This analysis examined uncertainty in nitrate load estimation introduced in the measurement and load calculation processes. A standard error propagation method was used to integrate uncertainty from a variety of sources to quantify the cumulative effect. Numerical simulation was used to qualify the uncertainty in load calculation process. The estimated cumulative measurement uncertainty ranged from 11.7 to 12.4%, and load calculation uncertainty for a 30-day frequency ranged from 7% expressed as CV for the largest watershed to 32% for the smallest.

Further study could examine include not only the load estimation algorithms used here (measured days – flow-weighted concentration and all days – concentration interpolated ) but also LOADEST which is more appropriate for parameters other than nitrate.

2.7 References

Aulenbach, B. T., and R. P. Hoopert. 2006. The composite method: an improved method for stream-water solute load estimation. Hydrological Processes, 20(14): 3029-3047.

Baker, D. B., R. P. Richards, T. T. Loftus, and J. W. Kramer. 2004. A new flashiness index: Characteristics and applications to Midwestern rivers and streams. Journal of the American Water Resources Association, 40(2): 503-522.

Baker, D.B. 1985. Regional water quality impacts of intensive row- crop agriculture: A Lake Erie Basin case study. Journal of Soil Water Conservation, 40(1): 125-132. Baker, D.B. and R.P. Richards. 2000. Effects of watershed scale on agrochemical concentration patterns in Midwestern streams. In: Agrochemical Fate and Movement: Perspective and Scale of Study, T.R. Steinheimer, L.J. Ross, and T.D. Spittler

(Editors). ACS Symposium Series 751, American Chemical Society, Washington, D.C., 46-64.

Baker, David B. 1988. Sediment, nutrient and pesticide transport in selected lower Great Lakes tributaries. EPA-905/488-001, U.S. EPA, Great Lakes National Program Office: Chicago, IL.

Beale, E. M. L.1962. Some uses of computers in operational research. Industrielle Organization 31, 27-28.

Bevington, P. R., and Robinson, D. K. 2002. Data Reduction and Error Analysis for the Physical Sciences (3rd ed.), McGraw-Hill: ISBN 0-07-119926-8, New York. Birgand, F., C. Faucheux, G. Gruau, B. Augeard, F. Moatar, and P. Bordenave. 2010. Uncertainties in assessing annual nitrate loads and concentration indicators: Part 1. Impact of sampling frequency and load estimation algorithms. Transactions of the ASABE, 53(2): 437-446.

Birgand, F., T. W. Appelboom, G. M. Chescheir, and R. W. Skaggs. 2011a. Estimating nitrogen, phosphorus, and carbon fluxes in forested and mixed-use

watersheds of the lower coastal plain of North Carolina: Uncertainties associated with infrequent sampling. Transactions of the ASABE, 54(6): 2099-2110.

Birgand, F., C. Faucheux, G. Gruau, F. Moatar, and M. Meybeck. 2011b.

Uncertainties in assessing annual nitrate loads and concentration indicators: Part 2. Deriving sampling frequency charts in Brittany, France. Transactions of the ASABE, 54(1): 93-104.

Boning, C. W. 1992. Policy Statement on Stage Accuracy. Technical Memorandum No. 93-07. Washington, D.C.: USGS, Office of Water.

Cochran, W. G. 1977. Sampling Techniques. 3rd edition. Wiley, New York.

Cuadra, P. E., and Vidon, P.. 2011. Storm nitrogen dynamics in tile-drain flow in the US Midwest. Biogeochemistry, 104(1-3): 293-308.

Di Baldassarre, G., and A. Montanari. 2009. Uncertainty in river discharge

observations: a quantitative analysis. Hydrology and Earth System Sciences, 13(6): 913-921.

Dolan, D. M., A. K. Yui, and R. D. Geist. 1981. Evaluation of river load estimation methods for total phosphorus. Journal of Great Lakes Research, 7(3): 207-214. Ferguson, R. I.. 1986. River loads underestimated by rating curves. Water Resources Research, 22(1): 74-76.

Ging, P. 1999. Water-quality assessment of south-central Texas: Comparison of water quality in surface-water samples collected manually and by automated samplers. USGS Fact Sheet FS-172-99. Washington, D.C., USGS.

Greenberg, Arnold E., Clesceri, Lenore S., Eaton, Andrew D. 1998 Standard methods for the examination of water and wastewater., American Public Health Association, American Water Works Association and Water Environment Federation (Eds.), 18th Edition. ISBN-13: 978-0875532073

Guo, Y., Markus, M., Demissie, M., 2002. Uncertainty of nitrate-N load computations for agricultural watersheds. Water Resour.Res. 38(10), 1185 doi: 10.1029/2001WR001149.

