CHAPTER 5: SUMMARY, CONCLUSIONS AND RECOMMENDATIONS

5.12 Caution

The recommendations in this study should be adopted with caution as the findings at this stage are only hypothetically based on the central coastal Namibian mines. This is further explained by the methodology and exploratory nature of the research.

130

REFERENCES

Akintoye, A., and Li, B., (2003). Public-Private Partnership: Managing Risks and Opportunities – An Overview of Public-Private Partnerships. Edinburgh: Blackwell Science.

Agyemang, P.F., (2011). Effectiveness of Public Private Partnership in infrastructure Projects. Unpublished MSc Thesis. Graduate School of Engineering, Arlington:

University of Texas.

Akampurira E., Root D., and Shakantu, W., (2007). Factors of Constraining the Implementation of Public-Private Partnership in the Electricity Sectors in Uganda. JESA, Vol. 20, No. 2, pp. 4, May 2009, University of Cape Town and Nelson Mandela Metropolitan University.

Asian Development Bank [ADB], (2009). Toolkit for Public-Private Partnerships in Urban Water Supply for Maharashtra. New Delhi: A CRISIL – Assisted Rapid Assessment Study.

Asian Development Bank [ADB], (2006). Facilitating Public-Private Partnership for Accelerated Infrastructure Development in India. Workshop Report. New Delhi:

Department of Economic Affairs, Ministry of Finance.

Asian Development Bank [ADB] (2000). Developing Best Practices for Promoting Private Sector Investment in Infrastructure: Water Supply. Manila: Asian Development Bank.

Avery, N., (2010). Public-Private Partnership: A Practical Analysis. 2nd Edition. London:

Globe Business Publishing Ltd.

131

Areva, (2010). Areva Desalination Plant Inauguration. [Online]. Available from:

http://www.areva.com/mediatheque/.../mines/pdf-dessal-namibie-va.pdf. [Accessed 16/08/2011]

Areva Resources Namibia, (2011). [Online]. Available from: http://www.areva-nc-com.

[Accessed 18/05/2011].

Bannerman Resources, (2011). Annual Information Form for the Financial Year Ended June 30, 2011. Perth: Bannerman Resources.

Becker, F., (2002). Water Demand, Supply and Resource Development (Namibian and Botswana Sectors). Specialist Report. Windhoek.

Bing, L., (2005). The Allocation of Risk in PPP/PFI Construction Projects in UK.

International Journal of Project Management, Vol. 23, pp. 25 – 35.

Busch, M., and Mickols, W.E., (2004). Reducing Energy Consumption in Seawater Desalination. Desalination, Vol. 165, 2004, pp. 299 – 312.

Bult-Spiering, M., and Dewulf, G., (2006). Strategic Issues in Public-Private Partnerships: An International Perspective. Singapore: COS Printer Pte Ltd.

Buys, F., (2002). Research Methodology and Techniques. Port Elizabeth: Nelson Mandela Metropolitan University.

Chamber of Mines of Namibia [CoM], (2010). Annual Review. Windhoek.

Charles, N., (2006). Public-Private Partnerships as Modes of Procuring Public Infrastructure and Service Delivery in Developing Countries: Lessons from Uganda.

International Public Procurement Conference Proceeding, 21 – 23 September 2006, pp.

693 – 709.

132

Chilipunde, R.L., (2010). Constraints and challenges faced by small, medium and micro enterprise contractors in Malawi. MSc Treatise. Port Elizabeth: Nelson Mandela Metropolitan University.

Chinyere, I.I., and Xu, X., (2011). Public-Private Partnerships: The Underlining Principles of Infrastructure Investment, Finance and Development Projects. China:

Huazhong University of Science & Technology. International Journal of Business and Management, Vol. 7, No. 1. URL: http://dx.doi.org/10.5539/ijbm.v7n1p109

Council for Scientific and Industrial Research [CSIR], (2008). EIA for proposed NamWater Desalination Plant near Swakopmund: Background Information Document.

Pretoria: CSIR.

Davies, J., (2006). Risk Transfer in Private Finance Initiatives (PFI): An Economic Analysis. UK: DTI

Deloitte, (2010). Structuring Effective Public-Private Partnerships for Infrastructure.

