At FMC Surface Wellhead you can find the balance between the most advanced technology for offshore projects, and years of worldwide field experience executing

In document SurfaceWellheadCatalog Web Copy (Page 60-68)

W e a r e c o n f i d e n t that we can understand your challenge worldwide. Our multina-tional engineering teams and service technicians are deployed and supported global-ly, and most of them have built their experience locally before they came to our engi-neering hubs. Probably your FMC Surface Wellhead engineers will speak your lan-guage and be graduates of engineering schools in your region.

At FMC Surface Wellhead you can find the balance between the most advanced technology for offshore projects, and years of worldwide field experience executing infield drilling programs under time and budget constraints. That makes us feel confident that we can work with our customers and together find the most appropriate specifi-cation for their needs.

F M C S u r f a c e W e l l h e a d h a s t h e

t e c h n o l o g y a n d e x p e r i e n c e t o c o n f i d e n t l y m e e t y o u r n e e d s w o r l d w i d e .

“We are thoroughly satisfied with the reliable solutions and support provided by FMC Energy Systems.

They’ve proven themselves a proac-tive wellhead supplier, committed to performance and safety in helping us

bring our North Sea field onsteam – on time and under budget.”

MAJOR OIL COMPANY

{ }

55

S y s t e m s S o l u t i o n s

S Y S T E M S S O L U T I O N S

E S P S y s t e m

K o m e ( C h a d )

A major oil company faced a substantial logistical challenge when it developed an oil-field in a region of Africa with no established oiloil-field infrastructure and remote from existing shipping channels. This operator wanted the most reliable enhanced-recovery surface wellhead technology on the market for the venture and looked to FMC Energy Systems to provide it. Our company has years of experience throughout Africa and knew the most reliable choice of technology the customer would require in Chad. We recommended a field-proven ESP system, including our industry-standard Model 120 gate valves, HNBR FMC-molded S & FS elastomer seals,

and FMC C22 casing head, another industry standard. Each of these components has delivered at least 15 years’ outstanding field performance.

F e a t u r e s a n d B e n e f i t s

Vertical producer well

Industry-standard FMC C-22 casing head (40 years of field experience)

FMC Model 120 gate valves, 5,000/3,000 psi, Trim AA (20 years’ field experience)

FMC S and FS HNBR interference elastomer seals (15 years’ field experience)

FMC spool tubing type electro-sub and FMC ESP hanger and adapter solutions (30+ years’ field experience)

Allow rapid deployment, suspension and retrieval using standard BOPs, completion procedures and hoisting equipment

Meet all international electric codes and certifications required

Certified to API6A, Appendix F, PR-2 plus additional cycle testing

F H S y s t e m

A l b e r t a ( C a n a d a )

There are moments when the challenge is not the environment, the pressure or the reliability. Shallow, marginal low-pressure well production dictates a very tight budget. The oil company then needs to maximize its use of customer property and to utilize the adequate technology to match its application. There is not extra cash for any luxury beyond the basic requirements. At FMC Surface Wellhead we listened to market situations and decided to develop our FH line with tapered bowl and exclusive elastomer seal design to stay “on budget.”

F e a t u r e s a n d B e n e f i t s

Tapered configuration matching the market needs

Elastomeric seal

Low pressure

Material Trim AA

Pressures up to 2,000 psi

Temperature –50oF to 250oF

57

D r i l l i n g T i m e O p t i m i z a t i o n ( D T O ) S y s t e m

R o c k y M o u n t a i n s ( U n i t e d S t a t e s )

Our customer’s infield drilling program needed to minimize his rig time for multiple shallow wells (with surface casing pressures less than 5,000 psi) and to improve safety. FMC Surface Wellhead’s solution was the DTO®wellhead, which delivers significant time savings by eliminating a number of steps in the traditional drilling process and reducing time required for other steps. The ideal situation for using the DTO would be a single rig that’s drilling multiple consecutive wells by using a common casing program. Each rig is outfitted with a DTO diverter connector fabricated into a diverter riser. The assembly stays with the rig for the drilling project, and it is used on each well. A DTO drilling spool connector is assembled into the rig BOP and is moved with the rig from well to well.

F e a t u r e s a n d B e n e f i t s

Eliminates steps in the drilling process.

Offers time savings during nipple up/down of the BOP’s stack, landing casing hanger and installing the tubing head.

Increases safety by eliminating the need for cutting torches and hammer wrenches.

Locking ring design on drilling spool provides 360 degrees engagement to increase load capacity and reduce fatigue.

Contingency systems for stuck pipe retains system benefits and time savings.

Tests production casing seals prior to removal of BOP.

Load capacity of surface casing hanger exceeds joint strength.

F a s t D r i l l i n g S y s t e m

O h a n e t ( A l g e r i a )

The customer’s priorities were: reducing rig downtime, simplicity of wellhead installation and contingency procedures in place. These parameters and more were met by FMC Energy Systems. For more than 10 years, we’ve supplied this customer with our proprietary simple but rugged Unihead®thru-bore solu-tion. This system is designed to be installed as a single piece, which results in significant time savings during drilling by eliminating the need to nipple down and up BOP stacks. The casing is easy to access in the event pipe is stuck downhole, a feature that eliminates the need for complex casing cutters. The system is so simple that, in the event of logistics problems, it can easily be installed by a competent drilling crew.

