CONFLICTS AND DEVIATIONS

In document SAES-A-202 (Page 37-42)

FORMS, SEED FILES AND BORDERS TABLE PRODUCT

2. CONFLICTS AND DEVIATIONS

Any conflicts between this appendix and other applicable Saudi Aramco Engineering Standards (SAESs), Procedures (SAEPs), Materials System Specifications (SAMSSs) and Standard Drawings (SASDs) shall be resolved in writing with EK&RD.

3. REFERENCES

Refer to applicable Saudi Aramco Engineering Standards (SAESs), Procedures (SAEPs), Materials System Specifications (SAMSSs) and Standard Drawings (SASDs).

4. SCOPE

4.1 General

4.1.1 The contractor shall follow this appendix as the basis for

preparing Intelligent P&IDs using the SmartPlant P&ID (SPPID) application. Included in this appendix are the software version requirements, guidelines for SPPID set up, list of deliverables, the minimum data to be populated in the SPPID database and the requirements for SPPID Project delivery to EK&RD.

4.1.2 EK&RD will provide to the contractor SmartPlant P&ID

Template comprising Reference Data and Data Dictionary template, which shall be used for the SPPID set-up and P&ID creation. It is presumed that the SmartPlant P&ID Template provided is not comprehensive enough for any specific project and modifications and additions to this will be required in order to meet project requirements.

4.1.3 Use of the SmartPlant P&ID Template does not release the engineering contractor from the responsibility of submitting SmartPlant P&ID deliverables meeting COMPANY

4.1.4 All changes and/or additions to the Reference Data and Data Dictionary must be documented and submitted to EK&RD for approval, prior to use.

4.1.5 The document with descriptive list of changes and additions as mentioned above, with EK&RD approval shall be included as part of deliverables, which are defined later in this appendix. 4.1.5 The Smart Plant P&IDs shall be submitted to Saudi Aramco as

per section 15.12 of SAEP-334.

4.1.6 The final SPPID data delivered to Saudi Aramco shall have the SPPID data in „as-built‟ stage.

4.1.7 The contractor shall upgrade the SPPID database to conform to the latest version of SmartPlant P&ID approved for use by

EK&RD, prior to final delivery of the SmartPlant P&ID data

back up.

4.1.8 The CONTRACTOR shall provide to EK&RD the SmartPlant P&ID project data as well as supporting documentation. 4.2 Reference Data & Data Dictionary customizations

4.2.1 The Reference Data within the SmartPlant P&ID Template consists of:

 Approved Symbols

 COMPANY approved P&ID Borders

 Rule File

 Format File

 Insulation Specification File

4.2.2 The Data Dictionary template within the SmartPlant P&ID Template consists of:

 Data Attributes (SPPID Properties)

 Select Lists

4.2.3 It is COMPANY direction to use delivered ANSI/ISA standard Reference Data to the maximum extent possible for P&ID production. Additional symbols shall be defined by the CONTRACTOR as required, but must be approved by the COMPANY prior to use on the project.

4.2.4 Any additional attributes, select lists and select list entries, which do not exist in the Data Dictionary and are required by the project, shall be created by the CONTRACTOR and get them approved by the EK&RD prior to use.

4.2.5 Forms, templates, rules and insulation specs customization shall be done by the CONTRACTOR as required with prior approval from EK&RD.

4.2.6 Additional forms and documents created by the CONTRACTOR shall adhere to the requirements specified in this standard and must be approved by EK&RD prior to use in the project. 4.3 Quality Assurance

4.3.1 All SPPID inconsistencies indications must be resolved in the P&IDs. Any inconsistency that can't be resolved shall be documented and submitted to Saudi Aramco for approval. 4.3.2 Check List in attachment B of this appendix shall be followed

while creating the SmartPlant P&IDs.

4.3.3 SPPID symbols (based on ANSI & ISA), fonts and rules approved by EK&RD shall be used for the creation of SmartPlant P&IDs.

