Revision Management

In document Eplan Electric p8 Basic 2 (Page 101-128)

Switch users

9. Revision Management

Completing Projects and Pages

In EPLAN, projects can be completed at any time. The project is then write-protected and can no longer be changed. A completed project is stored in the project directory with the extension *.elr.

Select the menu item Utilities > Revision control > Complete project.

Click [Yes] in the message window in order to use the comments on the revision as the description for the page modification. (If you click [No], the process will be canceled, and you can complete the pages manually).

Complete pages

Select the project or the modified pages in the page overview, and select the menu item Utilities > Revision control > Complete pages.

EPLAN ELECTRIC P8 Basic Training

Generating Revisions

Utilities > Revision control > Generate revision

In the Generate revision dialog, enter a name for the revision in the Revision name field. In the Comment field you can enter a short description of the revision, but the field may also be left blank. Click [OK].

EPLAN ELECTRIC P8 Basic Training

Generating Comparison Projects

Utilities > Revision control > Generate comparison project

In the Generate comparison project dialog, enter a name for the comparison project in the Project name field.

In the Comment field you can enter a short description of the comparison project, but the field may also be left blank.

Select the check box Generate temporary comparison project if you would like to generate a non-write-protected project that you can delete again later.

Click [OK].

EPLAN ELECTRIC P8 Basic Training

Comparing Projects

Differences between two projects are registered by comparing particular properties with one another. In the Compare projects dialog, you can determine which projects will be compared. The properties to be compared are determined in the Comparison settings dialog. If the value of the properties is identical for two projects, then no difference is registered between them.

Select the desired project in the page navigator and select the menu item Utilities > Revision control > Compare projects.

In the Compare projects dialog, select the check box Show only associated comparison projects.

In the list, select Compare with to select the comparison project you would like to compare with the currently opened project.

In the Comparison settings field, select the scheme which determines the settings for the comparison. (If you have not stored your own schemes, then only the standard scheme will be offered here. In this case create a new scheme by Specifying comparison settings.)

In the Text field, enter the text to be used to mark the revision changes in the properties.

Click [OK].

EPLAN ELECTRIC P8 Basic Training

Removing Revision Markers

You can remove revision markers created via change tracking or a project comparison from the project separately.

Utilities > Revision control > Delete revision markers

In the Delete revision markers dialog, select which markers you would like to delete: Check the corresponding check boxes. Click OK after you have done

EPLAN ELECTRIC P8 Basic Training

Removing Write Protection

Completed projects and comparison project are always write-protected. Only temporary comparison projects are not write-protected. However, it is possible to remove the write protection if necessary.

Utilities > Revision control > Remove write protection

EPLAN ELECTRIC P8 Basic Training

10. Translation

Setting Up Translation Database Opening a Dictionary

As standard, EPLAN dictionaries are stored in the ..\Translation directory.

Select Utilities > Translation > Edit dictionary > Management tab.

EPLAN ELECTRIC P8 Basic Training

Click [...] next to the Dictionaries field.

Select the directory where the dictionary is located. Select the Microsoft Access-Datenbanken (*.mdb) file type and then select the desired file.

EPLAN ELECTRIC P8 Basic Training

Creating a Dictionary

You can create and manage multiple dictionaries. Select the appropriate dictionary for each of your projects.

Utilities > Translation > Edit dictionary > Management tab Select [Extras] > New.

EPLAN ELECTRIC P8 Basic Training

To create a new database for the dictionary, enter a file name into the File name field and select the Microsoft Access databases (*.mdb) file type.

Click [Save].

EPLAN ELECTRIC P8 Basic Training

Add dictionary language

In the Management tab, use [...] to select the dictionary to which you wish to add a dictionary language.

Click (New) next to the Dictionary language field.

EPLAN ELECTRIC P8 Basic Training

One after the other, select all of the languages that should be available in the dictionary.

EPLAN ELECTRIC P8 Basic Training

Delete dictionary language

In the Management tab, use [...] to select the dictionary from which you wish to remove a dictionary language.

Select a language in the Dictionary languages field.

EPLAN ELECTRIC P8 Basic Training

Click (Delete).

EPLAN ELECTRIC P8 Basic Training

Language Translation

Utilities > Translation > Settings

EPLAN ELECTRIC P8 Basic Training

In the project tabs, under display column, select new button

EPLAN ELECTRIC P8 Basic Training

EPLAN ELECTRIC P8 Basic Training

To export full sentences select the Translate whole sentences only check box.

To export individual words deselect the Translate whole sentences only check box.

EPLAN ELECTRIC P8 Basic Training

Exporting missing word

EPLAN ELECTRIC P8 Basic Training

Create a file name, select the location where you want the files to be saved and click Save

Select the language files

EPLAN ELECTRIC P8 Basic Training

Importing Text Into Database

Once you have translate the output files,

Go to Utilities > Translation > Edit Dictionary

EPLAN ELECTRIC P8 Basic Training

Now, under management tab, go to Extra > Import

EPLAN ELECTRIC P8 Basic Training

Select the translated files and click Open.

Select the reference language

EPLAN ELECTRIC P8 Basic Training

Auto Correct / Auto Complete

AutoComplete:

If the check box is selected, words will be automatically completed while you type.

Utilities > Translation > Setting

EPLAN ELECTRIC P8 Basic Training

Under User tab, In the Input column, select AutoComplete

EPLAN ELECTRIC P8 Basic Training

AutoCorrect:

If the check box is selected, all of the words that you have specified in the AutoCorrect tab will be replaced in the first display language by their replacement text.

Utilities > Translation > Setting

EPLAN ELECTRIC P8 Basic Training

Under User tab, In the Input column, select AutoCorrect.

EPLAN ELECTRIC P8 Basic Training