Step Operation Results Performed by: Supervised by

In document validation protocol (Page 29-37)

Step Operation Results Performed by: Supervised by

E-cell system regeneration

Stabilize the flow of concentrate:

Inlet Pressure from 0.3 to 0.6 bars Outlet Pressure from 0.3 to 0.6 bars

Manual Yes

No

Date / Sign. Date / Sign.

E-cell system regeneration

Adjust the flow of

purge concentrate Manual Yes

No

Date / Sign. Date / Sign.

E-cell system regeneration

Verification of suitability of flow rates and pressures

Manual Yes

No

Date / Sign. Date / Sign.

E-cell system

regeneration Starting the rectifier Manual Yes

No Date / Sign. Date / Sign.

E-cell system regeneration

Water quality and flow (parameters shown at PLC) are suitable

Manual Yes

No

Date / Sign. Date / Sign.

Normal Start

Press button:

Normal Start Enter Password

Manual

Yes

No Date / Sign. Date / Sign.

Normal Start

Confirm the password for the computer and the

screen

Automatic Yes

No

Date / Sign. Date / Sign.

Normal Start

Message appears:

NORMAL OPERATION

Automatic Yes

No

Date / Sign. Date / Sign.

Normal Start Operation of UV

Lamp Manual Yes

No Date / Sign. Date / Sign.

Normal Start Correct

Pretreatment Cycle Automatic Yes

No

Date / Sign. Date / Sign.

Normal Start Correct

Osmosis Cycle Automatic

Yes

No Date / Sign. Date / Sign.

Normal Start Correct Water Cycle

of Refinement Automatic

Yes

No Date / Sign. Date / Sign.

Normal Start

Correct water return to sanitization and

cleavage tank

Automatic Yes

No

Date / Sign. Date / Sign.

Annex B ERCROS 02/12 Validation Protocol – Rev. 1 Pag. 4 / 8

Alarms Detected:

Date / Signature:

Remarks:

Date / Signature:

Results and conclusion:

Number of Positive responses:

Number of Negative responses:

Conclusion*:

*The test is considered valid only if all the questions are positive.

Performed by:

Date / Signature

Supervised by:

Date / Signature

Annex B ERCROS 02/12 Validation Protocol – Rev. 1 Pag. 5 / 8

TABLE 2

Starting and operating of distribution and sanitization after stoppage

Step Operation Results Performed by: Supervised by

Starting

Verify that all the points of use are

closed. Manual Yes

No

Date Date

Starting

Verified that storage

tank valve is closed. Manual Yes

No

Date Date

Starting

Verify that all the pumping and intaking valves are

closed.

Manual Yes

No

Date Date

Starting

Verify that purifying

system is operation. Manual Yes

No

Date Date

Starting

Verify the availability

of comprised air. Manual Yes

No

Date Date

Starting

Verify the availability

of electric power. Manual Yes

No

Date Date

Starting

Turn off the general switch in the electric

frame. Manual Yes

No

Date Date

Starting

Release emergency

stop. Manual Yes

No

Date Date

Starting

Connect all the switches and fuses

in electric frame. Manual Yes

No

Date Date

Starting Verify screen is on.

Manual Yes

No Date Date

Starting Press button:

CONSIGNAS. Manual Yes

No Date Date

Starting

Verify that operating parameters shown in

the screen are correct and no alarms are shown.

Manual Yes

No

Date Date

Starting

Press button:

AUTOMATICO. Manual Yes

No

Date Date

Starting

Press button:

MARCHA LOOP. Manual Yes

No

Date Date

Starting

Verify that water is entering in storage

tank. Automatic Yes

No

Date Date

Annex B ERCROS 02/12 Validation Protocol – Rev. 1 Pag. 6 / 8

Step Operation Results Performed by: Supervised by

Starting

Verify the correct level of water for

pumping starts. Automatic Yes

No

Date Date

Starting

Pumping system

starts. Automatic Yes

No

Date Date

Starting

Speed of water

return is regulated. Automatic Yes

No

Date Date

Starting UV lamp starts.

