1.0 MATERIALS:
1.1 All materials shall conform to the standards already specified for plaster described above. The preparation of the surface to received the rough cast plaster shall be as described under sand face plaster. Rough cast plaster shall be carried out in two coats. First coat shall consist of 1 part of cement to 3 parts of clean sand or as specified otherwise. The finished thickness of the first coat shall be 12mm. and shall be laid by throwing the mortar (By using strong whipping motion) on the prepared surface with a trowel in a uniform layer but shall not be smooth. The second coat consists of 1 part of cement and 3 part of 6 mm. to 10 mm. down gravel all as approved by the Engineer-in-Charge. The gravel shall thoroughly be got cleaned with water removing all dirt and other organic materials. All these ingredients shall be mixed into a paste which shall be flung upon the first coat with large trowels to form an even protective coat. The second coat must be applied while the first coat is still soft and unset. The thickness of this coat shall be 10 mm. only. Due care shall be taken to avoid concentration of either large size or small size of gravel in one place. A sample of rough cast plaster shall also be got approved by the Engineer-in-Charge as regards the texture etc. before proceeding further with the work. All subsequent work shall generally conform to the approved sample panel. The finished work shall be cured for a minimum period of seven days. 1.2 General workmanship, scaffolding, preparation of surface, curing etc. shall conform to
the specification already laid down under sand faced plastering.
1.3 The contractor shall take special care at the time of plastering or pointing to keep the M. S./aluminium window/wallspan etc. fixed by other agency in correct shape, position and to cover the same with required hessian cloth/gunny bags to keep away from sprinkling of plasters/paint etc. The damage caused to the above if any, shall be made good by the contractor at his own cost.
2.0 MODE OF MEASUREMENT:
2.1 Area of plastering will be measured net and shall be paid for. The measurement of length of wall plastering shall be taken between walls or partitions (dimensions before plastering shall be taken) for the length and from top of the floor or skirting or dado as the case may be to the underside of ceiling for the height. All openings more than 0.1 sqm. shall be deducted and all jambs, soffits, sills of these openings if done, will be measured to arrive to the net area for payment. No opening less than 0.1 sqm. shall be deducted and no jambs etc. for such openings shall be measured for payment. The rate shall include the cost of finishing all the edges, corners, cost of all materials, labours, scaffolding, transport, curing etc.
2.2 The rate shall include the cost of finishing all the edges, corners, cost of all materials, labour, transport, scaffolding, curing etc. and grooves if so specified in the item of schedule of quantities.
2.3 The rate for plastering should include the cost of work towards the following items for co-ordination with electrical item:
2.4 Neatly plastering around DBs, junction boxes, M.S. boxes etc. should be done and made matching with the wall finish after installation of electrical equipments.
2.5 All DBs, service boxes, covers etc. should be covered by a plastic cloth or other suitable covering materials such that water or materials should not splash the same during brick work and plastering work. This is to be done in such a way that electrical equipments as well as painted surfaces are not spoiled.
2.6 For fixing M.S. boxes, DBs etc. Thiyya should be given such that the required face of the M.S. box, DB covers etc inline with final finished plastered surface.
2.7 The rate for the item shall also include rounding up of corner and angles making sharp corners and angles finishing around ceiling rose and electrical fittings etc. fixed by other agencies, finishing of top of dado and skirting (zad finishing), junctions of roof and wall or beam with the finish as specified in the item. Plastering of brick and concrete cornice and copings and plastering in restricted areas if any shall not be measured separately. Architectural bands and narrow widths of plaster over structural as well as non-structural and the line when prepared in the same thickness of plaster shall not be measured separately and shall be covered by respective plaster items.
3.0 ROUGH CAST PLASTER:
3.1 The area of surfaces actually plastered will be measured net and shall be paid for. The measurements of length and height of wall plastered shall be correct to a centimeter taken between walls or projections including the width of corner edge strips including the areas of grooves. All the openings more than 0.1 sqm. shall be deducted and all jambs, soffits and sills of these openings, if plastered will be measured to arrive at the net area for the payment. No opening less than 0.1 sqm. shall be deducted and no jambs etc. for such openings shall be measured for payment. Corner/edges finishing will not be measured separately and the rate shall include the cost of finishing all the edges, corner strips in addition to the cost of all materials, labour, transport, scaffolding, curing etc. and grooves if so specified in the item of schedule of quantities.