Available:http://www.deloitte.com/assets/DcomGlobal/Local%20Assets/Documents/Publ ic%20Sector/att-ps-partneringforvalue-090710.pdf. [Accessed: 10 July 2011].

Deloitte, (2009). PPP‟s and the Water Sector: Plugging the Infrastructure Hole.

Brisbane: Deloitte Touche Tohamatsu.

Denscombe, M., (2003). The Good Research Guide. 2nd Edition. Philadelphia: Open University Press.

Department of Water Affairs [DWA], (1996). Feasibility Study on Water Supply to the Central Namib Area of Namibia, , Planning Division, Volumes 1 - 13, August 1996.

Department of Treasury & Finance, (2010). Facts and Fictions about Public-Private Partnership. Australia: Victoria.

133

Drews, H., (2010). Concepts for Bulk Water Supply to Uranium Mines in Central Namib Area. Windhoek: NamWater.

Duvenhage, W., (2010). Erongo Miners Water Utilisation Group (EMWUG). Windhoek.

Earl, G., and Regan, M., (2003). Public-Private Partnerships and Beyond. Brisbane.

Ecorys Research and Consulting, (2008). Our PPP Advisory Services: A competence Statement. [Online]. Available at:

http://www.ecorys.com/dmdocuments/061108%20competence%20statement%20ppp%

20advisory%20services%20final.pdf. [Accessed 10/07/2011].

European Investment Bank, (2011). The Economic of Infrastructure Finance: Public-Private Partnerships Versus Public Provision. EIB Papers, Volume 15, No 1, 2010.

Farlam, P., (2005). Working Together - Assessing Public-Private Partnerships in Africa.

NEPAD Policy Focus Series. Pretoria: The South African Institute of International Affairs (SAIIA).

Ghauri, P., and Gronhang, K., (2002). Research Methods in Business Studies.2nd Edition. New Jersey: Prentice Hall.

Grimsey, D., (2004). The Governance of Contractual Relationships in Public-Private Partnerships. Sheffield: GreenLeaf Publishing.

Grimsey, D., and Lewis, M.K., (2002). Evaluating the Risks of Public Private Partnerships for Infrastructure Projects. International Journal of Project Management Vol. 20, pp. 107 – 118.

Hall, D., (2009). A Crisis for Public-Private Partnerships (PPPs). London: Public Services International Research Unit (PSIRU).

134

Hanna, B., Paris, M., and Wan, B., (2010). Combating HIV/AIDS through Public-Private Partnerships (PPP). Unpublished MSc Thesis. Massachusetts: Worcester Polytechnic Institute.

Hartley, K., and Parker, D., (2002). Transaction Costs, Relational Contracting and Public-Private Partnerships: A Case Study of UK Defence. Journal of Purchasing and Supply Management, Vol. 9, pp. 97 – 108.

Heyns, P., (2004). Water Institutional Reforms in Namibia. Windhoek.

Husab Uranium Namibia Project. [Online]. Available at:

http://www.extractresources.com/our-business/husab-uranium-project.html. [Accessed:

14/10/2011].

Ismail, Takim and Nawawi, (2011). The Evaluation Criteria of Value for Money (VFM) of Public Private Partnership (PPP) Bids. Malaysia: Universiti Teknologi MARA (UiTM).

Khawaji, A.D., Kutubkhanah, I.K., and Wie, J., (2008). Advances in Seawater Desalination Technologies. Desalination, Vol. 221, pp. 47 – 69.

Kluge, T., Liehr, S., Lux, A., Moser, P., Nieman, S., Umlant, N., and Urban, W., (2008).

IWRN Concept for the Cuvelai Basin in Northern Namibia. Physics and Chemistry of the Earth, Vo. 33, No. 1 – 2, pp. 48 – 55.

KPMG, (2009). Financing Australian PPP Projects in the Global Financial Crisis.

Australia: KPMG.

Kyereh, K.T., and Hoffman, D.J., (2008). The Impact of HIV / AIDS on Skills Availability in South African Coal Mines. 5th Post Graduate Conference on Construction Industry Development, 16 – 18 March 2008, Bloemfontein.

