• No results found

TESTING THE HYPOTHESES

CHAPTER 6 CONCLUSIONS AND

6.3 Future studies

There is a dire need for knowledge creation in the civil engineering construction industry which must be designed for the use of emerging civil engineering construction contractors. This knowledge creation in civil engineering construction needs to be built on its own, requiring intensive and laborious interaction (Eliufoo, 2008: 309). It needs to be identified and its ability needs to be utilised as part of an individual’s knowledge base, experience and behaviour. Further, emerging civil engineering construction contractors need to embark on productivity improvement as it is a crucial performance measure of construction’s core activity. This is in line with Chan and Kaka’s (2007: 564) view that ‘notion of the dominance of the project changes ideas if focus is on productivity improvements’.

REFERENCES

Abudayyeh, O., Diber–Deyoung, A . and Jaselskis, E. (2004) Analyisis of trends in construction research: 1985 – 2002. Journal of Construction Engineering & Management, 130(3), 433-439.

Adanan. H. A. (2006) Client satisfaction on contractor’s work performance. Masters of Science, Construction Management Thesis. University of Teknologi, Malaysia.

Agerschou, H. D. I., Ernst, T., Ghoos, H., Jensen, O. J., Koosgaard, J., Land, J. M., McKay, T., Oumeraci, J., Petersen, J. B., Schmidt, L. R. and Svendsen, H. L. ( 2004) Planning and design of ports and marine terminals. 2nd ed.London: Thomas Telford Publications.

Ahmad, I. ,Azhar, S. and Ahmed, S. M. (2004) Constructing infrastructure facilities in developing countries: A Bangladesh study.

Ali, R. (2005) The application of risk management in infrastructure projects. Cost engineering, 47 (8), 20-27.

Allen, L. A. (1973) The management professional: New Concepts and Proven Practices. New York : Mc Graw-Hill .

Applebaum ,A. H. (1999) Construction Workers in USA.Westport: Greenwood Publishing Group.

Amusa, A. (2004) A macroeconomic approach to estimating effective tax rates in South Africa. Department of Economics, University of Pretoria, 1 (1), 117-131. Anderson, S. D., Patil, S. S. and Sullivan, G. (2001) Optimizing

owner/contractor core competencies for capital programs. Journal of Management in Engineering, 17(2), 77-85.

Anumba, J. C., Egbu, C. O. and Carrilo, P. M. (2005) Knowledge Management in Construction. New York: Harvard Business School Press.

Anxo, D. and Boulin, J. (2006) The organisation of time over the life course: European trends, (2), 319-341.

Arditi, D. and Chotibhongs, R. (2005) Issues in sub-contracting practice. Journal of Construction Engineering & Management, 131(8), 866-876. Arthur, J. B. (2007) Validating the human resource system structure. A level- based strategic HRM approach. Human Resource Management Review, 17 (1), 77-92.

Aubrey. M. (2005) Practice aptitude assessment for building and construction industry. Sydney: Group training Australia (SA) Inc.

Arayici, Y. and Aouad, G. (2005) Computer integrated construction: An approach to requirements engineering. Journal of Engineering, Construction & Architectural management, 12 (2), 194-215.

Babbie, E. and Mounton, J. (2001) The practice of Social Research, Cape Town: Oxford University Press.

Bangs, D. H. and Axman, A. (2000) A crash course in marketing. Low cost marketing strategies that will double your sales not your expenses.

Holbrook,Mass.: Adams Media Publications.

Banik, G. C. (1999) Construction productivity improvement. Proceedings of 1999 ASC Annual Conference San Luis Obispo, California, 7-10 April 1999, 165-178. Barendrecht, J. M. (2007) Principles of European law . Study group on a European Civil Code. With advice from the Advisory Council approved by the Co- ordinating Group. Service Contracts. Munchen Sellier: European Law Publications. Bertelsen, S. ,Rooke, J. ,Koskela. L. and Henrich, G. (2007) Construction physics proceedings IGLC –Michigan, USA, 15 July 2007.

Bingham, T. (1992) Learn to stand up to main contractors. Construction and materials industries. Lancashire(UK) : Builder Group Plc Publications. Blanchard, B. S. (2003) System Engineering Management. 3rd ed. New York: Wiley Publications.

