Example of Restart Requirement Message

X

Use the following steps to run the O&M Access script. X

71.

Run the O&M Access Configuration tool

From the main EMAS window, select Tools and then O&M Access Configuration tool. The O&M Access Configuration window will appear. Click next.

On the second screen, click the option to “Use configuration file”. Then click on the browse button and go to the location of the <Utrancell>_OAM_Access.xml file for the node, on the thin client. Select it and verify that the path appears in the text area to the left of the browse button

Next click on the radio button for “Automatic (No Wizard)” and then click on next.

The tool will then proceed to configure the O&M settings for the node. On the last screen before committing the changes, instructions will be available to indicate the new IP address of the node and how to regain access to the node once the changes are made.

Take note of the instructions and then proceed to commit the changes. Implement the required changes on the thin client, and then proceed to re-establish a connection to the node on its new IP address.

Note: in order to access the site again via moshell after you loaded the O&M scripts you need to Set the IP address of the client to RBS_IP_ADDR+1 with the same subnet as the RBS, since the O&M changed the default IP address that was used in the DUW

X

MIC FE

initial

72.

Restart Element Manager.

Click Tools and select OAM Access.

X

73.

Click Next

X

MIC FE

initial

74.

OaM access Configuration File Input Page

Check “Use Configuration File”

Check “Automatic (No Wizard)”

Click “Browse”.

X

MIC FE

initial

75.

Navigate Client computer and select the xxxx_OAM_Access.xml file and click Open.

X

76.

 Verify that the the correct OAM script was selected.

Click “Next”.

X

MIC FE

initial

77.

The wizard now downloads the current configuration data from the RBS.

When the download is complete, the Current Configuration page displays a message stating that the configuration data is successfully loaded.

If the download fails, the wizard displays an error message.

Click Next.

NOTE: If the wizard displays an error message, take a snapshot of the error and contact your MIC support.

X

MIC FE

initial

78.

Display shows the Chosen RBS Configuration page, which summarizes the settings you have specified for the configuration.

Click “Finish” to start the installation.

On the popup window. Click OK to confirm.

X

MIC FE

initial

79.

The Current Action page is displayed.

If the IP address to the RBS is changed during the O&M Access

Configuration phase, the connection is temporarily lost. When a message about lost connection is displayed, wait for the connection to be restored automatically. If you click Close All, the progress window is closed and the configuration report is not displayed.

X

80.

Wait until the following message is displayed in the Result box:

“Configuration Completed Successfully”

X

81.

Click OK. The RBS EM will be closed immediately.

X

82.

Restart the RBS EM.

X

MIC FE

initial

83.

In the RBS EM View selector, select “Software”.

Click on “Managed Element 1”

Click the “CV” tab.

Verify that a Configuration Version (CV) is automatically created with the name OAM_....

X

84.

Verifying Network Synchronization Status In the RBS EM View selector, select ATM.

X

85.

Select MO Properties tab.

Select Actions tab.

From the Actions memu, select ping action.

86.

Enter the OSS IP address <10.175.144.4> in the host field.

Click Execute.

Verify the Result returns with an alive response.

NOTE: for CDNB integration, please inform your MIC support of the ping status and wait for further instruction.

MIC FE

initial

Configuring External Hardware

X

87.

In the RBS EM, from the Tools menu, click Site Equipment

Configuration... to start the Site Equipment Configuration wizard.

X

88.

In the Preconditions page, which displays basic information about the wizard, click Next.

X

MIC FE

initial

89.

In the File Input page, select the Use configuration file check box.

Select Automatic (No Wazard).

Click Browse to find the location of the configuration files on the Client, select <nodename>_RBS_ExtHardward.xml, and then click Open.

X

MIC FE

initial

90.

The current configuration data from the RBS is now downloaded. When the download is complete, the Current Configuration page displays a message stating that the configuration data is successfully loaded.

If the download fails, an error message will be displayed.

Click Next.

X

91.

Click Finish to start installation and display the Current Action page.

X

MIC FE

initial

92.

Wait until the following message is displayed in the Result dialog box:

Configuration Completed Successfully Click OK.

X

93.

In the RBS EM View selector, select Software.

Click the CV tab.

Verify that a CV is automatically created with the name SITE_....

X

MIC FE

initial

Verifying the LED Status X

94.

This activity verifies all units are working properly by verifying the Light Emitting Diode (LED) status.

Verify that:

 There are no red LED indicators for any unit.

 All units have a green LED indicator steady on.

 All units have a yellow LED indicator flashing or off.

For more information on the meaning of LED indicators, see Interpreting Optical Indicators.

X

Verifying the RbsLocalCell X

95.

This activity verifies the local RBS cell connection.

In the RBS EM View selector, select Radio Network.

Verify that all RbsLocalCell have the operational state Enabled.

X

Step Step Description

MIC FE Completed

initial

Completing the Integration X

96.

Run the Site Complete script

From the main EMAS window, select tools and then Run Command File from the menu options. Once the Run Command File window appears, ensure File location:

is selected to be client. Then click on Browse and find the file

<Utrancell>_Site_Complete.mo. Enable (check) the Halt on Errors and Verbose Logging check boxes. Then click on Start. The script file will run. View the Logging: window to ensure no errors were reported. If errors are encountered, troubleshoot on site, or forward the issue to the scripting team. See the screen capture below for additional details.

X

MIC FE

initial

Concluding Routines X

97.

Inform MIC support that the On-Site Integration is completed.

X

Step Step Description

Responsible

MIC FE Completed

initial

1

Check Alarm Status.

X X

2

Check For hardware Faults. EX: Red LEDS

X

3

Save any Logfiles and screen capture for your reference.

X X

4

Before you leave the site, ensure that the following actions have been performed:

Close the RBS EM.

• Tidy the site and leave it in the same condition as you found it.

• Update the site documentation, if there have been any changes during the integration.

• Give the updated site documentation to the person responsible for the site.

• Lock all the doors to the site.

X