135

Langer Heinrich Uranium, (2010). Annual Review. Windhoek, Namibia: LHU Mine.

Legal Assistance Centre [LAC], (2009). Not Coming Up Dry: Regulating the Use of Namibia‟s Scarce Water Resources by Mining Operations. Windhoek: LAC.

Leedy, P.D., and Ormrod, J.E., (2010). Practical Research: Planning and Design. 9th Edition. New Jersey: Merrill Prentice Hall.

MacGregor, J., Masirembu, S., Williams, R., and Munikasu, C., (2000). Estimating the Economic Value of Water in Namibia. 1st WARFSA/Waternet Symposium: Sustainable Use of Water Resources; Maputo. Windhoek.

Mining Journal, (2010). Namibia Uranium Focus. [Online]. Available at:

http://www.miningjournal.com/__data/assets/supplement_file_attachment/0003/207642/Namibia_scr.pdf

[Accessed: 12/09/2011].

Ministry of Mines and Energy [MME], (2010). Strategic Environmental Assessment for the Central Namib Uranium Rush. Windhoek: MME.

Ministry of Trade and Industry [MTI], (2010). Namibia Policy and Framework for PPP‟s in Namibia – Pre Policy Review. Windhoek: MTI.

NamWater, (2011a). Application for a Permit to Abstract Water from the Omdel Aquifer in the Central Namib Area. Windhoek: NamWater.

NamWater, (2011b). Coastal Water Supply Strategies. Windhoek: NamWater.

NamWater, (2010). Annual Report. Windhoek: NamWater

NamWater, (2009). Minutes of Workshop on Strategies for Coastal Bulk Water Supply.

Safari Court and Hotel, Windhoek. Meeting held on 24 September 2009.

136

NamWater, (2007). Submission to the NamWater Board on the Establishment of a Seawater Desalination Water Supply Scheme for NamWater‟s Current and Prospective New Uranium Mining Clients. Windhoek: NamWater.

NamWater, (2003). Pre-Feasibility Study on Bulk Water Supply to Mile 108. Windhoek:

NamWater.

Marenica Energy Limited, (2010). Annual Report. West Perth: Australia.

National Treasury, (2007). Introducing Public-Private Partnerships in South Africa.

Pretoria: PPP Unit.

National Planning Commission, (2011). Targeted Intervention Programme for Employment and Economic Growth (TIPEEG). Windhoek: National Planning Commission.

National Council for Public-Private Partnerships [NCPPP], (2011). How PPP‟s Work.

[Online]. Available: http://www.ncppp.org/howpart/index.shtml#keys. [Accessed on:

17/11/2011]

Ndokosho, J., Hoko, J., and Makuria, H., (2007). Assessment of Management Approaches in a Public Water Utility: A Case Study on Namibia Water Corporation (NamWater). Physics and Chemistry of the Earth, Vol. 32, pp. 1300 – 1309.

Nyagwachi, J.N., (2008). South African Public Private Partnership (PPP) Projects. PhD Thesis. Port Elizabeth: Nelson Mandela Metropolitan University.

Osborne, P., (2000). Public-Private Partnerships Theory and Practice in International Perspective. London: Routledge.

137

Okolie, K.C., (2011). Performance Evaluation of Building in Education Institutions: A Case of Universities in South-East Nigeria. Unpublished PhD thesis. Port Elizabeth:

Nelson Mandela Metropolitan University.

Oluoch and Wainana, (2010). Effectiveness of Public Private Partnerships in Infrastructure Financing. Kenya: University of Nairobi

Ossowski, R., (2007). Budgeting for Public-Private Partnerships: Symposium on Evaluating Innovative Approaches to Public Service Delivery. Madrid: OECD.

Palmer, K., (2000). Contract Issues and Financing in PPP / PFI (Do We Need the „F‟ in

„DBFO‟ Projects?). UK: Cambridge Economic Policy Associates Ltd.

Podges, J.W., (2009). The Current State of Black Female Empowerment in the Construction Industry Measured Against Broad-Based Black Economic Empowerment Scorecard. Unpublished MBA Thesis. Port Elizabeth: NMMU Business School.

