Appendix F
LIST OF DRAWINGS LIST OF DRAWINGS
LTA/DBC/CPRP/001
LTA/DBC/CPRP/001 Definitions of reserve lines and zone of inflDefinitions of reserve lines and zone of infl uence for bored tunneluence for bored tunnel LTA/DBC/CPRP/002
LTA/DBC/CPRP/002 Definitions of reserve lines and Definitions of reserve lines and zone of influence for unzone of influence for underground derground andand transition structures
transition structures LTA/DBC/CPRP/003
LTA/DBC/CPRP/003 Definitions of reserve lines and zone of inflDefinitions of reserve lines and zone of infl uence for at grade structureuence for at grade structure LTA/DBC/CPRP/004
LTA/DBC/CPRP/004 Definitions of reserve lines and zone of inflDefinitions of reserve lines and zone of infl uence for above grounduence for above ground structure
structure LTA/DBC/CPRP/005
LTA/DBC/CPRP/005 Trainway cross sectional details for bored Trainway cross sectional details for bored tunneltunnel LTA/DBC/CPRP/006
LTA/DBC/CPRP/006 Trainway cross sectional details for box tunnelTrainway cross sectional details for box tunnel LTA/DBC/CPRP/007
LTA/DBC/CPRP/007 Trainway cross sectional details for viaductTrainway cross sectional details for viaduct LTA/DBC/CPRP/008
LTA/DBC/CPRP/008 Demarcation details for first reserve lineDemarcation details for first reserve line LTA/DBC/CPRP/009
LTA/DBC/CPRP/009 Typical double casing debonding detailsTypical double casing debonding details LTA/DBC/CPRP/010
LTA/DBC/CPRP/010 Typical single casing debonding detailsTypical single casing debonding details LTA/DBC/CPRP/011
LTA/DBC/CPRP/011 Interpretation of track criteriaInterpretation of track criteria
Authority
ZONE OF INFLUENCE FOR BORED TUNNEL ZONE OF INFLUENCE FOR BORED TUNNEL DEFINITIONS OF RESERVE LINES AND DEFINITIONS OF RESERVE LINES AND
Drawing No. :
3rd RESERVE 1st RESERVE1st RESERVE 3rd RESERVE3rd RESERVE
40m
40m 40m40m
TUNNEL AXIS LEVEL TUNNEL AXIS LEVEL
60m 60m
ZONE OF INFLUENCE
ZONE OF INFLUENCE D D E
2nd RESERVE (D1-3) 2nd RESERVE (D2-3)2nd RESERVE (D2-3)
1
the zone of influence of the MRT starts at 3m away from the tip of the toes, the zone of influence of the MRT starts at 3m away from the tip of the toes, and the 1st reserve starts at 6m away from the tip of the toes.
and the 1st reserve starts at 6m away from the tip of the toes.
Where toes are provided to the cut & cover tunnels or underground stations, Where toes are provided to the cut & cover tunnels or underground stations, Note :
2nd RESERVE 1st RESERVE1st RESERVE
RAILWAY SAFETY ZONE
3rd RESERVE 2nd RESERVE2nd RESERVE
(D2-3)m OR 10m WHICHEVER IS GREATER (D2-3)m OR 10m WHICHEVER IS GREATER (D1-3)m OR 10m
Cut & Cover Tunnels Cut & Cover Tunnels
OR
Authority
DEFINITIONS OF RESERVE LINES AND ZONE OF INFLUENCE DEFINITIONS OF RESERVE LINES AND ZONE OF INFLUENCE FOR UNDERGROUND AND TRANSITION STRUCTURES FOR UNDERGROUND AND TRANSITION STRUCTURES the zone of influence of the MRT starts at 3m away from the tip of the toes, the zone of influence of the MRT starts at 3m away from the tip of the toes, and the 1st reserve starts at 6m away from the tip of the toes.
and the 1st reserve starts at 6m away from the tip of the toes.
Where toes are provided to the cut & cover tunnels or underground stations, Where toes are provided to the cut & cover tunnels or underground stations, Note :
2nd RESERVE 1st RESERVE1st RESERVE
RAILWAY SAFETY ZONE
3rd RESERVE 2nd RESERVE2nd RESERVE
(D2-3)m OR 10m WHICHEVER IS GREATER (D2-3)m OR 10m WHICHEVER IS GREATER (D1-3)m OR 10m
Cut & Cover Tunnels Cut & Cover Tunnels
OR
Fence Or Wall Outside Face Of Outside Face Of
Fence Or Wall
3rd RESERVE 3rd RESERVE3rd RESERVE
Outside Face Of
2nd RESERVE 2nd RESERVE2nd RESERVE
2nd RESERVE
2nd RESERVE 2nd RESERVE2nd RESERVE
6m
DEFINITIONS OF RESERVE LINES AND DEFINITIONS OF RESERVE LINES AND
Drawing No.
