Page of Designated Services and Method of Payment

In document STATE BUILDINGS PROGRAMS (Page 121-144)

CONSTRUCTION

AND EXPENSE (INCLUDING LOCAL A/E) X

TEMPORARY POWER SERVICE X

FUELS FOR INITIAL TANK FILLING X

TEMPORARY ROADS X

ROADWAY MAINTENANCE X

DUST CONTROLS X

TEMPORARY EROSION CONTROL X

TEMP. WATER /SEWER EXPENSE & WATER

EXPENSES - SITE GRADING & COMPACTION X

TWO-WAY RADIO EQUIPMENT

(AS REQUIRED) X

TRASH CHUTE AND HOPPERS (AS

REQUIRED) X

EXHIBIT A Contract Number _____________

Project:

Location:

Sheet 8 of 15 Sheets

h:\admin\fpc-all\science building renovation\contractors\rfp for cmgc 060308.doc rev. 10/96 Responsibility:

x = Total 1 = Primary 2 = Secondary

Page of

Designated Services and Method of Payment

CONSTRUCTION

AUTOMOBILE AND FUEL (AS REQUIRED) X

PICK-UP TRUCK AND FUEL (AS REQUIRED) X

FLATBED TRUCK AND FUEL (AS REQUIRED) X

WATER TRUCK (AS REQUIRED) X

AIR COMPRESSOR AND FUEL (AS REQUIRED)

SNOW REMOVAL (AS REQUIRED) X

TIRES AND MAINTENANCE COST

EXHIBIT A Contract Number _____________

Project:

Location:

Sheet 9 of 15 Sheets

h:\admin\fpc-all\science building renovation\contractors\rfp for cmgc 060308.doc rev. 10/96 Responsibility:

x = Total 1 = Primary 2 = Secondary

Page of

Designated Services and Method of Payment

CONSTRUCTION

REMOVE SNOW AND ICE (AS REQUIRED) X

TEMPORARY ENCLOSURES (AS REQUIRED) X

PIPING COST IN BUILDING (AS REQUIRED) X

FUEL COST FOR HEATING (AS REQUIRED) X

POWER COST FOR HEATING (AS REQUIRED)

X

FURNACE RENTAL (AS REQUIRED) X

HEATER RENTAL (AS REQUIRED) X

BOILER RENTAL (AS REQUIRED) X

OPERATOR - TEMPORARY SYSTEMS

(AS REQUIRED) X

OPERATION FIRE WATCH (AS REQUIRED) X

CLEANING COST (AS REQUIRED) X

MAINTENANCE COST (AS REQUIRED) X

EXTENDED WARRANTY COST (AS

REQUIRED) X

FILTER CHANGE (AS REQUIRED) X

TEMPORARY OFFICE HEATING

(AS REQUIRED) X

TEMP WEATHER PROECTION & HEATING

FOR SUBCONTRACTORS (AS REQ’D) X

EXHIBIT A Contract Number _____________

Project:

Location:

Sheet 10 of 15 Sheets

h:\admin\fpc-all\science building renovation\contractors\rfp for cmgc 060308.doc rev. 10/96 Responsibility:

x = Total 1 = Primary 2 = Secondary

Page of

Designated Services and Method of Payment

CONSTRUCTION

VALUE ANALYSIS STUDIES PRINTING X

DATA PROCESSING (MAIN OFFICE) X

REFERENCE MATERIALS X

EXHIBIT A Contract Number _____________

Project:

Location:

Sheet 11 of 15 Sheets

h:\admin\fpc-all\science building renovation\contractors\rfp for cmgc 060308.doc rev. 10/96 Responsibility:

x = Total 1 = Primary 2 = Secondary

Page of

Designated Services and Method of Payment

CONSTRUCTION

FIELD INSPECTOR (AS REQUIRED) X

INSPECTORS’ OFFICE (AS REQUIRED) X

INSPECTORS’ TRANSPORTATION

(AS REQUIRED) X

INSPECTORS’ EQUIPMENT (AS REQUIRED) X

SPECIAL INSPECTION CONSULTANTS X

AIR AND WATER BALANCING X

OPERATOR ON-SITE TRAINING X

PREPARE OPERATION/MAINTENANCE

MANUALS 2 1

EXHIBIT A Contract Number _____________

Project:

Location:

Sheet 12 of 15 Sheets

h:\admin\fpc-all\science building renovation\contractors\rfp for cmgc 060308.doc rev. 10/96 Responsibility:

x = Total 1 = Primary 2 = Secondary

Page of

Designated Services and Method of Payment

CONSTRUCTION

FIELD OFFICE STAFF PARKING FEES X

SIGN PERMITS X

STREET/CURB PERMIT X

BUILDING PERMITS 1 2

PLAN CHECK FEES 1 2

WATER SYSTEM DEV. FEE X

SEWER USE & DRAINAGE PERMIT/DEV. FEE X

STORM CONNECTION FEE X

CHILLER WATER SERVICE CHARGE X

SPECIAL TAP FEES X

CONTRACTORS LICENSES X

CONSTRUCTION EQUIPMENT LICENSES X

CONSTRUCTION EQUIPMENT PERMITS X

EXHIBIT A Contract Number _____________

Project:

Location:

Sheet 13 of 15 Sheets

h:\admin\fpc-all\science building renovation\contractors\rfp for cmgc 060308.doc rev. 10/96 Responsibility:

x = Total 1 = Primary 2 = Secondary

Page of

Designated Services and Method of Payment

CONSTRUCTION

FICA INSURANCE (FIELD OFFICE STAFF) X

FEDERAL UNEMPLOYMENT

* ONLY AS MUTUALLY AGREED UPON BETWEEN THE PRINCIPAL REPRESENTATIVE AND THE CM.

EXHIBIT A Contract Number _____________

Project:

Location:

Sheet 14 of 15 Sheets

h:\admin\fpc-all\science building renovation\contractors\rfp for cmgc 060308.doc rev. 10/96 Responsibility:

x = Total 1 = Primary 2 = Secondary

Page of

Designated Services and Method of Payment

CONSTRUCTION

COST OF DESIGN AND ENGINEERING X

A/E FAST TRACK COST EXTRAS X

PRELIMINARY SOILS INVESTIGATION X

TITLE/DEVELOPMENT COST X

BUILDING OPERATION AFTER MOVE-IN X

BUILDING MAINTENANCE AFTER MOVE-IN X

MOVING COORDINATION X

MOVING COSTS X

COSTS OF EMERGENCY WORK X

CM GENERAL OVERHEAD COST X

CM PROFIT MARGIN X

GMP FINANCIAL RESPONSIBILITIES X

STATE REQUIRED INSPECTIONS X

EXHIBIT A Contract Number _____________

Project:

Location:

Sheet 15 of 15 Sheets

h:\admin\fpc-all\science building renovation\contractors\rfp for cmgc 060308.doc rev. 10/96 Responsibility:

x = Total 1 = Primary 2 = Secondary

Page of Designated Services and Method of Payment

CONSTRUCTION

CORPORATE EXECUTIVES (AS REQUIRED) X X PRINCIPAL IN CHARGE (AS REQUIRED) X X

PROJECT EXECUTIVE (AS REQUIRED) X X

LEGAL - BASIC SERVICES (AS REQUIRED) X X

ACCOUNTING (AS REQUIRED) X

PURCHASING (AS REQUIRED) X X

SAFETY OFFICER (AS REQUIRED) X

EEO OFFICER (AS REQUIRED) X X

SECRETARIAL AND CLERK-TYPIST

(AS REQUIRED) X X

BENEFITS AND VACATIONS FOR ABOVE X X

CONSTRUCTION MANAGER/GENERAL CONTRACTOR AGREEMENT CM/GC MODEL FORMAT

(STATE FORM

SC-6.4

) EXHIBIT B

CONSTRUCTION MANAGER'S CERTIFICATION

I hereby certify:

a. That I am the ______________________________________ and duly authorized representative of the firm of:

____________________________________________________________________;

and

b. That the wage rates and other factual unit costs supporting the compensation to be paid by the State for these professional services are accurate, complete, and current;

and

c. That I understand the original contract price and any additions shall be adjusted to exclude any significant sums by which the State determines the contract price had been increased due to inaccurate, incomplete, or non-current wage rates and other factual unit costs;

and

d. That all such contract adjustments shall be made within one year following the end of this contract.

