(Project Funds to Nearest Dollar)
Report Date - September 23, 2020 totals for years 2021 thru 2024
Selection Criteria (from SEARCH panel - if any) Washington State S. T. I. P.
Agency County MPO
Region
Envrionmental Classification Priority Number
Title PIN
STIP ID Amendment Number
Agency Project ID Secured Y Planned
Is New Current Action
Future Action Amended
Approved as of Date Federal Fund Code State Fund Code Inside MPO
MPO Project ID 2021 to 2024
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County:
Agency: BFCG
Func Cls
Project
Number PIN STIP ID
Imp
00 WA-10725 18 CE No N/A N/A 970,251
2021-2023 Unified Planning Work Program
This project will support regional transportation tasks outlined in BFCG's UPWP during years 2020, 2021 and 2022 including the Regional Traffic Count Program.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
PL 2021 STP(UL) 214,728 0 33,512 248,240
PL 2021 STP(US) 7,068 0 1,103 8,171
PL 2021 STP(R) 57,961 0 9,045 67,006
PL 2022 STP(UL) 214,728 0 33,512 248,240
PL 2022 STP(US) 7,068 0 1,103 8,171
PL 2022 STP(R) 57,961 0 9,045 67,006
PL 2023 STP(UL) 214,728 0 33,512 248,240
PL 2023 STP(US) 7,068 0 1,103 8,171
PL 2023 STP(R) 57,961 0 9,045 67,006
Project Totals 839,271 0 130,980 970,251
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County:
Agency: BFCG
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PL 323,417 323,417 0 0 0
Totals 323,417 323,417 0 0 0
Federal Funds
State Funds Local Funds Total
Agency Totals for BFCG 839,271 0 130,980 970,251
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Connell
Func Cls
Project
Number PIN STIP ID
Imp
00 WA-10805 03 3.520 CE No MP 110.45 MP 112.55 24,100,000
Connell Rail Interchange
Relocating current switch yard to new location, for better mobility and ease of access.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
PE 2022 0 WSDOT 600,000 0 600,000
Project Totals 0 600,000 0 600,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 600,000 0 0 0
CN 0 0 0 0 23,500,000
Totals 0 600,000 0 0 23,500,000
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Franklin Co.
Func Cls
Project
Number PIN STIP ID
Imp
07 2011(052) WA-07940 28 0.200 CE No 0.06 0.26 354,187
Basin City Alternative Transportation Route Improvements II
Replace pedestrian ramps, build new path, improve drainage, add illumination, and traffic markings.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
CN 2022 TAP(R) 126,670 0 19,770 146,440
CN 2022 STP(R) 145,101 0 22,646 167,747
Project Totals 271,771 0 42,416 314,187
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 314,187 0 0 0
Totals 0 314,187 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Franklin Co.
Func Cls
Project
Number PIN STIP ID
Imp
07 2011(049) WA-10376 11 0.240 CE Yes 9.80 10.04 1,113,585
Coyan Bridge #200-9.93
Replace existing structurally-deficient bridge
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
CN 2021 STP(BR) 762,050 CRAB 190,500 12 952,562
Project Totals 762,050 190,500 12 952,562
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 952,562 0 0 0 0
Totals 952,562 0 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Franklin Co.
Func Cls
Project
Number PIN STIP ID
Imp
06 2011(054) WA-10399 11 0.100 CE Yes 6.22 6.32 923,775
Hollingsworth Bridge #460-6.25
Replace structurally deficient timber bridge
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
RW 2021 STP(BR) 10,000 0 2,500 12,500
CN 2023 STP(BR) 639,020 0 159,755 798,775
Project Totals 649,020 0 162,255 811,275
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 12,500 0 0 0 0
CN 0 0 798,775 0 0
Totals 12,500 0 798,775 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Franklin Co.
Func Cls
Project
Number PIN STIP ID
Imp
07 2011(053) WA-12297 11 0.310 CE Yes 4.73 5.04 2,142,900
Ironwood Bridge #636-4.87 Replacement Replace structurally deficient timber bridge
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
RW 2021 STP(BR) 10,000 0 2,500 12,500
CN 2023 STP(BR) 1,537,920 0 384,480 1,922,400
Project Totals 1,547,920 0 386,980 1,934,900
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 12,500 0 0 0 0
CN 0 0 1,922,400 0 0
Totals 12,500 0 1,922,400 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Franklin Co.
