• No results found

BASELINE MAINTENANCE INSPECTOR OJT PLAN

This appendix provides the baseline OJT plan for new-hire airline maintenance inspectors. It should be augmented with additional OJT tasks as necessary for each individual inspector and their assigned duties and responsibilities.

Notes:

- The tasks are grouped according to general areas and order of introduction into the OJT process.

- Within a general area, tasks are not provided in the recommended order of introduction.

A. Baseline Inspection OJT Tasks

The trainee should be able to demonstrate competency in the conduct of generic safety oversight inspections in order to be usable as inspectors on a basic level.

N° Task Description Level 1 Level 2 Level 3

date sign date sign date sign 1 Inspect Flight Deck Equip Functioning Inflight

2 Inspect Aircraft Cabin Enroute 3 Inspect Maintenance Programme 4 Inspect Maintenance Main Base 5 Inspect Line Station

6 Inspect Reliability Programme 7 Inspect Airworthiness Records 8 Inspect Aircraft Records

9 Inspect Airworthiness Directive Records 10 Inspect Major Repair or Modification 11 Inspect Aircraft on Ramp

12 Inspect Maintenance in Progress 13 Inspect Fuelling Facilities

14 Inspect ETOPS Programme Conformance 15 Inspect Airworthiness Reports

16 Inspect Aviation Maintenance Technician at Work

17 Inspect Aviation Repair Specialist at Work

International Civil Aviation Organisation

Cooperative Development of Operational Safety & Continuing Airworthiness Programme COSCAP-Gulf States

________________________________________________________________________________________

B. Baseline Administrative Resolution OJT Tasks

During the conduct of inspections, the trainee will be identifying safety issues which require administrative processing to resolution. Basic competency is these tasks are important to safety oversight.

SI = Safety Issue

C. Baseline Investigation OJT Tasks

During the conduct of inspections, the trainee will also encounter situations that will require the application of investigation techniques. The trainee will be assigned the processing of at least one complete enforcement investigation during the OJT period.

N° Task Description Level 1 Level 2 Level 3

date sign date sign date sign 1 Safety Issue Resolution Process

2 SI Resolution: Counseling of Individuals 3 SI Resolution: Formal Notification & Reply 4 SI Resolution: Voluntary Disclosure 5 SI Resolution: Remedial Training

6 SI Resolution: Vary Operational Authorization 7 SI Resolution: Re-Examination of Individual 8 SI Resolution: Vary PEL License Privileges 9 SI Resolution: License/CertificateSurrender 10 SI Resolution: Cancellation of Safety Issuer 11 SI Resolution: Warning Notice

12 SI Resolution: Aircraft Condition Notice 13 SI Resolution: Prevent Flying

14 SI Resolution: Letter of Warning 15 SI Resolution: Letter of Correction

N° Task Description Level 1 Level 2 Level 3

International Civil Aviation Organisation

Cooperative Development of Operational Safety & Continuing Airworthiness Programme COSCAP-Gulf States

________________________________________________________________________________________

D. Baseline Personnel Licensing OJT Tasks

Personnel licensing is another area where the trainee should have good transfer of learning.

They should be provided opportunities to accomplish PEL tasks that require the review of a technically qualified inspector.

E. Baseline Evaluation OJT Tasks

The conduct of evaluations is more complex than the simple “yes/no” of inspections. For evaluations, the trainee must apply knowledge, experience and qualifications to complete these evaluations. It is important that the trainee understand the need to make a conformance evaluation first, before applying technical knowledge. The trainee must demonstrate ability to conduct these baseline evaluations and apply the same techniques to variations of the type of evaluations.

4 Authoring Inspector Statement 5 Interviewing Witnesses

6 Investigation - Accident

N° Task Description Level 1 Level 2 Level 3

date sign date sign date sign 1 Issue Aviation Maintenance Technician

Licence

2 Issue Aviation Repair Specialist Licence

N° Task Description Level 1 Level 2 Level 3

date sign date sign date sign 1 Evaluate Approved Maintenance Organization

2 Evaluate Maintenance Control Manual 3 Evaluate Maintenance-Critical Contracts 4 Evaluate Aircraft Lease

5 Evaluate Quality Assurance Procedures 6 Evaluate Maintenance Records Procedures 7 Evaluate Short-Term Escalation Procedures 8 Evaluate Maintenance Training Procedures 9 Evaluate Reliability Programme

10 Evaluate Minimum Equipment List 11 Evaluate Maintenance Records

12 Evaluate Weight & Balance Procedures

International Civil Aviation Organisation

Cooperative Development of Operational Safety & Continuing Airworthiness Programme COSCAP-Gulf States

________________________________________________________________________________________

F. Baseline Aircraft Certification OJT Tasks

These baseline certification tasks are meant to get the trainee involved in the processing of certifications as a body of evaluations, inspections and demonstrations.

G. Baseline Organization Certification OJT Tasks

These baseline certification tasks are meant to get the trainee involved in the processing of certifications as a body of evaluations, inspections and demonstrations.

H. Baseline Inspector Training OJT Task

The trainee must demonstrate basic competency in the ability to apply the CAA OJT training concepts in order to provide OJT training to other CAA inspectors.

13 Evaluate Deicing Procedures

14 Evaluate ETOPS Conformance & Programme

N° Task Description Level 1 Level 2 Level 3

date sign date sign date sign 1 Issue Certificate of Airworthiness

2 Issue Special Flight Authorisation

N° Task Description Level 1 Level 2 Level 3

date sign date sign date sign 1 Certification Phase 1: Pre-Application

2 Certification Phase 2: Initial Application Review 3 Certification Phase 3: Document Conformance 4 Certification Phase 4: Inspection &

Demonstration

5 Certification Phase 5: Final Certification Actions 6 Evaluate Regulations Conformance

(Compliance) Checklist 7 Issue Certification Documents

N° Task Description Level 1 Level 2 Level 3

International Civil Aviation Organisation

Cooperative Development of Operational Safety & Continuing Airworthiness Programme COSCAP-Gulf States

________________________________________________________________________________________

APPENDIX 6-C _AOC CERTIFICATION: MAINTENANCE OJT QUALIFICATION

The following on-the-job task qualifications must be completed for inspectors planning to perform critical certification project coordinator duties in addition to those accomplished during the baseline OJT process.

The OJT task qualifications in this appendix will be accomplished following the completion of the local course: AOC Certification and Administration (Airworthiness).

*****

N° Task Description Level 1 Level 2 Level 3

date sign date sign date sign 1 Certification Project Coordinator Duties

2 Certification: AOC: Large Aircraft Operator 3 Certification: AOC: Private / Air Taxi Operator 4 Add New Aircraft Type to Existing AOC

5 Add Same Aircraft Type to Existing AOC 6 Conduct Pre-Application Meeting

7 Conduct Emergency Evac Demonstration 8 Conduct Emergency Evac Demonstration 9 Conduct Demonstration Flight

10 Conduct Validation Flight

11 Prepare Completed Certification Report 12 Prepare AOC Operations Specifications 13 Prepare AOC Certificate

International Civil Aviation Organisation

Cooperative Development of Operational Safety & Continuing Airworthiness Programme COSCAP-Gulf States

________________________________________________________________________________________

APPENDIX 6-D _ INVESTIGATIONS: MAINTENANCE OJT