F e a t u r e s a n d B e n e f i t s

45º landing shoulders for all mandrel and tubing hangers

Weight set J slot packoffs incorporating FMC S and FS elastomer seals, easy to lock in place using FMC ET lockdown screws

Variety of 13 3/8˝ casing solutions from a thru conductor to FMC Sliploc®

Standard FMC TC-1A-EN tubing hangers for interchangeability – available in both 13˝ and 11˝” configurations for up to 10,000 psi applications

Available in intermediate pressure rating 6,650 psi

S Y S T E M S S O L U T I O N S

F u l l y F e a t u r e d S y s t e m

S a r a w a k ( M a l a y s i a )

This major European-based oil company planned to develop a high-flow-rate, corrosive field in Borneo. Not only does this company uphold the highest standards for safety of crew and environment, but it would be operating in a part of the globe that it had not previously explored. The company came to FMC Energy Systems for its reputation as a worldwide supplier familiar with the Far East and the challenges of working here, and known for the high reliability of our wellhead systems. Energy Systems sales engineers recommended technology appropriate to the highest standard required, a fully featured system with metal-to-metal seals and Speedloc®connections. We knew this would be the best cost-to-risk choice for the customer, who would not have to be concerned about the equipment performance over the life of the field. They also felt such a system would be easier and safer to install and safer over the life of the wells, and that it would save them rig time during installation.

F e a t u r e s a n d B e n e f i t s

Field-proven advanced technology

Metal-to-metal seals

Internal latches

Minimum leak paths to the environment

F u l l y F e a t u r e d S y s t e m

N o r t h S e a ( N o r w a y )

When a major oil company planned to develop a North Sea field, it estimated a 30-year minimum lifetime for the field and projected future production with water cuts and gas penetration. The field would have 12 tie-back wells (predrilled wells from a semi prior to installing the platform) and was planned for production, gas-injection and water-injection wells. Moreover, the field is regulated by strict API6A and NORSOK standards. Needing reliable, flexible, cost-effective drilling and production solutions, this company came to FMC Energy Systems as we are the most experienced well-head supplier in the North Sea for both surface and subsea applications. Our engi-neers proposed a fully featured surface system using thru-bore technology, including proven UWD 15 subsea technology, with the flexibility of switching from production to injection without changing trees. FMC Energy Systems’ Norway operations allow the customer to carry smaller inventories of equipment and parts, short lead time and ready access to engineers and technicians experienced in North Sea operations.

F e a t u r e s a n d B e n e f i t s

Thru-bore system with minimal installation time for risers and BOP. Installation time reduced by implementing field-proven subsea UWD 15 casing hangers and packoffs.

Top-of-the-line materials and cladding assure equipment will last through the life of the well with minimum maintenance and lost production.

Has metal-to-metal seals, UWD 15 technology.

Switch from production to injection without changing out trees.

By having the 18 3/4˝ casing landed in the starting head, the operator can easily change out the 13˝, 9˝ and 7˝ tubing and Unihead®when the well needs slot recovery, workover, etc.

Wireshear actuator on master valve can shear 7/16th braided wire on the tree to

F u l l y F e a t u r e d S y s t e m

C h i n a S e a ( C h i n a )

This project in the China Sea’s Ya Cheng field, which supplies gas energy to Hong Kong, presented the challenges of critical conditions: high corrosive, high temperature, fire resistant, severe weather, large-bore production, high reliability and a long life cycle to reduce the need for workovers. Our state-of-the-art “dry tree” system, the UWD-15, is an excellent example of our quest to design highly reliable wellheads for difficult environments and conditions and still contain costs. Developed out of our subsea wellhead technology, the UWD-15 is a 15,000 psi wellhead that combines advanced technology for high-pressure and hazardous-service environments. All seals are metal-to-metal, with the UWD-15 packoff providing the basis for annular sealing. This packoff does not rely on the tubing hanger weight to energize and can be removed separately from the tubing hanger. It utilizes an SBMS seal at the tubing hanger neck as standard. The seat is recessed to help ensure that the seal contact surface is not damaged when the packoff is installed.

The design includes a fire-safe envelope for the upper master valve to the annulus A.

F e a t u r e s a n d B e n e f i t s

The 15,000 psi wp UWD-15 Wellhead System minimizes leak path to the environment.

Has a metal-to-metal seal, SBMS technology.

Includes internal latch.

Has major connections with Speedloc®.

Offers field-proven advanced technology.

Standard subsea tooling facilitates availability and learning processes.

H i g h - P r e s s u r e G a s S y s t e m

O m a n D e s e r t ( O m a n )

In the desert of Oman, conditions to produce gas are severe to critical.