Func Cls
Project
Number PIN STIP ID
Imp
06 01AH(001) WA-12318 11 0.100 CE Yes 0.80 0.90 1,747,037
Muse Drive Bridge #211-0.85 Replacement Replace structurally deficient timber bridge
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
RW 2021 STP(BR) 10,000 0 2,500 12,500
CN 2023 STP(BR) 1,221,230 0 305,307 1,526,537
Project Totals 1,231,230 0 307,807 1,539,037
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 12,500 0 0 0 0
CN 0 0 1,526,537 0 0
Totals 12,500 0 1,526,537 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Franklin Co.
Func Cls
Project
Number PIN STIP ID
Imp
05 F115(003) WA-05183 04 3.010 CE Yes MP 5.92 - Peterson Road MP 8.93 3,466,613
Pasco-Kahlotus Road Reconstruction/Overlay II
The project will upgrade an existing two-lane roadway to provide safety, mobility, and approach improvements. The improvements will consist of reconstructing a portion of the roadway to correct for vertical sight distance issues, pavement widening and overlay for the total length of the project, roadway-related storm water facilities, and address clear zone issues.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
CN 2021 0 CRAB 1,520,000 152,000 1,672,000
CN 2021 STP(R) 1,168,100 0 182,305 1,350,405
Project Totals 1,168,100 1,520,000 334,305 3,022,405
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 3,022,405 0 0 0 0
Totals 3,022,405 0 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Franklin Co.
Func Cls
Project
Number PIN STIP ID
Imp
07 000S(552) WA-12298 21 0.000 CE No varies varies 313,500
Safety- LED Signs, Dynamic Signals & Reflector Posts
Install/upgrade signs (LED Stop Ahead warning signs), install dynamic intersection warning signs (Entering Traffic When Flashing), install radar speed signs, and install/upgrade signs (Stop signs) and reflector posts.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
CN 2021 HSIP 287,300 0 0 287,300
Project Totals 287,300 0 0 287,300
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 287,300 0 0 0 0
Totals 287,300 0 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Franklin Co.
Func Cls
Project
Number PIN STIP ID
Imp
05 D110(002) WA-12301 21 0.130 CE No 0.00 0.13 73,500
Safety-Eltopia West Railroad Crossing
Reduce shoulder width, install guardrail, and pavement markings at railroad crossing
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
CN 2021 HSIP 67,400 0 0 67,400
Project Totals 67,400 0 0 67,400
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 67,400 0 0 0 0
Totals 67,400 0 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Franklin Co.
Func Cls
Project
Number PIN STIP ID
Imp
07 000S(551) WA-12300 21 0.000 CE No varies varies 208,600
Safety-Guardrail/Curve Improvements at Blanton Road, R-170, and Columbia River Road
Install/upgrade permanent signing, pavement markings, delineation, rumble strips, and guardrail at various predetermined locations
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
CN 2021 HSIP 191,200 0 0 191,200
Project Totals 191,200 0 0 191,200
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 191,200 0 0 0 0
Totals 191,200 0 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Franklin Co.
Func Cls
Project
Number PIN STIP ID
Imp
07 2011(050) WA-09041 11 0.100 CE No 8.74 8.84 363,100
Selph Landing #906-8.79 Replacement Replace existing bridge
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
CN 2021 STP(BR) 233,090 CRAB 58,300 0 291,390
Project Totals 233,090 58,300 0 291,390
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 291,390 0 0 0 0
Totals 291,390 0 0 0 0
Federal Funds
State Funds Local Funds Total
Agency Totals for Franklin Co. 6,409,081 1,768,800 1,233,775 9,411,656
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Benton Agency: Kennewick
Func Cls
Project
Number PIN STIP ID
Imp
03 9903(020) kenn71 03 0.100 CE Yes I/S Deschutes I/S Columbia Center Blvd 1,300,000
Deschutes/Columbia Center Boulevard Intersection
Construct a right-turn lane for added turning capacity for west-bound traffic turning north onto Columbia Center Blvd. In addition, proposed work will be in preparation for extending a third lane for north and south-bound traffic on Columbia Center Blvd.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
RW 2021 STP(UL) 173,000 0 27,000 200,000
Project Totals 173,000 0 27,000 200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 200,000 0 0 0 0
Totals 200,000 0 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Benton Agency: Kennewick
Func Cls
Project
Number PIN STIP ID
Imp
03 9903(018) kenn90 03 0.100 CE Yes I/S Quinault I/S Columbia Center Blvd 1,300,000
Quinault & Columbia Center Blvd. Intersection
Project will provide a second left-turn lane for added turning capacity for east-bound traffic turning north onto Columbia Center Blvd. A second through-lane is being provided for west-bound traffic on Quinault Ave. along with an additional lane southbound that will turn into the Red Lion. In addition, proposed work will be in preparation for extending third lane south of the intersection for north and south-bound traffic on Columbia Center Blvd.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