ZONE OF INFLUENCE FOR AT GRADE STRUCTURE ZONE OF INFLUENCE FOR AT GRADE STRUCTURE
LTA/DBC/CPRP/003 LTA/DBC/CPRP/003
August August
Authority Authority Land Transport
Land Transport
3rd RESERVE 3rd RESERVE
Scal Scal RAILWAY SAFETY ZONE
RAILWAY SAFETY ZONE RAILWAY PROTECTION ZONE RAILWAY PROTECTION ZONE
3rd RESERVE 3rd RESERVE
60m 60m
40m 40m
Outside Face Of Outside Face Of Fence Or Wall
Fence Or Wall Outside Face Of Outside Face Of
Fence Or Wall Fence Or Wall (1
(100m)m) (1(100m)m)
40m 40m
60m 60m
Existing Ground Level Existing Ground Level
(1
(100m)m) (1(100m)m)
3rd RESERVE
3rd RESERVE 3rd RESERVE3rd RESERVE
Outside Face Of Outside Face Of Fence Or Wall Fence Or Wall
Outside Face Of Outside Face Of Fence Or Wall Fence Or Wall 1st RESERVE (VARIES)
1st RESERVE (VARIES) (Limit Of Structure) (Limit Of Structure)
(Limit Of Structure) (Limit Of Structure) 1st RESERVE (VARIES) 1st RESERVE (VARIES)
Le Levvelel E
E x x i i s s t t i i n n g g G G r r o o u u n n d d 40m
40m 40m40m
60m
60m 60m60m
EMBANKMENTS EMBANKMENTS
CUTTINGS CUTTINGS
2nd RESERVE
2nd RESERVE 2nd RESERVE2nd RESERVE
2nd RESERVE
2nd RESERVE 2nd RESERVE2nd RESERVE
6m 6m
6m 6m
6m 6m
6m 6m
Drawing Title Drawing Title
DEFINITIONS OF RESERVE LINES AND DEFINITIONS OF RESERVE LINES AND
Drawing No.
Drawing No.
Not to Not to
Rev.
Rev. 00 Date Date
ZONE OF INFLUENCE FOR AT GRADE STRUCTURE ZONE OF INFLUENCE FOR AT GRADE STRUCTURE
LTA/DBC/CPRP/003 LTA/DBC/CPRP/003
August August
RAILWAY SAFETY ZONE RAILWAY SAFETY ZONE
RAILWAY PROTECTION ZONE RAILWAY PROTECTION ZONE
1st RESERVE 1st RESERVE 6m
6m 6m6m
40m
40m 40m40m
6
600mm 6600mm
Viaduct Column Viaduct Column Existing
Existing Ground LeveGround Levell
PILECAP PILECAP
Top Of Pilecap
Top Of Pilecap 1.5m Generally1.5m Generally
Drawing Title : Drawing Title :
DEFINITIONS OF RESERVE LINES AND DEFINITIONS OF RESERVE LINES AND
Drawing No. : Drawing No. : Scale Scale
Not to Scale Not to Scale
Rev.
Rev.
00
Date Date
ZONE OF INFLUENCE FOR ABOVE GROUND STRUCTURE ZONE OF INFLUENCE FOR ABOVE GROUND STRUCTURE
LTA/DBC/CPRP/004 LTA/DBC/CPRP/004
August 2000 August 2000
RAILWAY SAFETY ZONE RAILWAY SAFETY ZONE
RAILWAY PROTECTION ZONE RAILWAY PROTECTION ZONE
1st RESERVE 1st RESERVE 6m
6m 6m6m
40m
40m 40m40m
6
600mm 6600mm
Viaduct Column Viaduct Column Existing
Existing Ground LeveGround Levell
PILECAP PILECAP
Top Of Pilecap
Top Of Pilecap 1.5m Generally1.5m Generally
Authority Authority Land Transport
Land Transport
Show Dimensions Of Show Dimensions Of
TRACK GEOMETRY TRACK GEOMETRY
X X
Y Y
Y Y
X X
X X X
X X X
Show Dimensions Of Show Dimensions Of Instrument & Bracket Instrument & Bracket
S S t t r r u u c c t t u u r r e e S S t t r r u u c c t t u u r r e e
G G a a u u g g e e G G a a u u g g e e
W W i i t t h h T T h h r r o o w w
Lower Rail Lower Rail
Instrument & Bracket Instrument & Bracket
Throw Throw
Cant = Cant = X X
Horizontal Throw = Versine = Horizontal Throw = Versine = X X
Chainage = Chainage =
Scale 1 : Scale 1 :
Tunnel
Tunnel Profile Profile Facing Facing Toward Toward StationStation
Inner Inner rail rail edgeedge
Authority
DETAILS FOR BORED TUNNEL DETAILS FOR BORED TUNNELLTA/DBC/CPRP/005
2. "" X X " indicates site measurement." indicates site measurement.
3.
3. "Y" "Y" indicates indicates computed computed value.value.
Show Dimensions Of
Enlarge Geometry Of Track Enlarge Geometry Of Track
Not to Scale
Horizontal Throw = Versine = Horizontal Throw = Versine = X X
Chainage = Chainage = Tunnel
Tunnel Profile Profile Facing Facing Toward Toward StationStation
Inner Inner rail rail edgeedge