The equipment needs to have temperature class X and to resist high-corrosive fluids up to 13,000 psi pressure. The operator has one of the highest safety standards in the industry, and he was looking for a local manufacturer. Our multicultural team successfully implemented our equipment while managing the project, and provided support during execution. FMC Surface Wellhead elastomeric seal achieved exactly the customer’s requirement.

F e a t u r e s a n d B e n e f i t s

Has single Unihead system with two-step bowls.

Major connections are comprised of FMC Speedloc-II segmented clamps.

Packoff and tubing hanger assembly utilizes elastomeric sealing technology and internal latch mechanism.

59

S Y S T E M S S O L U T I O N S

H o r i z o n t a l S y s t e m

G u l f o f C a m p e c h e ( M e x i c o )

Injecting 1.2 million cubic feet of nitrogen per day into a formation through a 9˝ bore is a major challenge to face with traditional solu-tions. The limited available height and weight on the platform plus the handling of a 9˝ Christmas tree during installation and workover ruled out a conventional production wellhead solution. Our engineers who have platform working experience understood better than other suppliers the operational challenge, and proposed the first horizontal wellhead tree system of its size in the Gulf of Mexico.

F e a t u r e s a n d B e n e f i t s

Full 9˝ bore system.

Allows workover without removing Christmas tree.

It has hydraulic or pneumatic valves.

Wire Mesh FMC Surface Wellhead seal technology.

Allows drilling through the tubing hanger.

Maximizes platform’s available surface.

S i d e - B y - S i d e ( S X S )

®

S y s t e m

J a v a S e a ( I n d o n e s i a )

Fragmented reservoirs requiring multiple interventions are a major challenge due to the reduced space on platforms, especially when, as in this example, you need to complete (or abandon) wells and perform interventions without disturbing adjacent wells. For such challenges, FMC Surface Wellhead has developed a Side-By-Side (SXS) Wellhead System for optimization of space on new platforms or workovers on existing platforms. The SXS also accommodates configurations involving a combination of single and dual completions inside a single conductor.

F e a t u r e s a n d B e n e f i t s

Allows installing either a 2-in-1 or 3-in-1 well configuration inside a single conductor, sized from 26˝ OD onwards to suit requirements.

Eliminates the need for additional conductor pipe. This creates up-front savings and reduces abandonment costs.

Allows the use of standard drill-bit sizes.

Independent Tubing Heads (Unihead®) allow greatest flexibility in choosing wells to complete or abandon and to perform independent intervention, entry and re-entry without disturbing adjacent wells or flow lines. The wellheads are installed with full BOP protection. This system promotes time saving through batch drilling and drilling with reduced rig move time.

Maximize platform size and the use of well slots on the platform. For existing wells, the SXS wellhead maximizes the use of existing spare well slots.

61

T L P / S P A R S y s t e m

G u l f o f M e x i c o ( U S A )

By far the most experienced suppliers of TLP/SPAR systems in the Gulf of Mexico, we also installed the deepest and most fire-resistant SPAR in the Gulf.

As certain platforms are designed to move with water action, every element connected to the sea floor becomes an integral part of a dynamic system and requires specialized wellhead solutions like our TLP/SPAR systems. From the initial stages of your project, we can help you decide to go with a “wet” or a “dry” tree.

Example: If you’re facing a fragmented reservoir offshore and must execute multiple interventions, economics indicate a surface tree.

FMC Surface Wellhead installed the first TLP/SPAR system in the Gulf of Mexico during the 1980s and has been the leader in this technology since, installing more systems worldwide than our competitors combined.

F e a t u r e s a n d B e n e f i t s

Special slip-lock assembly securely attaches wellhead to riser.

Straight-bore metal seal (SBMS) provides a more secure seal against heavy sideloads that can be generated by wave activity.

More compact profile reduces vertical space requirement.

New tubing head design provides full metal-to-metal seal.

Special plug and lubricator adapter provides easy vertical access to the gas-lift string.

SCSSV and inhibitor lines exit through the upper wellhead connection.

C M - 1 S h a l l o w - W a t e r S y s t e m

B l a c k S e a ( U k r a i n e )

The CM-1 is a subsea tree utilized to complete subsea wells on mudline sus-pension systems. It is expressly designed for marginal field completions with small and fragmented reservoirs in jack-up depths. The CM-1 Tree’s modular design integrates the latest field-proven technology into a simple design that minimizes installation time and reduces total installation costs. The versatility of the system allows the operator to tie back to most mudline systems and casing programs. FMC Surface Wellhead first introduced the CM-1 Tree in 1975.

F e a t u r e s a n d B e n e f i t s

Adapts to any major wellhead manufacturer mudline equipment.

Taps small reservoir and ties back to existing platform.

Diver-installed, modular 3-inch, 10,000 psi working pressure production tree minimizes dives and running trips.

Has 2-inch side annulus access.

Eccentric mandrel-type monobore tubing hanger has four downhole penetrations (configured to operator specifications).

Has direct hydraulic control system.

Has 4-inch, 10,000 psi swivel-flange flowline connection.

Is API Material class FF.

Offers optional downhole or tree chemical-injection methods.

Offers optional pressure and temperature transducers.