Blaser, M. ,Feit, H. A. and McRae, G. (2004) In the way of development: Indigenous Peoples, Life Projects and Globalization. New York: ZED BOOKS Publishing.

Bobrowski, M. (2002) Handbook of Massachusets land use and planning law: zoning,subdivision control,and nonzoning alternatives. 2nd ed. New York: Aspen Publishers.

Bradgate, R.. (2007) Commercial Law. Legal Practice Course Guide. Oxford: Oxford University Press Publications.

Brandenburg, S. ,Haas, C. and Byrom, K. (2006) Strategic Management of Human Resources in Construction. Journal of Management in Engineering, 22(2), 89-96.

Briscoe, G. (2006) How useful and reliable are construction statistics? Building Research & Information, 34(3), 220-229.

Bresnes, M. J., Ford.,J. R., Bryman, A. E. ,Keil, E. T., Beardworth, A.D. and Wray, K. (1986) Labour recruitment strategies and selection practices on construction sites. Construction Management & Economics, 4 (1), 37-55. Bryan, S. (1998) Spons Construction Resource Handbook. Technology &

Burleson, R. C. ,Haas ,C. T. ,Tucker, R. L. and Algernon, S. (1998) Multiskilled labour utilisation strategies in construction. Journal of Construction Engineering & Management, 124(6), 480-489.

Cabahug, R. R. and Edwards, D. F. (2002) Maintenance skills training of UK construction plant operatives: A pilot survey, 20(1), 22-30.

Caldas, C. H. ,Torrent, D. G. and C. T. Haas. (2006) Using Global Positioning System to Improve Materials–Locating Processes on Industrial Projects. Journals of Construction Engineering & Management, 132 (7), 741-749.

Cariaga, I., E–Diraby, T. and Osman, H. (2007) Integrating value analysis and quality function deployment for evaluating design alternatives. Journal of Construction Engineering & Management, 133(10), 761-770.

Casey, N. ,and Brennan, G. (2008) Conveyancing. Law Society of Ireland. 4th ed. Oxford : University Press Publications.

Cha, H. and O’Connor, J. (2006) Characteristics for leveraging value

management processes on capital facility projects. Journal of Management in Engineering, 22(3), 135-147.

Chan, P. W. and Kaka, A. (2007) Productivity improvements: Understand the workforce perceptions of productivity first, 36(4), 564-584.

Charoenngam, C. , Ogunlana, S. O. and Ning–Fu, K. (2004) Re-engineering construction communication in distance management framework. Business Project Management Journal, 10 (6), 645 – 672.

Chau, K., Anson, M. and Zhang, J. (2004) Four-dimensional visualisation of construction scheduling and site utilisation. Journal of Construction Engineering & Management, 130(4), 598-606.

Chean ,C .Y. J. and Garvin, M. J. (2004) An open framework for corporate strategy in construction. Engineering, Construction & Architectural Management, 11(3), 176-188.

Chen, H. (2007) Developing cost response models for company-level cost flow forecasting of project-based corporations. Journal of Management in Engineering, 23(4), 171-181.

Chen, Z .,Li, H., Kong, S. C. W. and Xu, Q. (2006) An analytic knowledge network process for construction entrepreneurship education. Journal of Management Development, 25 (1), 11-27.

Chileshe, N. , Haupt, T. C. and F. Fester. (2005) Assessing the readiness of building Diplomas for the South African Construction Industry. Proceedings of the 4th Triennial International Conference. Rethinking and Revitalizing Construction Safety, Health, Environment and Quality. Port Elizabeth, RSA, 17-20 May 2005. Childerhouse, P. ,Lewis, J. ,Naim, M. and Towill, D. R. (2003) Re-engineering a construction supply chain: A material flow control approach. Supply chain management: An International Journal, (4), 395-406.

Chinowsky, P. , Molenaar, K. and Realph, A. (2007) Learning organisations in construction. Journal of Management in Engineering, 23(1), 27-34.

Choi, Y. (2004) Principles of Applied Civil Engineering Design. Reston: ASCE Publications.

Choo, H. J. , Tommelein, I. D. ,Ballard, G. and Zabelle, T. R. (1999) Workplan: Constrain - based database for work package scheduling. Journal of

Construction Engineering & Management, 125(3), 151-160.