RW 2021 STP(UL) 173,000 0 27,000 200,000
Project Totals 173,000 0 27,000 200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 200,000 0 0 0 0
Totals 200,000 0 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Benton Agency: Kennewick
Func Cls
Project
Number PIN STIP ID
Imp
03 9903(019) kenn74 03 0.100 CE Yes I/S Steptoe Street I/S Gage Blvd 3,730,000
Steptoe Street / Gage Boulevard Intersection
Improvements consist of providing dual left turn lanes on each approach as well as new dedicated right turn lanes on the southbound and eastbound legs. Traffic signal timing will be optimized with this configuration along with the elimination of split phase timing.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
RW 2021 STP(UL) 346,000 0 54,000 400,000
CN 2022 STP(UL) 2,595,000 0 405,000 3,000,000
Project Totals 2,941,000 0 459,000 3,400,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 400,000 0 0 0 0
CN 0 3,000,000 0 0 0
Totals 400,000 3,000,000 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Benton Agency: Kennewick
Func Cls
Project
Number PIN STIP ID
Imp
04 kenn98 04 0.310 CE Yes 1st Avenue Columbia Drive 900,000
Washington Street
Connect the wine village area with downtown, including sidewalks, benches, landscaping, railroad crossings, street lighting, and road widening/diet options.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
PE 2021 0 TIB 37,000 0 37,000
RW 2021 0 TIB 37,000 0 37,000
CN 2021 0 TIB 426,000 0 426,000
Project Totals 0 500,000 0 500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 37,000 0 0 0 0
RW 37,000 0 0 0 0
CN 413,000 413,000 0 0 0
Totals 487,000 413,000 0 0 0
Federal Funds
State Funds Local Funds Total
Agency Totals for Kennewick 5,231,000 13,650,000 1,555,000 20,436,000
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Pasco
Func Cls
Project
Number PIN STIP ID
Imp
04 3522(001) WA-12229 03 1.150 CE No Varney/Sacramento Way 20th Ave 2,316,059
Argent Road Improvement, Phase 1
Federal project STPUL-3522(001) will be for design of phases 1 and 2, environmental of phases 1, 2, and 3 and construction of phase 1. Project will be done in 3 phases: Phase 1 construction is from 20th Avenue to Saraceno Way/Varney Lane including widening of the roadway to include additional through and turn lanes, sidewalks, stormwater, illumination, and related improvements. Phase 2 construction is at the intersection of Argent Road and Road 36. Improvements will include a signal or roundabout, sidewalks, stormwater, illumination, and related improvements.
Phase 3 construction will construct improvements from Saraceno Way/Varney Lane to the Road 36 Intersection including widening of the roadway to include additional through and turn lanes, sidewalks, stormwater, illumination, and related improvements
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
CN 2021 0 0 1,600,000 1,600,000
Project Totals 0 0 1,600,000 1,600,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 1,785,995 0 0 0 0
Totals 1,785,995 0 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Pasco
Func Cls
Project
Number PIN STIP ID
Imp
04 3522(002) WA-12648 03 0.790 CE Yes Varney Lane/Saraceno Way Road 36 Vicinity 4,495,000
Argent Road Widening, Phase 3
Street widening with a new roadway surface, signage and striping. Curb/gutter, sidewalk and curb ramps. Utility work including stormwater facilities, irrigation, illumination, and related improvements.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
PE 2021 STP(UL) 428,175 0 66,825 495,000
CN 2023 STP(UL) 3,460,000 0 540,000 4,000,000
Project Totals 3,888,175 0 606,825 4,495,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 495,000 0 0 0 0
CN 0 0 4,000,000 0 0
Totals 495,000 0 4,000,000 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Pasco
Func Cls
Project
Number PIN STIP ID
Imp
03 9911(012) WA-12647 04 0.080 CE Yes Vicinity of Court Street Vicinity of Court Street 991,000
Court Street & Road 68 Intersection Improvements
This project will consist of the design and construction of intersection control measures. This intersection has proven to be unsafe and in need of improvement due to an increase in the Average Daily Traffic (ADT) demands associated with the development in the area that has added additional vehicles to this intersection
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
PE 2021 STP(UL) 91,690 0 14,310 106,000
RW 2022 STP(UL) 112,450 0 17,550 130,000
CN 2023 STP(UL) 657,400 0 97,600 755,000
Project Totals 861,540 0 129,460 991,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 106,000 0 0 0 0
RW 32,503 97,497 0 0 0
CN 0 0 755,000 0 0
Totals 138,503 97,497 755,000 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Pasco
Func Cls
Project
Number PIN STIP ID
Imp
04 WA-12225 03 0.280 CE No 5th Ave 2nd Ave 1,923,584
Lewis Street Corridor Improvement
The project is intended to tie the improvements made with the overpass project into those made under the Peanuts Park improvement project.
