Setup hours, planned and actual
Quantity reported complete at the operation Quantity reported scrapped at that operation Due date or lead time remaining
These are the components of ______________ related to each operation.
A. Shop order master file B. Work-center master file C. Shop-order detail file D. None of these Answer: C
QUESTION 257
Material Requirements Planning (MRP) is:
A. The system used to provide available inventory B. The system used to avoid missing parts.
C. A schedule establish for the production agenda D. All of the above
Answer: B
QUESTION 258
A schedule (priority plan) that establishes to show the components required at each level of the assembly and based on lead time, calculates the time when these component will be needed called:
A. Material Requirements Planning B. Master Production Schedule C. Inventory control Planning D. B & C
Answer: A
QUESTION 259
How many types of demand are in Material Requirements planning?
A. Three B. Four C. Two D. Seven Answer: C
QUESTION 260
If a company makes wooden tables, the demand for the tables is called A. Independent Demand
B. Dependent Demand C. Both A & B
D. None of the above Answer: A
QUESTION 261
Independent demand is:
A. Directly related to the demand for any other products or assemblies B. Not related to the demand for any other products or assemblies C. Calculated
D. A & C
Answer: B
QUESTION 262
Independent demand must be A. Forecast
B. Calculated
C. Show the required quantity of each component D. Dependent demand items
Answer: A
QUESTION 263
Dependency in MRP can be A. Horizontal
B. Vertical
C. None of the above D. Both A & B Answer: D
QUESTION 264
Which of the following are the major objectives of Material Requirement Planning?
A. Determine requirements and keep priorities current.
B. Determine requirements and support production activities C. Control and monitoring material demands
D. Control the performance of the order Answer: A
QUESTION 265
A priority plan for the components needed to make the products in the Master production schedule (MPS) is called:
A. Production Activity control (PAC) B. Material Requirements planning (MRP) C. Capacity Requirement planning D. All of the above
Answer: B
QUESTION 266
The plan must be checked against available capacity when needed to make the components is called the process of
A. Capacity Requirement planning B. Material Requirements planning (MRP) C. Production Activity control (PAC) D. A & C
Answer: A
QUESTION 267
The computer software program that organizes and maintains the bills of material structures and their linkage is called:
A. Inventory record B. Purchasing record
C. Bills of material processor
D. Procurement of material and supplies Answer: C
QUESTION 268
Master production schedule, inventory records and bills of material are three major inputs to A. Material Requirements planning (MRP) System
B. Production activity Control
C. Manufacturing Planning and Control (MPC) Function D. Capacity Requirements planning (CRP)
Answer: A
QUESTION 269
Master Production schedule:
A. A statement of which end items are to be produced, the quantity of each, and the dates they are to be completed
B. Drives the MRP system by providing the initial input for the items needed C. Both A & B
D. None of the above is true Answer: C
QUESTION 270
Inventory Record is one of the major input to the A. Capacity Requirements planning (CRP)
B. Material Requirements planning (MRP) System C. Manufacturing Planning and Control (MPC) Function D. Production activity Control
Answer: B
QUESTION 271
Inventory records data are maintained in:
A. Inventory record file B. Part master file C. Item master file D. All of the above Answer: D
QUESTION 272
When a calculation is made to find out how many are needed, the quantities available must be considered in:
A. Maintaining the bills of material structures
B. Linkage between manufacturing planning and control system C. Inventory records
D. Both A & C Answer: C
QUESTION 273
The bill of material shows
A. The components that go into making the parent
B. The steps or process used to make the parent or the components C. Both A & B
D. None of the above Answer: A
QUESTION 274
A convenient way to think about bills of material is through:
A. Product Tree B. Dependent demand C. Inventory record D. All of the above Answer: A
QUESTION 275
Which of the following points are related to bills of material?
A. The bill of material shows all the parts required to make one of the items B. Each part or item has only one part number
C. A part is defined by its form, fit or function. if any of these changes , then it is not the same part and it must have a different part number
D. All of the above Answer: D
QUESTION 276
Multilevel bills are formed as:
A. Logical grouping of parts into subassemblies based on the way the product is assembled.
B. Overall design for the arrangements of bills C. To make identification of the part absolute D. Both A & B
Answer: A
QUESTION 277
What the following figure shows:
A. The parent omponent relationship B. Quantity and parts relationship C. Identification of the parts D. None of the above Answer: A
QUESTION 278
A bill is used when companies usually make more than one product and the same components are often used in several products
A. Single-level bill B. Multiple bill C. Multilevel bill
D. Indented bill Answer: B
QUESTION 279
Which of the following are the advantages to use single-level bills?
A. Duplication of records is avoided
B. The numbers of records and, in computer systems, the file size are reduced by avoiding duplication of records.
C. Maintaining bills of material is simplified D. All of the above
Answer: D
QUESTION 280
By using following product tree, how many Ks are needed to make 200Xs and 150 Ys?
A. 1900 Ks B. 900 Ks C. 2100 Ks D. 800 Ks Answer: A
QUESTION 281
A multilevel bill of material can shown as A. Indented bill
B. Summarized parts list C. Single-level bill D. Planning bills Answer: A
QUESTION 282
In bills of Material structure; Summarized parts list:
A. The lists of all the parts needed to make one complete assembly
B. Does not contain any information about the way the product is made or assembled
C. It's the list of comments are linked to their parents by listing them immediately below the parents D. Both A & B
Answer: D
QUESTION 283
Which of the following is an artificial grouping of components for planning purposes?
A. Indented bill
B. Summarized parts list C. Single-level bill D. Planning bill Answer: D
QUESTION 284
Planning bills are used to:
A. Simplify forecasting
B. Master production scheduling C. Material requirements planning D. All of the above
Answer: D
QUESTION 285
Planning bill does not represent A. Buildable products
B. Average product C. Product structure looks D. None of the above Answer: A
QUESTION 286
Where-used reports give information about A. The parents for a component
B. Independent and dependent demand C. Both A & B
D. None of the above Answer: A
QUESTION 287
A listing of all the parents in which a component is used is called