Chow, L., Then, D. and Skitmore, M. (2005) Characteristics of teamwork in Singapore Construction Projects. Journal of Construction Research, 6 (1), 15-46. Clark, D. (1982) Urban Geography. London: Croom Helm Publications.

Coega Development Corporation (CDC). Revision 05(July 2007) Tender offer evaluation and scoring. Empowerment objectives. Quality / functionality price. Specification.

Construction Education and Training Authority (CETA). (2000) Sector Skills Plan. Chapter five. Current Education and Training supply for the Construction Industry.

Construction Industry Development Board (CIDB). Version 1 – September (2006) Applying the registers of contractors in construction works contracts. Inform practice note 3.

Construction Industry Development Board (CIDB). First Edition of CIDB document 1036. September (2005). Procurement measures to develop registered contractors. Construction procurement. Best practice guideline no A8.

Construction Industry Development Board (CIDB). South African Construction Industry Status Report. (2004). Synthesis review on the South African Construction Industry and its development. Discussion document.

Construction Industry Development Board (CIDB), Construction Education and Training Authority (CETA) and Department of Public Works (DPW). National workshop report. 11-12 March (2005). Towards sustainable contractor development. Construction Sector Council. June (2003). Construction Industry Human Resource challenges and responses. Meeting Human Resource needs.

Costa,D.,Formoso,C.,Kagioglou,M.,Alarcon,L.,andCaldas,C(2006) Benchmarking initiatives in the construction industry: Lessons learned and improvements

opportunities. Journal of Management in Engineering, 22(4), 158-167.

Crockett, L. J. (2002) Agency, motivation, and the life course.48. Symposium on Motivation. Houston: Nebraska Publications.

Cropley, D. H. and Harris,M. B. (2004) Too hard, too soft, just right. Goldilocks and three research paradigms in SE, systems engineering, managing complexity and change–14th Annual International symposium proceedings, France, Toulouse, 20-24 June 2004.

Cushman, R. F. and Myers, J. J. (1999) Construction Law Handbook, 1, Wolters Kluwer. Law and Business. St.Peterburg, Florida: Aspen Publishers.

Dai, F. C. ,Lee, C. F. and Zhang, X. H. (2001) GIS–Based Geo-Environmental evaluation for Urban Land – Use planning: A case study, 61(4), 257-271. Dai, H. ,Cao, G. and Su,H. (2006) Management and Construction of the three Georges Project. Journal of Construction Engineering & Management, 132 (6), 615- 619.

Daily, B. F. and Huang, S. (2001) Achieving sustainability attention to Human

Resource factors in Environmental Management. International Journal of Operations & Production Management, 21(12), 1 539-1 552.

Da Silva, S. F. P. (2006) Developing planning test practices to improve construction productivity. MSc thesis, Department of Civil Engineering, University of Calgary, Calgary, Alta.

Debrah, Y. A. and Ofori, G. (2005) Emerging managerial competencies of professionals in the Tanzanian construction industry. International Journal of Human Resource Management, 16(8), 1 399-1 414.

Demkin, J. A. (2001) The Architect’s handbook of professional practice. The American Institute of Architects. 13th ed. Chichester: Wiley Publication. De Saram, D. D. (2001) Construction coordination activities: What is important and what consumes time. Journal of Management in Engineering, 17 (4), 202- 213.

Dikmen, I. and Birgönül, M. (2003) Strategic Perspective of Turkish Construction Companies. Journal of Management in Engineering, 19 (1), 33-40.

Dorée, A. and Holmen, E. (2004) Achieving the unlikely: innovating in the loosely coupled construction system. Construction Management & Economics, 22(8), 827- 838.

Dlungwana, W. S. and Rwelamila,P. D. (2004) Contractor development models that meet the challenges of globaisation – A case for developing management capability of local contractors. CIB International Symposium on globalisation and construction, Bangkok, Thailand, November, 1-12.

Dubois, A. and Gaddle, L. E. (2002) Construction industry as a loosely coupled system. Construction Management & Economics, 20(7), 621-631.

Dunlop, C. (2003) Principles of Home Inspection. Communication and Professional Practice. Chicago : Dearborn Home Inspection Publications.