Phiri, M.A., (2010). An Evaluation of the Impact of Construction, Economic Status and Political Influence on the Malawian Construction Industry. MSc Treatise. Port Elizabeth:

Nelson Mandela Metropolitan University.

Prashant, P.P., (2010). Namibia: Policy and Institutional Framework for PPP Inception Presentation Concept and Option. New Delhi: CRISIL Infrastructure Advisory.

PriceWaterHouseCoopers, (2005). Delivering the PPP Promise: A Review of PPP Issues and Activity. [Online]. http://www.pwc.com/gx/en/government-infrastructure/pdf/promisereport.pdf. Accessed: 13.12.2011.

PPP Web Tokyo Conference 2007. [Online]. Accessed; 14.12.2011.

http://www8.cao.go.jp/pfi/ppp_discussion/theme3.html

138

Quiggin, J., (2004). Risk, PPP‟s and the Public Sector Comparator. Australian Accounting Review, Vol. 14, No. 2, pp. 51 – 61.

Republic of Namibia, (1990). The Constitution of the Republic of Namibia. Windhoek.

Republic of Namibia, (1997). Namibia Water Corporation Act (Act 12 of 1997).

Windhoek.

Republic of Namibia, (2008). Water Supply and Sanitation Policy. Windhoek.

Republic of Namibia, (1992). Minerals (Prospecting and Mining) Act (33 of 1992).

Windhoek.

Republic of Namibia, (2007). The Environmental Management Act (7 of 2007).

Windhoek.

Republic of Namibia, (2001). Environmental Investment Fund of Namibia Act (13 of 2001). Windhoek.

Republic of Namibia, (2004).Water Resources Management Act (24 of 2004).

Windhoek.

Royal Institute of Chartered Surveyors [RICS], (2011). Public-Private Partnership: An Essential Tool for Meeting Global Infrastructure Needs. London: RICS.

Royal Institute of Chartered Surveyor [RICS], (2007). The Construction and Building Research Conference of the Royal Institution of Chartered Surveyors. USA: Georgia Tech.

Rio Tinto Rossing Uranium, (2011). Rio Tinto Rössing Uranium Mine. [Online]. Available from: http://www.riotinto.com. [Accessed 13/04/2011].

139

Rössing Uranium, (2011). Rössing Uranium Mine, Namibia. [Online]. Available:

http://www.riotinto.com. [Accessed 15/04/2011]

Rössing Uranium, (2011). 2010 Rössing Uranium: Stakeholders Report. Windhoek.

Roux and Barry, (2009). Paradigms and Cadastral Research. Alberta: University of Calgary.

Ryan, A.V, (2004). A Structured Approach to Water Supply Selection. BE Thesis.

Sydney: University of New South Wales.

SoftChem, (2011). Environmental Impact Assessment Report and Draft Environment Management Plan for the INCA Project. Reptile Uranium Namibia (Pty) Ltd, Namibia.

South Africa, (1956). Water Act (54 of 1956). Namibia: Windhoek.

Spackman, M., (2003). Public-Private Partnerships: Lessons from the British Approach.

Economic Systems, Vol. 26, pp. 283 – 301.

United Nations, (2011a). Public-Private Partnerships – A Financier‟s Perspective.

Transport and Tourism Division: UN ESCAP.

United Nations, (2011b). A Guidebook on Public-Private Partnership in Infrastructure.

Bangkok: Economic and Social Commission for Asia and the Pacific (ESCAP).

United Nations, (2008). Guidebook on Promoting Good Governance in Public-Private Partnerships. Geneva: United Nations.

United Nations for Economic and Social Council, [UNESC], (2005). Public-Private Partnership for Service Delivery: Water and Sanitation. Addis Ababa: UNESC.

140

Takei, K., (2011). The Dynamics of Policy Implementation and Public-Private Partnerships (PPP) – Case of Namibia. Knowledge and Human Development Sector, the World Bank Institute.

The United Republic of Tanzania, (2009). National Public Private Partnership (PPP) Policy. Prime Minister‟s Office, Dar Es Salaam.