Taking into account the anticipated increase in pedestrian/bicycle traffic as well as the positive impact to businesses within this corridor, this project is intended to enhance the accessibility to businesses and improve the safety and efficiency of the transportation corridor.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
PE 2021 CDBG 224,250 0 0 224,250
CN 2021 CDBG 523,750 0 606,584 1,130,334
CN 2022 CDBG 469,000 0 100,000 569,000
Project Totals 1,217,000 0 706,584 1,923,584
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 224,250 0 0 0 0
CN 1,130,334 569,000 0 0 0
Totals 1,354,584 569,000 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Pasco
Func Cls
Project
Number PIN STIP ID
Imp
03 3530(006) WA-01715 03 0.450 EIS Yes Oregon Ave 2nd Ave 34,929,357
Lewis Street Overpass
Construct a new overpass between 2nd Ave and Oregon Ave. A new overpass will replace the existing underpass which is deteriorating.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
PE 2021 0 CWA 750,000 0 750,000
CN 2021 0 CWA 12,850,000 0 12,850,000
CN 2021 0 TIB 5,000,000 4,294,547 9,294,547
CN 2021 0 WSDOT 4,400,000 0 4,400,000
Project Totals 0 23,000,000 4,294,547 27,294,547
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 750,000 0 0 0 0
CN 16,901,547 9,643,000 0 0 0
Totals 17,651,547 9,643,000 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Pasco
Func Cls
Project
Number PIN STIP ID
Imp
03 3515(009) WA-06309 03 0.280 CE No Chapel Hill Boulevard South I-182 308,000
Road 68 Widening - South of I-182
Widening Road 68 from Chapel Hill Boulevard to I-182 eastbound ramps; increasing to two travel lanes in each direction, with turn lanes and tapers as needed.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
CN 2021 STP(UL) 216,250 0 33,750 250,000
Project Totals 216,250 0 33,750 250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 250,000 0 0 0 0
Totals 250,000 0 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Pasco
Func Cls
Project
Number PIN STIP ID
Imp
04 3515(010) WA-07739 04 0.510 CE No Wrigley Drive I-182 WB 315,000
Signage & Striping at Road 68/Burden Blvd
This project will address safety and efficiency for the Road 68 interchange and nearby local network through the addition of signage and revisions to channelization through the Burden Boulevard & Road 68 intersection.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
CN 2021 STP(UL) 224,900 0 35,100 260,000
Project Totals 224,900 0 35,100 260,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 260,000 0 0 0 0
Totals 260,000 0 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Pasco
Func Cls
Project
Number PIN STIP ID
Imp
03 9911(011) WA-08734 21 CE Yes various various 3,585,239
Traffic Signal Improvements - City Wide Phase 2
Replace all of the City’s obsolete signal equipment with updated signal controllers, signal equipment, signal interconnect equipment, optimized corridor timing plans, vehicle detection system and emergency vehicle priority system. Pedestrian access will be upgraded to meet current ADA right of way accessibility design guidelines for the signalized intersections. PE done under federal project 9911(010)
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
CN 2021 HIP(UL) 405,987 0 54,808 460,795
CN 2021 STP(UL) 2,150,769 0 415,990 2,566,759
CN 2021 TAP(UL) 146,891 0 22,925 169,816
Project Totals 2,703,647 0 493,723 3,197,370
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 3,197,370 0 0 0 0
Totals 3,197,370 0 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Franklin Agency: Pasco
Func Cls
Project
Number PIN STIP ID
Imp
05 3552(001) WA-06941 01 0.140 CE Yes Clemente Lane Convention Drive 490,416
Wrigley Drive Extension
This project will extend Wrigley Drive from Clemente Lane to Convention Drive.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
CN 2021 STP(UL) 262,940 0 41,040 303,980