East, E. W. and Liu, L. Y. (2006) Multi project planning and resource controls for facility management. Journal of Construction Engineering & Management, 132 (12), 1294-1305.

Eastern Cape Development Corporation (ECDC). (2007) Integrated Emerging Contractor Development Model. Close-out report.

Edwards, D. J. ,Holt, G .D. and Robinson, B. (2002) An artificial intelligence approach for improving plant operator maintenance proficiency. Journal of Quality in Maintenance Engineering, 8(3), 239 – 25.

Edwards,D.G.,Edwards,D.J.,Harris,F.,andMcCaffer,R. (2003) Management of Off-Highway Plant and Equipment. London:Taylor and Francis Publications. Edum-Fotwe, F. T. and McCaffer, R. (2000) Developing project management competency: Perspective from the construction industry. International Journal of Project Management, 18, 111-124.

Egbu, C. O. (1999) Skills, knowledge and competencies for managing construction refurbishment works, 17(1), 29-43.

El-Diraby, T. ,Costa, J.,and Singh, S. (2006) How do contractors evaluate company competitiveness and market attractiveness? The case of Toronto contractors. Canadian Journal of Civil Engineering, 33(5), 596-608.

Eliufoo, H. (2008) Knowledge creation in construction organisations: A case approach. The learning organization, 15(4), 309-325.

Ellis, R. D. and Lee, S. (2006) Measuring project level productivity on transportation projects. Journal of Construction Engineering & management, 132(3), 314-320. Emery, S. J. , Cronje, P. G. and Nyasulu, G. (2005) Development of emerging contractors through franchising.

Ernstrom, J. W. and Peartkee, K. F. (2003) AGC Contract Documents Handbook. New York : Aspen Publishing.

Eskritt, M. and Arthurs, C.(2006) Analytical reasoning skills:Improving performance with notations. Canadian Journal of Education, 29 (3), 855-872.

Fahy, J. (2000) The Resource-Based View of the Firm. Some stumbling blocks on the road to understanding sustainable competitive advantage. Journal of European Industrial Training. 24/2/3/4, 94-104.

Fayolle, A. (2007) Handbook of Research in Entrepreneurship Education. (2) Contextual perspectives. Chetelham(UK): Edward Elgar Publications. Fellows, R. , Langford, D. , Newcombe, R . and Urry, S. (2002) Construction Management in Practice. Maiden: Blackwell Science.

Field, O. P. (2007) Civil Service Law. London: Read Books Publications. Fisher, D. J., Schluter, L. and Toleti, P. K. (2005) Project management education and training process for career development. Journal of Construction Engineering & Management, 13(8), 903-910.

Fong, P. and Choi, S.( 2000) Final contractor selection using the analytical hierarchy process. Construction Management & Economics, 18(5), 547-557. Fong, S. and Chu, L.(2006) Exploratory study of knowledge sharing in contracting companies: A socio technical perspective. Journal of Construction Engineering & Management, 132(9), 928-939.

Fong, P. and Lung, B.(2007) Inteorganizational Teamwork in the Construction Industry. Journal of Construction Engineering & Management, 133 (2), 157-168. Fox, P. W. (1999) Construction Industry Development: Exploring Value and Other

symposium, customer satisfaction: A focus for research and practice, Cape Town, September 1999.

Frazer, L. and Lawley, M. (2000) Questionnaire design and administration. A practical guide.

Francis, A. and Miresco, E. (2006) A chronographic method for construction project planning. Canadian Journal of Civil Engineering, 33(12), 1 547-1 557.

Fryer, B. (2004) The Practice of Construction Management. 4th ed. Blackwell Publications.

Fukai, D. (2001) Graphic communications in construction. Prentice Hall Publishing. Galloway, P. D. (2006) Comparative study of University courses on critical–path method scheduling. Journal for Construction Engineering and Management, 132(7), 712-722.

Gamble, J. (2004) Retrieving the General from the particular: The structure of craft knowledge. In: Muller, J., Davies, B., and Mariais, A. (Eds). Reading Bernstein, researching Bernshein . London: Routledge Falmer.

Ganaway, N. B (2007) Construction Business Management: What every construction contractor, builder and subcontractor need to know (paperback). Oxford; Burlington, MA : Butterworth – Heinemann Publications.

