OPERATOR’S PREVENTATIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
PROCEDURE NOT FULLY MISSION CAPABLE IF:
12 Before Drain Assembly
(Item 11) Check for damaged or missing parts. Drain or drain hardware are missing, not properly connected, or damaged. 13 During Installation Area Inspect installation area for sticks and
other sharp objects. Sharp objects are present.
14 During 210K Tank
(Item 1) Inspect for tears, punctures, or leaks. If torn or punctured, perform emergency repairs. See WP 0007.
Tank has tears, punctures, or leaks that cannot be repaired. 15 During Fill/Discharge Gate Valve (Item 2)
Check for bent or binding stem, broken hardware, and leakage. Check gasket and cam-lock arms for damage.
Stem, hand-wheel or handle, gasket, or cam-lock arms are damaged, missing, or leaking. 16 During Fill/Discharge Hose Assembly (Item 3)
Check hose for leaks, cuts, and tears.
Check fittings for distortion or damage. Hose assembly leaks or is damaged. 17 During Tank Drain Ball
Valve (Item 4)
Check for bent or binding stem, broken
handle, and leakage. Stem or handle is damaged, missing, or leaking.
18 During Tank Drain Hose
Assembly (Item 5) Check hose for leaks, cuts, and tears. Check fittings for distortion and damage. Hose assembly leaks or is damaged.
19 During Vent Fitting
Assembly (Item 6) Check vent, cap gasket, and cam-lock arms for evidence of leakage, damage, or missing parts. Check vent for cleanliness and freedom of operation. Check for damaged or missing gaskets.
Vent is damaged or missing. Vent, gasket, flat rubber gasket, or cam-lock arms damaged or missing.
PMCS PROCEDURES - Continued
Table 1. Preventive Maintenance Checks and Services - Continued ITEM NO. INTERVAL LOCATION ITEM TO CHECK/ SERVICE PROCEDURE NOT FULLY MISSION CAPABLE IF:
20 During Tank Vent
Assembly (Item 7) Check vent assembly for evidence of leakage, damage, or missing parts. Check vent for cleanliness and freedom of operation.
Vent assembly is damaged or missing.
21 During Tank Drain
Assembly (Item 8)
Check immediate area for evidence of leakage. Check for damaged or missing parts. Drain or drain hardware are missing, not properly connected, or damaged. 22 During Fi ll/Discharge
Assembly (Item 9) Check cam-lock arm and elbow body for damage or leakage. Cam-lock arms damaged or missing. Elbow body is cracked. Elbow sealing surface is badly dented.
23 During 210K Berm Liner
(Item 10) Check immediate area for evidence of leakage. Check for damaged or missing parts.
Drain hose assembly leaks or is damage. Drain valve or hardware are missing, not properly connected or damaged.
24 During Drain Assembly
(Item 11) Check immediate area for evidence of leakage. Check for damaged or missing parts. Drain or drain hardware are missing, not properly connected or damaged. 25 After 210 K Tank
(Item 1) Inspect for tears and punctures. If torn or punctured, perform emergency repairs (WP 0007).
Tank has tears or punctures that cannot be repaired.
PMCS PROCEDURES - Continued
Table 1. Preventive Maintenance Checks and Services - Continued ITEM NO. INTERVAL LOCATION ITEM TO CHECK/ SERVICE PROCEDURE NOT FULLY MISSION CAPABLE IF: 26 After Fill/Discharge Gate Valve (Item 2)
Check for bent or binding stem and broken hardware. Check gasket and cam-lock arms for damage. Check for missing or damaged dust caps and plugs.
Stem, hand-wheel or handle, gasket, or cam-lock arms are damaged or missing. 27 After Fill/Discharge Hose Assembly (Item 3)
Check for cuts and tears. Check fittings for distortion and damage, or missing gaskets, dust caps and plugs.
Hose assembly is damaged. Gaskets, dust caps or plugs are damaged or missing.
28 After Tank Drain Ball
Valve (Item 4)
Check for bent or binding stem and broken handle. Check for missing or damaged dust caps and plugs.
Stem, handle, gasket, or
cam-lock arms are damaged or missing.
29 After Tank Drain Hose
Assembly (Item 5)
Check hose for cuts and tears. Check
fittings for distortion or damage. Hose assembly is damaged.
30 After Vent Fitting
Assembly (Item 6)
Check vent, cap gasket,
rubber gasket, and cam-lock arms for evidence of leakage, damage, or missing parts. Check vent for cleanliness and freedom of operation. Check for damaged or missing gaskets.
Vent is damaged or missing. Vent, gasket, flat rubber gasket, or
cam-lock arms are damaged or missing.
31 After Tank Vent
Assembly (Item 7) Check vent assembly for evidence of leakage, damage, or missing parts. Check vent for cleanliness and freedom of operation.
Vent assembly is damaged or missing.
PMCS PROCEDURES - Continued
Table 2. Preventive Maintenance Checks and Services - Continued ITEM NO. INTERVAL LOCATION ITEM TO CHECK/ SERVICE PROCEDURE NOT FULLY MISSION CAPABLE IF:
32 After Tank Drain
Assembly (Item 8) Check cam-lock arm and elbow body for damage. Cam-lock arms damaged or missing. Elbow body cracked or worn.
33 After Tank Drain
Assembly (Item 8)
Check drain for damaged or missing
parts. Drain or drain hardware are missing, not properly connected, or damaged.
34 After Fill/Discharge
Assembly (Item 9) Check cam-lock arms and elbow for damage. Cam-lock arms damaged or missing. Elbow body is cracked or worn.
35 After 210K Berm Liner
(Item 10) Check immediate area for evidence of leakage. Check for damaged or missing parts.
Drain hose assembly leaks or is damaged. Drain valve or hardware are missing, not properly connected or damaged.
36 After Drain Assembly
(Item 11) Check immediate area for evidence of leakage. Check for damaged or missing parts. Drain valve or hardware are missing, not properly connected or damaged. 37 24 hours Emergency repair Leaking at sealing clamps and wooden