Automatic Yes

No Date Date

Starting

Valves at points of use operate

correctly. Automatic Yes

No

Date Date

Starting

Valves at sampling points operate

correctly. Automatic Yes

No

Date Date

Sanitization

Verify the operating program is:

AUTOMATICO Manual Yes

No

Date Date

Sanitization

Verify the system is

operating. Manual Yes

No

Date Date

Sanitization

Verify that no consume is any

point of use. Manual Yes

No

Date Date

Sanitization

Verify availability of cool water and

steam. Manual Yes

No

Date Date

Sanitization

Verify valves at steam entrance;

condenser returns;

cool water entrance and cool water return are open.

Manual Yes

No

Date Date

Sanitization

Start sanitization

program. Manual Yes

No

Date Date

Sanitization Confirmation.

Automatic Yes

No Date Date

Sanitization

Storage tank draining.

Valve in storage tank is in draining

position.

Automatic Yes

No

Date Date

Sanitization UV lamp starts.

Automatic Yes

No Date Date

Annex B ERCROS 02/12 Validation Protocol – Rev. 1 Pag. 7 / 8

ETAPA ACCIÓN CONFORMIDAD REALIZADO VERIFICADO

Sanitization Purge

Automatic Yes

No Date Date

Sanitization Heating

Automatic Yes

No Date Date

Sanitization

Water is maintained hot during

sanitization. Automatic Yes

No

Date Date

Sanitization Purge.

Automatic Yes

No Date Date

Sanitization Cooling.

Automatic Yes

No Date Date

Sanitization

Water is at operating

temperature. Automatic Yes

No

Date Date

Normal operation

Water is available at

every point of use. Automatic Yes

No

Date Date

Annex B ERCROS 02/12 Validation Protocol – Rev. 1 Pag. 8 / 8

Alarms Detected:

Date / Signature:

Remarks:

Date / Signature:

Results and conclusion:

Number of Positive responses:

Number of Negative responses:

Conclusion*:

*The test is considered valid only if all the questions are positive.

Performed by:

Date / Signature

Supervised by:

Date / Signature

Annex C ERCROS 02/12 Validation Protocol – Rev. 1 Pag. 1 / 29

Sampling Control and Data Record

TABLE OF CONTENTS

1. Introduction

2. Sampling record template

3. Analytical data record template

PREPARED BY:

Date and signature

SUPERVISED BY:

Date and signature

APPROVED BY:

Date and signature

Annex C ERCROS 02/12 Validation Protocol – Rev. 1 Pag. 2 / 29

1. INTRODUCTION

A very important part of Performance Qualification step of this purifying water system involves sampling and testing of water along the whole production and distribution.

This annex covers and compiles sampling, codification of samples, acceptance criteria and obtained results.

In table below is summarized considered sampling points; their location their identification and the quality desired in each one.

During the first step of this qualification study, every point listed below should be sampled during 20 days. After this step and whenever no critical deviation or failure of the system occurs, only critical points (marked in bold) will be tested during a whole year of worth data.

Annex C ERCROS 02/12 Validation Protocol – Rev. 1 Pag. 3 / 29

Sampling sketch

Sampling point Identification Location Quality

Purifying Plant

VHB 001 VHB 001 Incoming feed water Potable water

VHD 003 VHD 003 After 1.5 mc microfiltration unit Potable water VHD 007 VHD 007 After reverse osmosis system Osmotic water VHD 010 VHD 010 After electrodesionization

system

Purified water

VHD 011 VHD 011 After UV lamp UVA Purified water

Storage and Distribution

SV 541 001 SV 541 001 After storage tank and before

Intake drainage valve at

DC-0502-00 reactor Purified water DC-0501-00

Reactor PU-4

Level 2.

Intake drainage valve at

DC-0501-00 reactor Purified water DC-0504-00

Reactor PU-3 Level 2.

Intake drainage valve at

DC-0504-00 reactor Purified water DC-0507-00

Reactor PU-2 Level 2.

Intake drainage valve at DC-0507-00 reactor

Purified water

DC-0508-00

Reactor PU-1 Level 2.

Intake drainage valve at

DC-0508-00 reactor Purified water DF-0532-02

DF-0532-03