Thwala, W.D., and Monese, L.N., (2008). Motivation as a Tool Improve Productivity in the Construction Site. 5th Post Graduate Conference on Construction Industry Development, 16 – 18 March 2008, Bloemfontein.

Tsiourtis, N.X., (2008). Criteria and Procedure for Selecting a Site for a Desalination Plant. Desalination, Vol. 221, pp. 125 – 144.

Yescombe, E.R., (2007). Understanding the Nature of PPPs. London: Yescombe Consulting Ltd.

Yin R.K., (2003). Case Study Research, Design and Methods. 3rd ed. London: Sage Publications.

Valencia Uranium, (2010). Forsys Corporate Presentation. [Online]. Available:

http://forsysmetals.com/9C288967-1370-4A4C-8FDE-DD19B947DCB1/FinalDownload/DownloadId89D31FDEFF1FFB6A0ECE85C9405867E 5/9C288967-1370-4A4C-8FDE-DD19B947DCB1/wp-content/uploads/2011/09/Forsys-Corporate-Presentation-September-11-Presentation_final.pdf. [Accessed: 13/10/2011].

Valencia Uranium, (2008). Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) for the Valencia Uranium Project. Randburg: Digby Wells &

Associates. Available: (http://www.forsysmetals.com/valencia.htm). [Accessed 11/11/2011]

141

Van der Merwe, B., and McCormick, M., (1999). Development of the National Strategy for Water Demand Management.Final Report to the Namibia Resources Management Review. Windhoek, Namibia: Environmental Engineering Services.

Vezile, C.,A., (2010). Performance Management at Transnet National Ports Authority Port Elizabeth: The Role of Human Resources. MBA Thesis. Port Elizabeth: Nelson Mandela Metropolitan University.

Walvis Bay Corridor Group [WBCG], (2011). [Online]. Available (http://www.wbcg.com.na/uploads/media/Information_Leaflet_01.pdf).

[Accessed10/07/2011]

Zhang, X., (2005). Critical Success Factors for Public-Private Partnerships in Infrastructure Development.Journal of Construction Engineering and Management, Vol.

131, No. 1.

142

Annexure A: The location of the study Area (Central Coastal Namibia) in relation to Namibia

143

APPLICABILITY OF PUBLIC-PRIVATE PARTNERSHIP IN PROVISION OF WATER INFRASTRUCTURE TO CENTRAL COASTAL NAMIBIAN MINES

Dear ……….

SUBJECT: INTRODUCTION AND REQUEST TO COMPLETE QUESTIONNAIRE

I am an MSc Built Environment: Project Management candidate at the Department of Construction Management, Faculty of Engineering, the Built Environment and Information Technology, Nelson Mandela Metropolitan University, conducting research relating to the implementation of Public-Private Partnerships (PPP‟s) in water demand and supply in Central Coastal Namibian mines.

The objective of the study is to investigate and analyse the water demand and supply as well as the applicability of PPP‟s in water supply infrastructure projects by exploring its benefits, success, risks, challenges and most suitable model with reference to the central coastal Namibian existing operational and planned mines. The outcome of the study will be used to recommend the most cost effective long term option for water supply to the mines in the study area.

You are invited to participate in this study by completing the attached questionnaire. The questionnaire will also be given to approximately 30 key stakeholders from public and private sector.

Your participation in this study is voluntary. It should take approximately 25 minutes to complete the questionnaire. Your responses to the survey will remain confidential and will only be used for academic purposes. Data from this research will be reported in an aggregate format. You will be notified of the findings of the survey through email.

Please return a completed (hard copy or electronic) questionnaire to Lukas Kavela on or before 20thSeptember 2011 by postal, fax or email at the following addresses:

Mr. Lukas Kavela PO Box 5867

Ausspannplatz, Windhoek Namibia

Fax +264 61 71 3801 (w)

Email: [email protected] or [email protected] or [email protected].

If you have questions at any time about the survey or procedures, please contact me at: +264 61 71 2020 (w) or +264 81 128 9178 (mobile), or my email: [email protected] or [email protected].

Thank you very much for your support!

