• No results found

This step establishes the context of a hypothetical decision problem of evaluating and selecting abatement measures to the fleet of Grieg Shipping Group.

Grieg Shipping Group operates a fleet of 27 ships in total . The standard ship is an open hatch bulk carrier of ca. 47.000 DWT. The company’s vessels are categorized in 9 groups of sister ships where the oldest (A-class) are from 1985 and the newest (K

cargo is mainly wood pulp, rolled paper and other forestry products but the ships also carry a wide range of other unitized cargoes, project cargoes and containers. The main deck is equipped with gantry cranes to load and unload the box shaped h

The Open Hatch trade is based on long term contracts and strong relationships where high quality, efficiency, punctuality and flexibility are necessary to ensure customer satisfaction in the long run.(Grieg, #29)

Figure 16: System model of the ship "Star I

Grieg Shipping Group as a company is known for keeping a high environmental profile and they wish to go beyond regulations to reduce their Green House Gas emissions and comply with their own internal environmental policy. The GHG

Project Department who are made abatement measures.

Given the number of alternative abatement options to choose amongst and the different properties involved for each abatement option, it was decided to

in prioritizing the different abatement options. The objective is to facilitate a clear and constructive discussion between the project department and the board in coming up with a priority list of abatement measures to impleme

of the identified problem context:

MASTER THESIS IN MARINE SYSTEMS DESIGN-SPRING 2010 CONTEXT

the context of a hypothetical decision problem of evaluating and selecting abatement measures to the fleet of Grieg Shipping Group.

operates a fleet of 27 ships in total . The standard ship is an open hatch bulk carrier of ca. 47.000 DWT. The company’s vessels are categorized in 9 groups of sister ships

class) are from 1985 and the newest (K-class) are built in 2009

cargo is mainly wood pulp, rolled paper and other forestry products but the ships also carry a wide range of other unitized cargoes, project cargoes and containers. The main deck is equipped with gantry cranes to load and unload the box shaped holds.

is based on long term contracts and strong relationships where high quality, efficiency, punctuality and flexibility are necessary to ensure customer satisfaction in the

hip "Star Istind"

ompany is known for keeping a high environmental profile and they wish to go beyond regulations to reduce their Green House Gas emissions and comply with their own internal environmental policy. The GHG-reduction plan is then allocated to the company’s oject Department who are made Decision Makers in selecting and implementing emission

Given the number of alternative abatement options to choose amongst and the different properties involved for each abatement option, it was decided to make use of a MCDA technique in prioritizing the different abatement options. The objective is to facilitate a clear and constructive discussion between the project department and the board in coming up with a nt measures to implement . Table 3, on next page, is a systemized scheme

Establishing decision context.

the context of a hypothetical decision problem of evaluating and selecting

operates a fleet of 27 ships in total . The standard ship is an open hatch bulk carrier of ca. 47.000 DWT. The company’s vessels are categorized in 9 groups of sister ships class) are built in 2009-2010. The cargo is mainly wood pulp, rolled paper and other forestry products but the ships also carry a wide range of other unitized cargoes, project cargoes and containers. The main deck is equipped

is based on long term contracts and strong relationships where high quality, efficiency, punctuality and flexibility are necessary to ensure customer satisfaction in the

ompany is known for keeping a high environmental profile and they wish to go beyond regulations to reduce their Green House Gas emissions and comply with their reduction plan is then allocated to the company’s in selecting and implementing emission

Given the number of alternative abatement options to choose amongst and the different MCDA technique in prioritizing the different abatement options. The objective is to facilitate a clear and constructive discussion between the project department and the board in coming up with a is a systemized scheme

Configuration of alternatives

Table 3: Overview of the actual decision problem context

Problem Identify a priority list of abatement measures for the reduction of carbon emissions from the Grieg ships People involved Operation managers, superintendent, project engineers, crew,

ship management, QA-department, purchase dept., board.

Context Project EMISOL, Project Low Carbon Shipping

Time Limited, project duration 6 months with possibility for email and

phone communication. One week at shipowner’s office

What is specified as Result goals

A ranking of preferred abatement measures and a presentation of barriers for implementation

What is specified as Benefit goals

Raising awareness and knowledge of abatement measures to reduce GHG-emissions both towards decision makers and participants in the study.

Identification of alternatives

Brainstorm, discussion, internet searches and finally limited by the cost data availability

Identification of criteria Identified by student and Senior Project Engineer together

Score performance Subjective scores, directly rated by participants, cost data estimation provided by DNV Weighting of criteria Swing rankings made by participants

MASTER THESIS IN MAR

Related documents