GROWTH AND THE CURRENT SYSTEM MAP

In document COMMITTEE INFORMATION PACKET (Page 97-104)

INFORMATION ITEMS:

GROWTH AND THE CURRENT SYSTEM MAP

Notes: The two newest TCU stations are app only, meaning there are no credit card transactions that happen at the kiosk. This has been very successful and we are interested in implementing this on other select stations. Not only is this easier for the user, it is a more secure way to purchase a pass.

Next to be approved:

• Riverside Park

• Gateway Park 2

• Sycamore Park We have four concrete pads in place ready for these stations to be in placed mid-September:

• Fort Brewery

• Capps Park

• Rosemont Park

• Kellis Park

We have plans for these to be placed in October:

• Marine Creek Linear Park

• Lincoln Park

• Rodeo Park

• TexRail North Side Station

Notes: We also have a few new

downtown station locations picked out and are evaluating where we have

“holes” to fill in.

In June, we went through the RFP process to determine which GPS tracers would be best for our system. We were able to purchase GPS trackers for all of our Electric Assist Bikes and have been thrilled with the results.

We are able to track and locate bikes in a manner of minutes, not only avoiding theft but saving our team quite a bit of time chasing down wayward bikes.

The GPS is set to “wake on motion and stop” so we have a pin point each time the GPS tracker is moved and when it stops for a prolonged period of time (at a red light, for example).

We have already used this service a number of times to find wayward bikes. In addition to locating bikes, the data we pull can help determine where additional stations may be beneficial by showing us where riders stop during their trip and estimate more accurately how far a bike has traveled between battery swaps allowing us to be more efficient in this task.

Other BCycle cities are following what we are doing with our trackers and have expressed interest in learning how to implement these in their systems. We are very proud of our GPS trackers.

Here is an example of the data base home screen. We simply type in a BCycle number and are able to see the entire history of pings since installation.

BCycle has created a new Kiosk Client that upgrades the way a customer can interface with the kiosk and incorporates enhanced security. Major changes include:

• a light back ground with dark font, making it easier for customers to see the screen

• phone number validation, customers must enter a code sent to their phone number to continue the checkout process

• eliminates the need for a daily kiosk computer restart

• allows our team to control when we deploy updates

• offers a “phone number look up or app” option if we choose to eliminate kiosk purchases

• gives control of certain display screens to our team

There have been a few kinks and installing the new software has been lengthy and has consumed much more data than we anticipated but we have already seen benefit from the improvements.

We have installed the new client on 20 of our kiosks, including all newly placed stations.

INFORMATION ITEM

Item: Finance Update Meeting Date: September 20, 2021 Fred Crosley, Chief Financial Officer/ Vice President, will present an update on Finance.

As of July 31, 2021

(Unaudited) CURRENT ASSETS

Cash restricted for Operations $3,227,757

Cash restricted for Rail Vehicles 795,678

Unrestricted cash and cash equivalents 57,473,461

Investments 0

Receivables 26,006,492

Inventory 7,357,498

Prepaid 3,958,238

Total Current Assets 98,819,125

FIXED ASSETS

Work in Progress 22,665,302

Land 156,770,450

Buildings 152,273,956

Building Improvements 4,353,704

Machinery and Equipment 374,903,213

Improvements other than Buildings 764,632,378

Intangible Assets 18,897,291

1,494,496,294 Less: Accumulated Depreciation & Amortization (340,148,073)

Total Fixed Assets 1,154,348,221

TOTAL ASSETS $1,253,167,345

LIABILITIES AND NET ASSETS CURRENT LIABILITIES

Accounts Payable and Accrued Liabilities $16,103,854

Payroll Liabilities 3,130,894

Unearned Revenue 27,662,052

Unearned Grant Revenue 795,678

Current portion of LT Payable to State 1,033,536

Current portion of LT TEXRail Loan 60,000,000

Current portion of LT Due Grapevine 160,291

Total Current Liabilities 108,886,305

LONG TERM LIABILITIES

Long Term Payable to State 7,251,309

Long Term Payable to City of Grapevine 3,428,049

Total Long Term Liabilities 10,679,358

TOTAL LIABILITIES $119,565,663

NET POSITION

Net Investment in Capital Assets $1,073,975,692

Operating Reserve 3,227,757

Balance Sheet

Actual Budget Variance Operating Revenue

Fares

Multi Modal Fares (Note 1) $3,303,222 $5,038,438 ($1,735,216)

ACCESS Fares 650,624 716,279 (65,655)

Easy Ride & Corporate (Note 2) 183,221 369,246 (186,025)

Other Revenue

Sales Tax (Note 3) 67,635,290 47,674,544 19,960,746

Fort Worth Bike Share 226,026 347,795 (121,769)

Advertising 450,059 416,667 33,392

Rental Income 472,590 556,089 (83,499)