• PO Box 77000 • Nelson Mandela Metropolitan University

• Port Elizabeth • 6031 • South Africa • www.nmmu.ac.za

144

Annexure C: Research Questionnaire

SUMMERSTRAND NORTH DEPARTMENT OF CONSTRUCTION MANAGEMENT Tel. +27 (0)41 504 2394 Fax. +27 (0)41 504 2345

Ref./No.:

APPLICABILITY OF PUBLIC-PRIVATE PARTNERSHIP IN PROVISION OF WATER INFRASTRUCTURE TO CENTRAL COASTAL NAMIBIAN MINES

SECTION I: PERSONAL AND ORGANISATION INFORMATION

Please make a cross (X) in the applicable numbered block in each question below, or fill in information in the open blocks as required.

1.1 Please indicate your age group

1.1.1 Under 25 1

1.1.2 25 – 34 2

1.1.3 35 – 44 3

1.1.4 45 – 54 4

1.1.5 55 – 64 5

1.1.6 Over 65 6

1.2 Please indicate your gender

1.2.1 Male 1

1.2.2 Female 2

1.3 What is your highest qualification?

1.3.1 Grade 12 1

1.3.2 Diploma 2

1.3.3 Bachelor‟s Degree 3

1.3.4 Honours Degree 4

1.3.5 Master‟s Degree 5

1.3.6 Doctorate Degree 6

1.3.7 Others (specify) 7

1.4 Please indicate in what sector do your work

1.4.1 Public 1

1.4.2 Private 2

1.4.3 Other (specify) 3

• PO Box 77000 • Nelson Mandela Metropolitan University

• Port Elizabeth • 6031 • South Africa • www.nmmu.ac.za

145 1.5 What is your position in the organisation?

1.5.1 Managing Director / Executive Director / Managing Partner 1

1.5.2 Director / Senior Executive 2

1.5.3 Senior Manager (Business Unit / Functional Manager) 3

1.5.4 First Level Manager (Supervisor / Foreman) 4

1.5.5 Water and/or Mining Expert / Specialist / Consultant 6

1.5.6 Other (specify) 7

SECTION II: WATER SUPPLY

Please indicate with a cross (X) in the applicable numbered block in each question below.

2.1 Namibia has adequate water sources to cater for growing water demand for the mines?

2.1.1 Yes 1

2.1.2 No 2

2.2 Is the escalation of water cost associated with planned desalination facility justifiable?

2.2.1 Yes 1

2.2.2 No 2

2.3 Is the planned development of desalination facility in the central coastal Namibia justifiable?

2.3.1 Yes 1

2.3.2 No 2

2.4 Additional water supply capacity for the mines in the central coastal Namibia.

Use the scale 1 (strongly disagree) to 5 (strongly agree), and put a cross (X) on the applicable numbered block to indicate the extent to which you agree or disagree about each of the following statements regarding additional water capacity in the central coastal Namibia.

Use the scale 1 (strongly disagree) to 5 (strongly agree) and put a cross (X) on the applicable numbered block to indicate the extent to which you agree or disagree about each of the following statements regarding PPP projects in the built environment. as well as drive the regional and national economic development.

1 2 3 4 5

SECTION III: PUBLIC PRIVATE PARTNERSHIP (PPP)

146

3.1.2 PPP brings forward investment and/or ensures that optimal maintenance

strategies are followed. 1 2 3 4 5

Considering the financial constraints and managerial limitations of governments, part of the water resources development and management activities may be shared under PPP model.

1 2 3 4 5

3.2 PPP associated benefits 1 2 3 4 5

3.2.1 Value-for money 1 2 3 4 5

3.2.2 Potential for delivery, particularly suitable for large scale projects 1 2 3 4 5 3.2.3 Gains from innovation, due to the creativity of the private sector 1 2 3 4 5

Successful PPP‟s require existence of an adequate risk management system for appropriate transfer of risks to the party best suited to manage it at least cost.