4.3.4 All Drawings & Reports submitted to EK&RD shall have customized title block as per section 5 of this standard. 4.3.5 The latest Saudi Aramco border file available at project

commencement shall be used. The CONTRACTOR shall verify with EK&RD that the border file available in the reference data is SACS compliant.

4.3.6 Arial Font shall be used for all textual elements of the drawing. 5. SMARTPLANT P&ID SET-UP

5.1 General

5.1.1 Latest versions of Intergraph Corporation's SmartPlant P&ID (SPPID) and SmartPlant Engineering Manager (SPEM)

approved by Saudi Aramco EK&RD (SPPID current approved version 4.3) (SPEM current approved version 4.4) shall be used in conjunction with Oracle 9i (9.2.0.1.0), as recommended by Intergraph for the creation of Intelligent Piping &

Instrumentation Diagrams (P&IDs).

5.1.2 SmartPlant P&ID Template provided by EK&RD shall be used while setting up the SPPID Project.

5.2 Site Server Set-up

Site Server shall be created and configured as follows:

Data Dictionary: Default

Site Server Name: Facility Name Database Type: Oracle

Table Space Name: TS_XXX_DATA_01* Temp Table Space: TEMP_XXX*

Database User Name: XXXSite* Database Password: XXXSite*

Data Dictionary Table space: TS_XXX_DATA_01* Data Dictionary Temp Table space: TEMP_XXX*

Database User Name: XXXSited* Database Password: XXXSited*

* Where XXX = the Plant abbreviation "e.g., HGP for Hawiyah Gas Plant" 5.3 Plant Set-up

5.3.1 See attachment C for the list of Plants, Units, and Areas and their associated data.

5.3.2 Plant Setup shall be defined and configured as follows:

Data Dictionary Use Custom Template

Template Path Company Data Dictionary path

Hierarchy Hierarchy 7 (PAU)

Plant Name Facility Name

Format File location Company Reference_Data path

Table space TS_XXX_DATA_01*

Temp table space TEMP_XXX*

Database Username XXXPlant*

Database Password XXXPlant*

Data Dictionary Table space TS_XXX_DATA_01*

Data Dictionary Temp Table space TEMP_XXX*

Database Username XXXPlantd*

Database Password XXXPlantd*

5.3.3 Following table lists the required data for each plant (Facility Name):

Description Value

Name Description

5.4 SmartPlant P&ID Application Association

When establishing Application Association, the following configuration shall be followed:

P&ID Reference Data path Company Reference Data path

Data Dictionary Source Use Custom Template

Template Path Company Data Dictionary path

Table space TS_XXX_DATA_01

Temp table space TEMP_XXX

Database Username XXXPlantpid

Database Password XXXPlantpid

Data Dictionary Table space TS_XXX_DATA_01

Data Dictionary Temp Table space TEMP_XXX

Database Username XXXPlantpidd

Database Password XXXPlantpidd

* Where XXX = the Plant abbreviation "e.g., HGP for Hawiyah Gas Plant" 5.5 Plant Hierarchy Structure

5.3.1 The project plant structure must comply with Hierarchy 7 available within the SmartPlant Engineering Manager, i.e., “Plant – Area – Unit.”

5.3.2 All drawings shall be created at the Unit level only. 5.3.3 The following shall be applied to all project data:

5.3.3.1 SP-PID Plant shall be the Facility Name 5.3.3.2 SP-PID Area shall be xx,yy,zz …

5.3.4 Following tables list the required data:

Plant

Description Data entry Value

Plant Name Yes

Description Yes

Area

Description Data entry Value

Area Name Yes

Description Yes

Unit

Description Data entry Value

Unit Name Yes

Unit Description Yes

Unit Code Yes

5.3.5 See Attachment E for a list of the Plants, Areas, and Units and their associated data for the XXX Project.