Project Totals 262,940 0 41,040 303,980
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 303,980 0 0 0 0
Totals 303,980 0 0 0 0
Federal Funds
State Funds Local Funds Total
Agency Totals for Pasco 9,374,452 23,000,000 11,603,294 43,977,746
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Benton Agency: Prosser
Func Cls
Project
Number PIN STIP ID
Imp
06 B030(001) PROSSER 7 04 0.760 CE No West City Limits Wine Country Road 1,426,265
Old Inland Empire Highway Improvements
Reconstruct and widen roadway, curb and gutter, sidewalk, storm drainage, street lighting, hot mix asphalt, and pavement markings.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
CN 2023 STP(US) 332,175 0 761,439 1,093,614
CN 2023 TAP(US) 40,643 0 6,343 46,986
Project Totals 372,818 0 767,782 1,140,600
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 0 0 1,140,600 0 0
Totals 0 0 1,140,600 0 0
Federal Funds
State Funds Local Funds Total
Agency Totals for Prosser 372,818 0 767,782 1,140,600
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Benton Agency: Richland
Func Cls
Project
Number PIN STIP ID
Imp
03 9903(023) R031 03 0.680 CE Yes I-182 Comstock Street 7,718,770
South George Washington Way Intersection Improvements
Upgrade and reconfigure George Washington Way(GWW) including the intersections of GWW/Columbia Point Drive/Adams Street and GWW/Comstock Street to provide improved safety, capacity, and mobility. Also includes modifying the WB I-182, NB SR 240, and SB SR 240 ramps to improve safety.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
RW 2022 STP(UL) 389,250 0 60,750 450,000
Project Totals 389,250 0 60,750 450,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 0 450,000 0 0 0
Totals 0 450,000 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Benton Agency: Richland
Func Cls
Project
Number PIN STIP ID
Imp
04 WA-12722 21 0.100 CE Yes Thayer Dr Thayer Dr 801,900
VanGiesen/Thayer Intersection Improvements
Reconstruct the intersection of VanGiesen Street and Thayer Drive as a single lane roundabout.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
CN 2021 HSIP 741,200 0 0 741,200
Project Totals 741,200 0 0 741,200
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
CN 741,200 0 0 0 0
Totals 741,200 0 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Benton Agency: Richland
Func Cls
Project
Number PIN STIP ID
Imp
05 9903(025) R018 28 0.400 CE Yes Hagen Road Stevens Drive 1,304,000
Vantage Highway Pathway - Phase 2
Construct a new, separated Hot Mix Asphalt multi-use pathway connecting the Vantage Highway Pathway Phase 1 with the Stevens Drive Pathway.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
RW 2021 TAP(UL) 86,500 0 13,500 100,000
CN 2022 TAP(UL) 295,459 0 640,227 935,686
CN 2022 STP(UL) 232,092 0 36,222 268,314
Project Totals 614,051 0 689,949 1,304,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 100,000 0 0 0 0
CN 0 1,204,000 0 0 0
Totals 100,000 1,204,000 0 0 0
Federal Funds
State Funds Local Funds Total
Agency Totals for Richland 1,744,501 0 750,699 2,495,200
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County: Benton Agency: West Richland
Func Cls
Project
Number PIN STIP ID
Imp
04 WA-08829 21 0.000 CE Yes BOMBING RANGE ROAD KEENE RD 1,275,000
BOMBING RANGE RD/ KEENE RD INTERSECTION MODIFICATIONS Construct a two lane roundabout.
Funding
Phase Start Date Federal Fund Code
Federal Funds
State Fund Code State Funds Local Funds Total
RW 2021 STP(UL) 64,875 0 10,125 75,000
Project Totals 64,875 0 10,125 75,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
RW 75,000 0 0 0 0
Totals 75,000 0 0 0 0
Washington State S. T. I. P.
2021 to 2024
(Project Funds to Nearest Dollar)
MPO/RTPO: BFCG Y Inside N Outside September 23, 2020
County:
Agency: WSDOT - SC
Func Cls
Project
Number PIN STIP ID
Imp
00 BPBF BPBF 05 CE No Varies Varies 9,826,131
00 BPBF BPBF 05 CE No Varies Varies 9,826,131