Hallock, D.. 2006. River and Stream Water Quality Monitoring Report for Water Year 2005. Washington State Department of Ecology, Olympia, WA. 18 pages +

appendices. Publication No. 06-03-032. www.ecy.wa.gov/biblio/0603032.html

Hallock, D.. 2012. Addendum to Quality Assurance Monitoring Plan: Stream Ambient Water Quality Monitoring: Correction of Responsibilities and Addition of

Analytes. Washington State Department of Ecology, Olympia, WA. 11 pages.

Publication No. 03-03-200ADD#2. www.ecy.wa.gov/biblio/0303200Addendum2.html. Harmel, R. D., D. R. Smith, K. W. King, and R. M. Slade. 2009. Estimating storm discharge and water quality data uncertainty: A software tool for monitoring and modeling applications. Environmental Modeling and Software, 24(7): 832-842. Harmel, R. D., R. J. Cooper, R. M. Slade, R. L. Haney, and J. G. Arnold. 2006. Cumulative uncertainty in measured streamflow and water quality data for small watersheds. Transactions of the ASABE, 49(3): 689-701.

Herschy, R.. 1995. General purpose flow measurement equations for flumes and thin plate weir. Flow Measurement and Instrumentation, 6(4): 283-293.

JCGM, 2008. Evaluation of measurement data-Guide to the expression of uncertainty in measurement. International Organization for Standardization (ISO), Online: http://www. bipm.org/en/publications/guides/gum.html

Kotlash, A. R., and B. C. Chessman. 1998. Effects of water sample preservation and storage on nitrogen and phosphorus determinations: Implications for the use of automated sampling equipment. Water Research, 32(12): 3731-3737.

Kronvang, B., and A. J. Bruhn. 1996. Choice of sampling strategy and estimation method for calculating nitrogen and phosphorus transport in small lowland streams. Hydrological Processes, 10(11): 1483-1501

Lennartz, B., Tiemeyer, B., de Rooij, G., and Doležal, F. (2010). Artificially Drained Catchments—From Monitoring Studies towards Management Approaches. Vadose Zone Journal, 9(1): 1-3.

Lincoln, T.A., D.A., Horan-Ross, M.R., McHale, and G.B., Lawrence. 2009. Quality- assurance data for routine water analyses by the U.S. Geological Survey laboratory in Troy, New York—July 2001 through June 2003: U. S. Geological Survey Open-File

Report 2009–1232, 32 p., available only at http://pubs.usgs.gov/of/2009 /1232.

Martin, G. R., J. L. Smoot, and K. D. White. 1992. A comparison of surface-grab and cross sectionally integrated stream-water-quality sampling methods. Water

Environment Research, 64(7): 866-876.

Mathieu, N., 2006. Replicate Precision for 12 TMDL Studies and Recommendations for Precision Measurement Quality Objectives for Water Quality Parameters.

Washington State Department of Ecology, Olympia, WA. 15 pages. Publication No.

Moatar F., M. Meybeck, S. Raymond, F. Birgand, and F. Curie. River flux

uncertainties by hydrological variability and riverine material behavior. Hydrological

Processes, 2012. http://dx.doi.org/10.1002/hyp.9464.

Moatar, F., and M. Meybeck. 2005. Compared performances of different algorithms for estimating annual nutrient loads discharged by the eutrophic River Loire.

Hydrological Processes, 19(2): 429-444.

Moatar, F., and M. Meybeck. 2007. Riverine fluxes of pollutants: Towards

predictions of uncertainties by flux duration indicators. Comptes Rendus Geoscience, 339(6): 367-382.

Montanari, A., C. A. Shoemaker, and N. van de Giesen. 2009. Introduction to special section on Uncertainty Assessment in Surface and Subsurface Hydrology: An

overview of issues and challenges, Water Resour. Res., 45, W00B00, doi:10.1029/2009WR008471.

Montanari, A.. 2007. What do we mean by 'uncertainty"? The need for a consistent wording about uncertainty assessment in hydrology. Hydrological Processes, 21(6): 841-845.

Pelletier, P. M.. 1988. Uncertainties in the single determination of river discharge - a literature-review. Canadian Journal of Civil Engineering, 15(5): 834-850.

Preston, S. D., V. J. Bierman, and S. E. Silliman. 1989. An evaluation of methods for the estimation of tributary mass loads. Water Resources Research, 25(6): 1379-1389. Richards, R. P., and J. Holloway. 1987. Monte-Carlo studies of sampling strategies for estimating tributary loads. Water Resources Research, 23(10): 1939-1948.

Richards, R. P., I. Alameddine, J. A. David, D. B. Baker, N.S. Bosch, R. Confesor, J. V. DePinto, D. M. Dolan, J. M. Reutter, and D. Scavia. 2013. “Nutrient Inputs to the Laurentian Great Lakes by Source and Watershed Estimated Using SPARROW Watershed Models” by Dale M. Robertson and David A. Saad. Journal of the American Water Resources Association, 49: 715–724. doi: 10.1111/jawr.12006 Rode, M., and U. Suhr. 2007. Uncertainties in selected river water quality data. Hydrology and Earth System Sciences, 11(2): 863-874.

