PROCESS TABLE D - Compression Molding

In document Copia de CQI-23 (Page 42-56)

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

1.4 2.1 2.13

Incoming material assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (i.e., melt flow, specific gravity, temperature recording).

1.4 2.1 2.13

Incoming components assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (if applicable).

1.4 2.1 2.13

Purging all equipment and feeding system to avoid cross contamination.

1.4 2.1 2.13

Process parameter verification:

- For SMC, Doctor box blade height, glass chopper speed, additives, carrier film speed, compaction pressure etc.

- For rubber, mixer RPM, temperature, additives etc.

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE D - Compression Molding

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

D2.3 Glass fiber distribution and density verification(for SMC). Manual

D2.4 Manual

3.0 Storage & Handling

D3.1 Manual

Compound property verification when applicable:

- For SMC, viscosity, initial sheet thickness etc.

- For rubber preform, elongation, tensile strength, compression set, pre-cure rate, or rheology etc.

1.4 2.11 2.12

Using a FIFO (First In - First Out) system for compound/preform, shelf life storage.

1.4 2.11 2.12

Environment temperature and humidity for preform storage (if applicable).

1.4 2.11 2.12

Compound floor time (e.g.., sheet rolls in SMC and rubber compound).

Special Processes: Molding System Assessment

Version 1, 3/2014

PT D 44 of 79

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE D - Compression Molding

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

D3.4 Manual

D3.5 Automatic/Manual

D3.6 Sheet shrinkage confirmation (for SMC) Manual

4.0 Molding Process

D4.1 Manual

1.4 2.11 2.12

Prevention of contamination by lubricants such as silicone, mold release such as calcium carbonate or oil from the pressurization system.

1.4 2.7 1.6 2.11 2.12

Partial containers handling to ensure no contamination (closed container, clean environment)

1.4 2.11 2.12

1.4 1.15

2.11 2.12

There shall be a standardized startup procedure/checklist that defines things to do at start-up

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE D - Compression Molding

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

D4.2 Production plan (machine, mold, materials, part style) Manual

D4.3 Startup check (verify process settings against setup sheet) Manual

D4.4 Cavity surface temperature verification Automatic/Manual

D4.5 Verification of preform size, or shape, or both Manual

D4.6 Verification of charge pattern (for SMC) Manual

1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12

Special Processes: Molding System Assessment

Version 1, 3/2014

PT D 46 of 79

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE D - Compression Molding

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

D4.7 Cavity surface cleanliness (no debris) Manual

D4.8 Mold closing speed Automatic

D4.9 Cavity temperature Automatic

D4.10 Post molding cooling (for SMC) - prevent deformation Manual

D4.11 Manual

1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12 1.4 1.15

2.11 2.12

First piece approval

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE D - Compression Molding

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

D4.12 Shut down procedure Manual

5.0 Quality Control

D5.1 Part weight Manual

D5.2 Dimensions Manual

D5.3 Appearance Manual

D5.4 Physical properties (if applicable) Manual

1.4 1.15

2.11 2.12

1.4 2.11

2.12 1.4

2.11 2.12 1.4

2.11 2.12 1.4

2.11 2.12

Special Processes: Molding System Assessment

Version 1, 3/2014

PT D 48 of 79

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

PROCESS TABLE D - Compression Molding

All requirements given below are subordinate to customer specific requirements.

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

*If minimum requirements are not met, provide supporting records to justify actual conditions.

Related Molding

System Assessment

Question #

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Monitoring Frequency

Minimum Requirement Actual Condition

Once per lot

Once per lot

PROCESS TABLE D - Compression Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

End of run or long downtime, material change

At start-up, and after long down time event, material change

Special Processes: Molding System Assessment

Version 1, 3/2014

PT D 50 of 79 Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE D - Compression Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

Hourly

Per production lot

Pull for use

Pull for use

Continuous and manually verify daily

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE D - Compression Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

Every eight hours

Continuous

Per lot (just before use)

Start-up and restart after long down time event

Special Processes: Molding System Assessment

Version 1, 3/2014

PT D 52 of 79 Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE D - Compression Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

At start-up

At startup and re-start

Each cycle

Each cycle

At start-up, and after long down time event

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE D - Compression Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

Each cycle

Continuous

Continuous

Each cycle

Start-up, and restart after down time event

Special Processes: Molding System Assessment

Version 1, 3/2014

PT D 54 of 79 Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE D - Compression Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

End of production or run

Start-up and once every 4 hours. For safety critical parts, start-up and once every hour

Per cavity, start-up and once every 8 hours

Per cavity, start-up and once every 8 hours

Per cavity, start-up and once every 8 hours

CQI-23

Special Processes: Molding System Assessment

Version 1, 3/2014

Monitoring Frequency

Minimum Requirement Actual Condition

PROCESS TABLE D - Compression Molding

The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.

Observation/

Comments

(Pass / Fail / N/A)

Special Processes: Molding System Assessment

Version 1, 3/2014

PT E 56 of 79

Item # Category/Process Steps Type of Control

Minimum Requirement Actual Condition

1.0 Receiving Inspection

E1.1 Manual

E1.2 Manual

2.0 Compounding and Preforming (if applicable)

E2.1 Manual