CONSTRUCTION MANAGER

________________________________

Signature

CONSTRUCTION MANAGER/GENERAL CONTRACTOR AGREEMENT CMGC MODEL FORMAT

(STATE FORM

SC-6.4

) EXHIBIT C

CONSTRUCTION MANAGER’S CERTIFICATE OF LIABILITY INSURANCE (attached)

CONSTRUCTION MANAGER/GENERAL CONTRACTOR AGREEMENT CMGC MODEL FORMAT

(STATE FORM

SC-6.4

) EXHIBIT D

MINORITY AND WOMEN BUSINESS ENTERPRISE PARTICIPATION REPORT (attach to original Agreement and subsequent Amendments)

CONSTRUCTION MANAGER/GENERAL CONTRACTOR AGREEMENT CMGC MODEL FORMAT

(STATE FORM

SC-6.4

) EXHIBIT E

SCHEDULE OF VALUES

(when approved by the Principal Representative)

CONSTRUCTION MANAGER/GENERAL CONTRACTOR AGREEMENT CMGC MODEL FORMAT

(STATE FORM

SC-6.4

) EXHIBIT F

LIST OF PRE-QUALIFIED SUBCONTRACTORS (when approved by the Principal Representative)

CONSTRUCTION MANAGER/GENERAL CONTRACTOR AGREEMENT CMGC MODEL FORMAT

(STATE FORM

SC-6.4

) EXHIBIT G

SCHEMATIC DESIGN ESTIMATE SUMMARY AND UPDATED SUMMARIES (when approved by the Principal Representative)

CONSTRUCTION MANAGER/GENERAL CONTRACTOR AGREEMENT CMGC MODEL FORMAT

(STATE FORM

SC-6.4

) EXHIBIT H

FIRST AMENDMENT (INCORPORATING GMP) EXHIBITS

H.1 GUARANTEED MAXIMUM PRICE DOCUMENTS,DRAWINGS, AND SPECIFICATIONS INCLUDING ADDENDA AND MODIFICATIONS (WHEN APPROVED BY THE PRINCIPAL REPRESENTATIVE)

H.2 SCHEDULE OF BID PACKAGE DESCRIPTIONS AND ISSUANCE DATES H.3 SCHEDULE OF VALUES

H.4 ALLOWANCE SCHEDULE

CONSTRUCTION MANAGER/GENERAL CONTRACTOR AGREEMENT CMGC MODEL FORMAT

(STATE FORM

SC-6.4

) EXHIBIT I

SECOND AND SUBSEQUENT AMENDMENT (INCORPORATING BID PACKAGES) EXHIBITS I.1 Contract Document Drawings and Specifications (when approved by the Principal

Representative)

I.2 All Addenda and Modifications

I.3 Schedule of Values (consistent with GMP Schedule of Values) I.4 Allowance Schedule (consistent with GMP Allowance Schedule) I.5 Performance Bond

I.6 Labor and Material Payment Bond I.7 Property Insurance Certificate

I.8 Minority and Women Business Enterprise Participation Report (Form MWBE-1) I.9 Authorization to Commence Construction (Form SC 7.26)

I.10 Preliminary and Detailed Construction Schedules (when approved by the Principal Representative)

CONSTRUCTION MANAGER/GENERAL CONTRACTOR AGREEMENT CMGC MODEL FORMAT

(STATE FORM

SC-6.4

) EXHIBIT J

NOTICE OF ACCEPTANCE (attach when executed)

CONSTRUCTION MANAGER/GENERAL CONTRACTOR AGREEMENT CMGC MODEL FORMAT

(STATE FORM

SC-6.4

) EXHIBIT K

NOTICE OF CONTRACTOR’S SETTLEMENT (attach when executed)

CONSTRUCTION MANAGER/GENERAL CONTRACTOR AGREEMENT CMGC MODEL FORMAT

(STATE FORM

SC-6.4

) EXHIBIT L

REQUEST FOR PROPOSAL (DATED 8/14/00)

CONSTRUCTION MANAGER/GENERAL CONTRACTOR AGREEMENT CMGC MODEL FORMAT

(STATE FORM

SC-6.4

) EXHIBIT M

CONSTRUCTION MANAGER’S FEE PROPOSAL

CONSTRUCTION MANAGER/GENERAL CONTRACTOR AGREEMENT CMGC MODEL FORMAT

(STATE FORM

SC-6.4

) EXHIBIT N

CERTIFICATION AND AFFIDAVIT REGARDING ILLEGAL ALIENS (required at contract signing prior to commencing work)

APPENDIXC

MINORITY/WOMEN BUSINESS ENTERPRISE PARTICIPATION REPORT

State Form MWBE-1 Page 1 of 2

The Regents of the University of Colorado, a body corporate, acting by and through, the University of Colorado at Colorado Springs

Project No./Name: 08-163GC Science Building Renovation

TO BE ELIGIBLE FOR AWARD OF THIS CONTRACT, EACH CONTRACTOR (INCLUDING