CR06 This report produces a list of all cost center assignments.
CR07 This report produces a list of all work center capacity.
CA60 This report enables you to list changes to individual routing fields in the sequence which they occurred.
MD73 In the "Total Requirements Display", you can check and, if necessary, change the planning figures. With this evaluation function you can list all the planned independent requirements that exist for a particular material or a product group. From this total requirements display, you can access more detailed information or you can branch into the change mode.
MD04 In the stock/requirements list, the most up-to-date
development of stocks and requirements is displayed. The layout of the list on the screen is the same as that of the MRP list.
MD05 Once you have carried out the planning run for the material via single-item or total planning and where you have also
specified that an MRP list is to be created, you can then display one of the lists with the function individual display.
Proceed as follows:
Starting from the menu screen of material requirements planning, select Evaluations -> MRP list ->Individual display.
The initial screen for the Individual Display of MRP List appears.
Enter the material number and the plant and press ENTER.
The MRP List screen now appears with an overview of the Individual Lines.
MD06 With the collective display, all planned orders which
correspond to the specified selection criteria are displayed; for example, all planned orders of a certain MRP controller.
MS07 The results of long-term planning are simulative planned orders at finished product level for the long-term planning version of the demand program. Simulative dependent requirements and receipts are created for the components.
Simulative capacity requirements are also created for
materials that are produced in-house. Separate MRP lists are also created for long-term planning. In the long-term planning menu, the stock/requirements list is also available as well as the planning situation as an individual layout.
MD09 With the evaluation, "Pegged requirements", you can retrace which requirements are the source of which order proposals and which independent requirements (especially sales orders) will be affected if an order proposal is cancelled or if its date or quantity is changed.
With the function, "Pegged requirements", you can determine which requirements and order proposals caused the current stock/requirements situation. This information is particularly useful when you have to find out which independent requirements (especially sales orders) are endangered if planned orders are cancelled or if they cannot be delivered on time.
CO20 This report shows a list of production orders according to the selection criteria entered. The material produced, the order schedule dates, the status of the order, and more are shown for each production order. From this list, the user can view the components and operational information for each order. This report is one that is standard delivered with the information systems, and in standard it does not include any totals listing.
Using this report requires that certain info structures are active to reflect current data.
CO24 This report shows a list of missing parts according to the selection criteria. You can use the missing parts information system to display the missing parts list for a selection of materials, or for all materials. It is possible to restrict your selection to a specific plant, MRP group or requirements data.
CO26 The Production Order Information System offers various list types in reporting.
Their layout can be adapted to suit your requirements. The information displayed in the production order information system as well as the layout of the information is controlled via an overall profile, which you can enter on the initial screen.
The overall profile contains several subordinated single profiles. They contain information regarding selection criteria and layout of lists.
Overall Profiles
MM60 Your company may have so many materials that you will not always know whether a specific material already exists in the material master. You can find this out with the help of the materials list.
CM01 Cap. Planning Evaluation by Work Centers – Load
CM02 Cap. Planning Evaluation by Work Centers –Orders
CM05 This report list displays all work centers and capacities with overload in the next 60 calendar days.
CM21 This is a report of capacity leveling evaluation-work center view
MCP3 Report for Production order analysis
MCP7 Report for work center analysis
MCRE Material usage analysis report
MCRI Product cost analysis report
T-CODE Description
MMBE STOCK OVERVIEW
BOM
CS01 CRT BOM
CS02 CHANGE BOM
CS03 DISPLAY BOM ROUTING
CA01 CRT ROUTING CA02 CHANGE ROUTING CA03 DISPLAY ROUTING WORK
CENTER
CR01 CRT WORK CENTER CR02 CHANGE WORK ENTER
CR03 DISPLAY WORK CENTER PRODUCTION
ORDER
CO40 CRT CONVERT PLANNED ORDER INTO PRD ORDER INDIVIDUAL CO01 MANUAL CRT. PRODUCTION ORDER
CO02 CHANGE PRODUCTION ORDER MRP
MD02 RUN MRP-SINGLE ITEM MULTI LEVEL MD04 STOCK REQUIREMENT LIST
MD11 CRT. PLANNED ORDER
COGI GOODS MOVEMENT ERROR
SOP
MC87 CRT. ROUGH CUT PLANNING FOR MATERIAL MC78 ACTIVE VERSION FOR MATERIAL
MC88 CHANGE ROUGH CUT PLANNING FOR MATERIAL MC74 TRANSFER MATERIAL TO DEMAND MANAGEMENT MC35 ROUGH CUT PROFILE
MB5B STOCK FROM POSTING DATE
MB51 STOCK DOCCUMENT LIST
COOIS PRODUCTION ORDER INFORMATION SYSTEM
MIGO GOODS MOVEMENT