Sauer, V. B., and R. W. Meyer. 1992. Determination of error in individual discharge measurements. USGS Open File Report 92-144. Washington, D.C.: USGS.

Schwarz, G.E., A.B. Hoos, R.B. Alexander, and R.A. Smith, 2006. The SPARROW Surface Water-Quality Model—Theory, Applications and User Documentation. U.S. Geological Survey, Techniques and Methods 6-B3.

http://pubs.usgs.gov/tm/2006/tm6b3, accessed October 15, 2012.

Standard methods for the examination of water and wastewater, 1998. American Public Health Association, American Water Works Association and Water Environment Federation, 20th Edition.

Stenback, G. A., W. G. Crumpton, K. E. Schilling, and M. J. Helmers. 2011. Rating curve estimation of nutrient loads in Iowa rivers. Journal of Hydrology, 396(1-2): 158-169.

Strobl, R. and R. Robillard, 2008. Network Design for Water Quality Monitoring of Surface Freshwaters: A Review. Journal of Environmental Management 87:639-648. Taylor, J. R. 1997 An Introduction to Error Analysis, 2nd Ed., University Science Books, Sausalit, USA. ISBN-13: 9780935702750.

Ullrich, A., and M. Volk. 2010. Influence of different nitrate-N monitoring strategies on load estimation as a base for model calibration and evaluation. Environmental Monitoring and Assessment, 171(1-4): 513-527.

USEPA, 2002. Supplemental Guidelines for the Award of Section 319 Nonpoint Source Grants to States and Territories in FY 2002 and Subsequent Years. Online at http://www.epa.gov/owow/NPS/Section319/fy2002.html. (Accessed September 2012) USEPA, 2012. Overview of Impaired Waters and Total Maximum Daily Loads

Program website. http://water.epa.gov/lawsregs/lawsguidance/cwa/tmdl/intro.cfm.

(Accessed September 2012).

USGS, 2004. Load Estimator (LOADEST): A Fortran Program for Estimating

Constituent Loads in Streams and Rivers. Techniques and Models Book 4, Chapter 5. US Geological Survey, Reston, VA

USGS, 2009a. USGS Open-File Report 2007-1080. Streamflow and Nutrient Fluxes of the Mississippi–Atchafalaya River Basin and Subbasins for the Period of Record Through 2005, Methods Used to Estimate Nutrient Fluxes,

http://toxics.usgs.gov/pubs/of-2007-1080/methods.html.

USGS, 2009b. Application of Spatially Referenced Regression Modeling for the Evaluation of Total Nitrogen Loading in the Chesapeake Bay Watershed,

Vidon, P., L. E., Hubbard, and E., Soyeux. 2009. Impact of sampling strategy on stream load estimates in till landscape of the Midwest. Environmental monitoring and assessment, 159(1-4): 367-379.

Walker, W. W.. 1986. Empirical Methods for Predicting Eutrophication in

Impoundments; Report 3, Phase III: Applications Manual. Technical Report E-81-9, U.S. Army Engineer Waterways Experiment Station, Vicksburg, MS.

Walker, W. W.. 1996. Simplified procedures for eutrophication assessment and prediction: User manual, Instruct. Rep. W-96-2, U.S. Army Corps of Eng., Waterways Exp. tn.,Vicksburg, Miss.

Water Quality Laboratory, Heidelberg College. 2005. Program Description; Sampling Stations and Methods.

http://www.heidelberg.edu/academiclife/distinctive/ncwqr/data/guide. Accessed September, 2012.

Webb, B.W., Phillips, J.M., Walling, D.E., Littlewood, I.G., Watts, C.D., Leeks, G.J.L., 1997. Load estimation methodologies for British rivers and their relevance to the LOIS RACS(R) programme. Science of the Total Environment 194/195, 379–389. Westerberg, I., J. L. Guerrero, J. Seibert, K. J. Beven, and S. Halldin. 2011. Stage- discharge uncertainty derived with a non-stationary rating curve in the Choluteca River, Honduras. Hydrological Processes, 25(4): 603-613.

Wikipedia contributors, Root-mean-square deviation, Wikipedia, The Free Encyclopedia, http://en.wikipedia.org/w/index.php?title=Root-mean- square_deviation&oldid=553011473. Accessed May 6, 2013.

Zamyadi, A., J. Gallichand, M. Duchemin. 2007. Comparison of methods for

estimating sediment and nitrogen loads from a small agricultural watershed. Canadian Biosystems Engineering, 49(1): 127–136.

CHAPTER 3. THE EFFECT OF WATERSHED CHARACTERISTICS ON

Related documents