Other 1,158,530 950,300 208,230

Total Operating Revenue: 74,079,562 56,069,357 18,010,205

Federal/State/Local Income:

Operating Assistance Grants (Note 4) 11,178,692 15,964,321 (4,785,629)

Grapevine Contribution (Note 5) 6,719,170 5,217,653 1,501,518

Contributions from Partners 1,471,866 2,017,994 (546,128)

Total Assistance Income 19,369,728 23,199,968 (3,830,239)

Total Revenue $93,449,290 $79,269,325 $14,179,966

Operating Expenses Fixed Route Operations

Salaries & Fringe Benefits $21,983,566 $22,967,289 ($983,723)

Services 769,489 515,078 254,412

Purchased Transportation (Note 6) 1,477,684 2,937,738 ($1,460,054)

Other 3,354,154 2,825,598 $528,556

Total Fixed Route Operations 27,584,893 29,245,702 (1,660,810) ACCESS Operations

Salaries & Fringe Benefits 4,444,284 4,691,280 (246,997)

Services 3,740,347 3,402,259 338,088

Other 692,752 662,333 30,419

Total ACCESS Operations 8,877,382 8,755,872 121,510

TRE Operations

Salaries & Fringe Benefits 97,661 86,827 10,834

Services (Note 7) 11,822,868 13,311,484 (1,488,616)

Other 13,781 1,750 12,031

Total TRE Operations 11,934,310 13,400,061 (1,465,751)

TEXRail Operations

Salaries & Fringe Benefits 325,392 350,376 (24,984)

Services (Note 8) 14,051,389 15,851,734 (1,800,345)

Other (Note 9) 7,905,606 8,785,795 (880,189)

Total TEXRail Operations 22,282,388 24,987,905 (2,705,517)

Bike Share Operations

Salaries & Fringe Benefits 224,282 345,120 (120,838)

Services 123,940 76,733 47,207

Other 63,249 153,672 (90,424)

Total Bike Share Operations 411,471 575,525 (164,055)

General & Administrative

Salaries, Wages & Fringe Benefits (Note 10) 10,517,935 11,749,287 (1,231,352) Other Professional Services (Note 11) 3,338,891 7,237,914 (3,899,023) Vehicle & Facilities Maintenance 1,848,779 1,535,963 312,816

Software/Systems Maintenance 2,338,792 1,854,406 484,386

Other General & Administrative 2,955,231 3,651,454 (696,223) Total General & Administrative 20,999,628 26,029,024 (5,029,396) Total Operating Expenses: $92,090,071 $102,994,088 ($10,904,018)

Operating Income / (Deficit) $1,359,219 ($23,724,763) $25,083,984

Capital Grants (Note 12) 29,828,326 38,766,989 (8,938,663)

Investment Income 68,122 66,667 1,455

Depreciation (40,485,956) (44,563,655) 4,077,699

Interest expense (65,259) 56,335 (121,593)

Statement of Revenues and Expenses Fiscal Year to Date July 31, 2021

(Unaudited)

($ 000's)

Note 1 Multi Modal Fares

33% less ridership to budget and a $.02 reduction in average price to budget.

Note 2 Easy Ride & Corporate 85

$ Unfavorable variance between annual passes anticipated compared to actually purchased 102

$ Unfavorable subscription variances, including from Visit FW, Sundance Square, Downtown FW

Note 3 Sales Tax 66,951

$ Actual collectons from October through June 6,400

$ Accrual for July (5,716)

$ PV of the Overpayment from the state 17.7% June collection variance

9.7% YTD collections variance

Note 4 Operating Assistance Grants

The variance is substantially due to the recognition of revenue from the CARES Act in FY20 over that anticipated in the budgeting process.

Note 5 Grapevine Contribution 5,328

$ Actual Collections from October through February 1,391

$ Accrual for June and July 58.1% May collections variance -7.3% YTD collections variance

Note 6 Fixed Route Operations - Purchased Transportation

The variance is substantially due to the activities of all ZIPZONES.

Note 7 TRE Operations - Services

Lower than budgeted PTC costs and less costs paid to Herzog amounted to 55% and 25% of the variance with budget to date.

Note 8 TEXRail Rail Operations - Services

Savings in Positive Train Control operations and lower fuel costs

Note 9 TEXRail Rail Operations - Other

Insurance costs related to the contract with FW&W have not been incurred which accounted for a majority of the variance withbudget to date.

Note 10 General & Administrative - Salaries, Wages & Fringe Benefits

Budget salary increases were not awarded for FY21 which substantially accounted for the variance when coupled with open positions.

Note 11 General & Administrative - Other Professional Services Savings due to less use in various services due to COVID-19.

Note 12 Capital Grants

Notes to Financial Presentations

Comparisons of Actual Results to FY21 Budgeted Amounts