Giachino, J. W. (1997) Course Construction in Industrial Arts, Vocational & Technical Education.4th Ed. Armer Technical Publications.

Giaquinto, M. (2007) Visual thinking in mathematics. An epistemological study. Oxford: University Press Publishing.

Gidado, K. (2004) Enhancing the prime contractor’s pre-construction planning. Journal of Construction Research, 5(1), 87-106.

Giddens, A. (2006) Sociology.5th ed. Polity Publications.

Gillham, B. (2000) Developing a questionnaire. London: Continuum.

Goodman, J. ,Earnshaw, J. ,Marchington, M. and Harrison, R. (1998) Unfair dismissal cases, disciplinary procedures, recruitment methods and management style: case study evidence from three industrial sectors, 20 (6), 536-550.

Goodwin, N. ,Gruen, R. and Iles, V. (2006) Managing Health Services. New York : Open University Press Publishing.

Goldenberg, G. M. and Shapira, A. (2007) Systematic Evaluation of Construction Equipment Alternatives: Case study. Journal of Construction Engineering & Management, 133(1) , 72-85.

Gorse, A. C. and Emmitt, S. (2003) Investigating interpersonal communication during construction progress meetings: challenges and opportunities. Engineering,

Govender, J. N. and Watermeyer, R. B.(2001) Potential procurement strategies for construction industry development in the SADC region.

Graham. D. (2006) Managing residential construction projects: Strategies & solutions. London : Mc Graw-Hill Publishing.

Grigg, N. S. and Criswell, M. E. (2001)Civil Engineering Practice in the Twenty- First Century: knowledge. Alexander Bell Drive, Reston: ASCE Publications. Griffith, A. (2000) Integrated management system: A single management system solution for project control? Engineering Construction & Architectural

Management, 7(3), 232-239.

Gunham, S. and Arditi, D. (2005) Factors affecting international construction. Journal of Construction Engineering & Management, 131(3), 273-282. Handfield, R. B. (2006) Supply Market Intelligence: A Managerial Handbook for Building Sourcing Strategies. Series on Resource Management. Miami, Florida: CRC Press Publications.

Harris, F. C. ,McCaffer. R., and Edum-Fotwe, F. R. (2006) Modern construction management. . 6th ed. Blackwell Publishing.

Hassanein, A. and Moselhi, O. (2004) Planning and Scheduling Highway Construction. Journal of Construction Engineering & management, 130(5), 638-646.

Hauptfleisch, A. C. (2006) An accelerated integrated small construction contractor development model. A holistic approach for a developing country. ACH- Slovenia paper.

Hauptfleisch, D. ,Lazarus, S. , Knoetze, T. and Liebenberg, S. (2007) Integrated emerging Contractor Development Model for the construction industry. Practical implementation and statistical quantification. Construction for development. CIB World Building Congress, Cape Town, South Africa, 14-18 May 2007, 1-10.

Hatush, Z. and Skitmore, M. (1997) Criteria for contractor selection. Construction Management & Economics, 15 (1), 19-38.

Heath, L. (2004) Cost Engineering Applications for Performance Bond Surety Defaults. Cost Engineering, 46(10), 18-24.

Hejducki, Z. (2004) Sequencing problems in methods of organising construction processes. Engineering, Construction & Architectural Management, 12(1), 20- 32.

Hewage, K. N. and Ruwanpura, J. Y. (2006) Carpentry workers issues and efficiencies related to construction productivity in commercial construction projects

Holbeche, L. (2001) Aligning Human Resources and Business Strategy. Boston : Butterworth – Heinemann Publications.

Holmes, G. (1995) To tender or to negotiate: The buyer’s dilemma. Journal of Marketing practice : Applied Marketing Science, 1 (3), 7-17.

Holt, G. (1997) Classifying construction contractors. Building Research & Information, 25 (6), 374-382.

Hill, C. (2001) Work based learning for Construction Management Courses Akintoye, A. (Ed). 17th Annual ARCOM Conference. University of Salford Association of Research in Construction Management.

Huang, R. (2005) System development for non-unit based repetitive project scheduling. Automation in construction, 14 (5), 650-665.

Huang, Y. (2006) Graphical-based multistage scheduling method for RC building. Construction Management & Economics, 24(1), 5-18.