1 2 3 4 5 3.3.2 PPP procurement brings forward investment and/or ensures that optimal

maintenance strategies are followed. 1 2 3 4 5

3.3.3 PPP model must show the type of risks involved in PPP‟s transactions. 1 2 3 4 5 3.3.4 It is important that risks be transferred to a party or partner that could best

bear it without jeopardizing economic growth opportunities. 1 2 3 4 5 3.3.5 There is evidence of contractors or customers seeking to shift risk onto the 3.4.4 Project management, poorly applied, can create new management processes

that do not add enough value to offset their cost. 1 2 3 4 5 3.4.5 Project management can require new skills that may be difficult for some

managers to adopt. 1 2 3 4 5

147

3.5 What do you think is the most preferred PPP model in water supply infrastructure development?

Use the scale 1 (strongly disagree) to 5 (strongly agree) and put a cross (X) on the applicable numbered block to indicate the extent to which you agree or disagree about each of the following statements regarding the most preferred PPP model in the water supply infrastructure development.

SCALE:

3.5.5 Built Own Operate (BOO) / Built Operate Transfer (BOT) / Built Operate Own

Transfer (BOOT)/ Design Built Finance Operate (DBFO) 1 2 3 4 5

5.1 What is your organisation annual budgetary allocation with regards to water supply infrastructure development and management to the mines?

Use the scale 1 to 5, and put a cross (X) on the applicable numbered block to indicate the extent to which your institution budget allocation requirement per listed item.

Please indicate with a cross (X) in all applicable numbered blocks in each question below.

6.1 Do you think your company should participate in PPP‟s projects for water supply?

6.1.1 Yes 1

6.1.2 No 2

SECTION IV: COST IMPLICATIONS

Budget allocation 1 2 3 4 5

5.1.1 New water supply infrastructure development and extension 1 2 3 4 5 5.1.2 Operating and maintaining of the existing water supply infrastructure 1 2 3 4 5

5.1.3 Other (specify) 1 2 3 4 5

SECTION V: HUMAN AND INSTITUTIONAL CAPACITY DEVELOPMENT

148

6.2 Are there any additional personnel skills in your organisation to make PPP a success?

6.2.1 Yes 1

6.2.2 No 2

6.3 Does skill shortage can hinder the development of water supply infrastructure to the mines?

6.3.1 Yes 1

6.3.2 No 2

6.4 What are the incentives required (1 being strongly not preferred or 5 being strongly preferred) to retain personnel to contribute to the water supply infrastructure planning and development to the mines in the central coastal

Although the data you have provided in this questionnaire will be treated in the strictest confidence, it would be appreciated if you would record your details below to facilitate contacting you, in the event a query should arrive.

ORGANISATION : __________________________

ADDRESS : __________________________

CONTACT PERSON : __________________________

__________________________

__________________________

__________________________

TEL : __________________________

MOBILE : __________________________

EMAIL : __________________________

DATE : __________________________

THANK YOU FOR YOUR CONTRIBUTION TO THIS RESEARCH STUDY ON THE APPLICABILITY OF PUBLIC-PRIVATE PARTNERSHIP IN PROVISION OF WATER INFRASTRUCTURE TO CENTRAL

COASTAL NAMIBIAN MINES

149

Annexure D: Remainder Cover Letter

SUMMERSTRAND NORTH DEPARTMENT OF CONSTRUCTION MANAGEMENT Tel. +27 (0)41 504 2394 Fax. +27 (0)41 504 2345 17 October 2011

Dear ………..

REMINDER: APPLICABILITY OF PUBLIC-PRIVATE PARTNERSHIP IN PROVISION OF WATER INFRASTRUCTURE TO CENTRAL COASTAL NAMIBIAN MINES

A questionnaire herewith attached was sent to you by email a few weeks ago. Up to date I have not received your completed questionnaire.

If the questionnaire has been completed and returned before the receipt of this friendly reminder, accept my appreciation and please ignore the rest of the letter. I acknowledge the fact that your time is very limited, but would appreciate if you could complete the questionnaire and return it at your earliest convenience.

In the case of non-receipt or misplacement of the questionnaire pertaining to the research above, please contact me for the necessary arrangements – without your input, this research study will not be successful.

Please return completed (hard copy or electronic) questionnaire to Mr Lukas Kavela on or before the 30th October 2011 by postal, fax or email at the following addresses:

Please return completed (hard copy or electronic) questionnaire to Mr Lukas Kavela on or before the 30th October 2011 by postal, fax or email at the following addresses:

Related documents