructure Cost Benchmarking (LICB) - Summary Report. 79. Warship Support Agency. (2003). Developing an Information Sharing Architecture across a

Complex Competitive Environment – INCOSE paper, Andrew L Macaulay and Adrian Jenkins.

© C row n co pyr ight , 20 11

Appendix E – Detailed Findings