Huang, X. and Hinze, J. (2006) Owner’s role in construction safety. Journal of Construction Engineering & Management, 132(2), 164-173.

Hughes, P. and Ferrett, E. (2007) Introduction to Health and Safety in Construction. 2nd ed. Oxford : Butterworth – Heinemann Publications. Humphreys, K. K. and Wellman, P. (1995) Basic Cost Engineering. 3rd ed. North Carolina, USA :CRC Press Publishing.

Humphreys, P. ,Matthews, J. and Kumaraswamy, M. (2003)Preconstruction project partnering: From adversarial to collaborative relationships. Supply Chain Management: An International Journal, (2), 166-178 (13).

Hutchings, M. and Christofferson, J. (2001) Factors Leading to Construction Company Success. Perceptions of Small-Volume Residential Contractors, ASC Proceedings of the 37th Annual Conference, University of Denver – Denver, Colorado, 263-270.

Hutchinson, A. and Finnemore, M. (1999) Standardized process improvement for construction enterprises. Total Quality Management, 10(4/5), 576-583. Hymes, S. (2005) Identifying Risk Transfer Traps. AACE International Transactions.

International Foundation for Protection Officers. (2003) Protection Officer

Training Manual. 7thed. New York: Butterworth-Heinemann Publications. Jaafar, M. ,Ramayah, T. , Abdul–Aziz, A., and Saad, B. (2007). Engineering,

Construction & Architectural Management, 14(2), 180-191.

Jackson, B. J. (2004) Construction Management. Jumpstart. London: Published by Wiley.

Jacquet, A. (2002) Sustainable contractor development through coordinated and focus interventions. Paper presented at the Built Environment Profession Convention.

Jakrapong, P. and Liston, J.(2003)TenSEM: A multicriteria and multidecision- makers’ model in tender evaluation. Construction Management & Economics, 21(2), 21-30.

Jang, H. , Russell, J. S. and Yi, J. S. (2003) A project manager’s level of satisfaction in construction logistics. Canada Journal of Civil Engineering. 30, 1 133-1 142.

Jefferis, A. and Madsen, D. A. (2004) Architectural Drafting and Design. 5th ed. New Albany:Thomson Delmar Learning Publications.

Joyce, M. D. (2004) Residential Construction Academy. Plumbing.Clifton Park,New York: Cengane Learning Publishing.

Jordan, G. (2004) Language learning and language teaching. Theory construction in second language acquisition. Lancaster(UK): John Benjamins Publishing. Kasturi, S. and Gransberg, D. (2002)Time management. A Design-Build Bulder’s Perspective. Cost Engineering, 44 (9), 16.

Kazaz, A. and Ulubeyli, S. (2007) Drivers of productivity among construction workers: A study in a developing country, 42 (5), 2 132 -2 140.

Keller, W. L. and Darby, T. J. (1997) International Labour & Employment Laws. American Bar Association International Labour Law. 2nd ed.Washington,DC: Published by BNA books.

Khosrow–Pour, M. (2006) Emerging trends and challenges in Information Technology Management.Hershey,Penn.: Idea Group Inc (IGI) Publications. Klinger, M. and Susong, M. (2006) The construction project. Phases people terms paperwork processes.

Koehn, E. and Datta, N.K. (2003) Quality Environmental, and Health Safety Management System for Construction. Journal of Construction Engineering & Management, 129 (5), 562-569.

Koel, L. (1999) Construction print reading.Albany: Delmar Publishers.

Kumaraswamy, M. (2002) Construction workstudy. Architecture Buildings Technology (applied sciences). University of Hong Kong.

Lane, F. C. , Blanche, D. C. , Fisher, G. J. and Tyler, D. B. (2001) Ships for victory: A history of shipbuilding under the US maritime.Baltimore,MD: Johns Hopkins University Press Publications.

Lawless, A. (2005) Numbers and Needs. Addressing imbalances in the civil engineering profession.Johannesburg: Published by the South African Institution of Civil Engineering (SAICE).

Law, S. Y. W. and Tang, C. H. W (2003) Motivation of survey employees in construction projects. Journal of Geospatial Engineering, 5 (1), 61-66.

Lee, S. , Thomas, S. R. and Tucker, R. L. (2005) Web-based benchmarking system for the construction industry. Journal of Construction Engineering & Management, 131(7), 790-798.

Leedy, P. D. and Ormond, J. E. (2005) Practical research planning and design. 8th ed. New Jersey: Prentice Hall Publications.

Leary, M. R., and Tangney, J. P. (2005) Handbook of self and identity. New York: Guilford Press Publications.

Levy, S. M. (2002) Project management in construction. 4th ed. New York: McGraw-Hill publications.

Levy, S. M. (2006) Project management in construction. 5th ed. New York: Mc Graw-Hill publications.

Lewis, J. (2005) Termination of Employee Perceived as Incurable Alcorable Alcoholic Violated ADA.

Li,H., and Love, P. E. D. (1998) Developing a theory of construction problem solving. Construction Management & Economics, 16 (6), 721-727.

Li, Y ., Nie, X., and Chen, S. ( 2007) Fuzzy Approach to Prequalifying

Construction Contractors. Journal of Construction Engineering & Management, 133(1), 40-49.

Lillie, N. (2007) Industrial Relations, Migration, and Neoliberal Politics: The case of the European Construction Sector. Politics and Society, 35 (4), 551-581. Liker, J. K. (2004) The Toyota way: 14 Management principles. New York :Mc Graw-Hill Publishing.

Loosemore, M. , Dainty, A. and Lingard, H. (2003) Human Resource Management in Construction Projects: Strategic and Operational approaches. London: Taylor and Francis Publishing.

Love, P. E. D. and Li,H. (2000) Quantifying the causes and costs of rework in construction. Construction Management & Economics, 18(4), 479-490. Macmillan, F. and Bowrey, K. (2007) New Directions in copyright law.31(4). Cheltenman: Edward Elgar Publications.

Maheswari, J. U., Varghese, K., and Sridharan, T. (2006) Journal of Construction Engineering & Management, 132(5), 482-490.

Marsh, P. D. V (2000) Contracting for Engineering and Construction Projects. 5th ed. Burlington,VT. Gower Publishing.

Matthews,J.,Pellew,L.jPhua,F.,andRowlinson,S.(2000)Quality relationships: Partnering in the construction supply chain. International Journal of Quality & Reliability Management, 17(4/5), 493-510.

Matthews, B. , Sylvie, J., Lee, S., Thomas, S., Chapman, R., and Gibson, G. (2006) Addressing security in early stages of project life cycle. Journal of management in engineering, 22(4), 196-202.

Maturana, S. ,Alarcòn, L. , Gazmuri, P. and Vrsalovic, M. (2007) On-site Subcontractor Evaluation Method Based on Lean Principles and Partnering Practices. Journal of Management in Engineering, 23 (2), 67-74.

McCaffer, R. (2004) Academia – Delivering for Industry. Ellis, R. and Bell, M. (Eds) COBRA 2004. The International Construction Conference. Responding to change.Construction Building Research. Leeds, 7-8 September 2004 ,17-26. Mearig, T. ,Coffe, N. and Morgan, M. (1999) Life cycle cost analysis handbook. State of Alaska. . Department of Education and Early Development,Education Support Services/ facilities.1st ed.

Middleton, S. (1999) Equipment theft; finding the solutons to a billion dollar problem. “Heavy equipment news”, 48-49.

Mincks, W. R. and Johnson, H . (2003) Construction jobsite management. McCutcheon, R. T and Crosswell, J. (2001) Small contractor development and employment–A brief survey of sub-saharan experience in relation to civil construction. Urban forum, special issue, 12(3-4), 365-379.

McGeorge, D. and Palmer, A. (2002) Construction management new directions. Oxford(UK): Blackwell Science Ltd.

McInnis, A. (2001) The New Engineering Contract: A legal Commentary. London: Thomas Telford Publishing.

McMahan, J. (2007) Professional property development. New York: Published by Mc Graw–Hill publications.

McNamara, C. (2008) Management function of coordination / controlling: overview of basic methods. Adapted from a field guide to leadership and supervision. Mills, A. (2006) Case Studies of the Decision-Making Process of Construction Clients. AACE International Transactions.

Mohammad.S. ,E–Mashaleh,C, Edward. B. ,Minchin. R and O’Brien, W. J. (2007) Management of construction firm performance using benchmarking

Related documents