Test Your Knowledge

In document SCM230+ SNP (Page 55-65)

1. Supply Network Planning with SAP SCM helps in cross-plant optimization

of .

Fill in the blanks to complete the sentence.

2. You can use SAP SCM to link several OLTP systems to one SCM planning server for cross-system planning of procurement, distribution, and

.

Fill in the blanks to complete the sentence.

3. Which among the following is an SAP ECC master data object in SNP?

Choose the correct answer(s).

□ A Transportation lane

□ B Stock order

□ C Distribution Center

□ D Process model

4. In SCM, transaction data is stored in . Fill in the blanks to complete the sentence.

5. is used for medium to long-term planning across the entire supply chain.

Fill in the blanks to complete the sentence.

6. The allows planners to make

an integrated analysis of supply chain transactional data.

Fill in the blanks to complete the sentence.

7. The can be used for rapid cross-plant distribution and supply planning.

Fill in the blanks to complete the sentence.

8. CTM is an order-based planning method that uses to match demand to supply.

Fill in the blanks to complete the sentence.

9. You can transfer the results of as

planned independent requirements to the OLTP systems.

Fill in the blanks to complete the sentence.

Test Your Knowledge SCM230

10. The final SNP plan consists of purchase requisitions, SNP stock transfers,

and .

Fill in the blanks to complete the sentence.

11. The Integration of with SNP and PP/DS

supports efficient Sales and Operations Planning (SOP).

Fill in the blanks to complete the sentence.

12. During infinite planning, you need to check the availability of capacities in a second step.

Determine whether this statement is true or false.

□ True

□ False

13. A acts as a filter to give users access to frequently used objects. It becomes the basis for executing queries in the Supply Chain Engineer and the Supply Chain Cockpit.

Fill in the blanks to complete the sentence.

14. Supply Network Planning is a bucketed, short-term, cross-plant planning process for planning production outside of the SNP production horizon.

Determine whether this statement is true or false.

□ True

□ False

15. Which SNP planning method involves finite planning based on costs?

Choose the correct answer(s).

□ A Heuristic

□ B CTM

□ C Optimizer

□ D Time Series Propagation

16. Which of the following functions are performed by the TLB?

Choose the correct answer(s).

□ A Determines how inventory should be deployed to distribution centers

□ B Groups together product stock transfers for a transportation planner

□ C Determines how inventory should be deployed to customers

□ D Generates optimized replenishment plans

SCM230 Test Your Knowledge

17. Which of the following are not created by an SNP planning run?

Choose the correct answer(s).

□ A Planned orders

□ B Purchase requisitions

□ C Stock transfer requisitions

□ D Production orders

18. is designed to replenish a customer location with a minimum amount of human intervention.

Fill in the blanks to complete the sentence.

19. When you perform the SNP run using the SNP heuristic, SNP optimization,

or you get a medium-term production

and distribution plan.

Fill in the blanks to complete the sentence.

20. The Integration of with SNP and PP/DS

supports efficient Sales and Operations Planning (SOP).

Fill in the blanks to complete the sentence.

21. During , the availability of capacities and

components required for production is checked when receipts are created.

Fill in the blanks to complete the sentence.

22. You can transfer the results of to an online transaction processing system in the form of production orders.

Fill in the blanks to complete the sentence.

23. Production Planning and Detailed Scheduling is used for short-term, order-based planning within the PP/DS horizon.

Determine whether this statement is true or false.

□ True

□ False

24. The Supply Chain Engineer is used to:

Choose the correct answer(s).

□ A Create supply chain models

□ B Collect alerts in the system

□ C Analyze supply chain data

□ D Create views of supply chain data

Test Your Knowledge SCM230

25. When you perform the SNP run using the SNP heuristic, you get a/an Choose the correct answer(s).

□ A Medium-term production and distribution plan

□ B Demand Plan

□ C Independent requirements plan

□ D Stock transfer order 26. The deployment function in SNP:

Choose the correct answer(s).

□ A Groups together product stock transfers

□ B Determines how and when supply should be deployed to distribution centers

□ C Splits stock orders

□ D Generates sales orders 27. What is the role of the heuristic?

28. Which SNP planning results can be transferred to the OLTP system?

SCM230 Test Your Knowledge

Answers

1. Supply Network Planning with SAP SCM helps in cross-plant optimization of resource utilization.

Answer: resource utilization

2. You can use SAP SCM to link several OLTP systems to one SCM planning server for cross-system planning of procurement, distribution, and

production.

Answer: production

3. Which among the following is an SAP ECC master data object in SNP?

Answer: C

A distribution center is a master data object which is used by SNP and which is transferred as a plant from SAP ECC.

4. In SCM, transaction data is stored in versions.

Answer: versions

5. SNP is used for medium to long-term planning across the entire supply chain.

Answer: SNP

6. The Supply Chain Cockpit allows planners to make an integrated analysis of supply chain transactional data.

Answer: Supply Chain Cockpit

7. The heuristic can be used for rapid cross-plant distribution and supply planning.

Answer: heuristic

8. CTM is an order-based planning method that uses priorities to match demand to supply.

Answer: priorities

Test Your Knowledge SCM230

9. You can transfer the results of Demand Planning as planned independent requirements to the OLTP systems.

Answer: Demand Planning

10. The final SNP plan consists of purchase requisitions, SNP stock transfers, and SNP planned orders.

Answer: SNP planned orders

11. The Integration of Demand Planning with SNP and PP/DS supports efficient Sales and Operations Planning (SOP).

Answer: Demand Planning

12. During infinite planning, you need to check the availability of capacities in a second step.

Answer: False

You need to check the availability of capacities and components required for production during finite planning. Infinite planning does not take the resource load into account.

13. A work area acts as a filter to give users access to frequently used objects. It becomes the basis for executing queries in the Supply Chain Engineer and the Supply Chain Cockpit.

Answer: work area

14. Supply Network Planning is a bucketed, short-term, cross-plant planning process for planning production outside of the SNP production horizon.

Answer: False

Supply Network Planning is used for medium- to long-term planning. The other statements about SNP are true.

SCM230 Test Your Knowledge

15. Which SNP planning method involves finite planning based on costs?

Answer: C

The SNP optimizer is a cost-based, cross-plant planning method that takes into account constraints such as available capacity and materials during the planning run (finite planning).

16. Which of the following functions are performed by the TLB?

Answer: B

The TLB groups stock transfer orders, thus ensuring the most efficient use of transportation capacities.

17. Which of the following are not created by an SNP planning run?

Answer: D

Production orders are not created by an SNP planing run.

18. VMI is designed to replenish a customer location with a minimum amount of human intervention.

Answer: VMI

19. When you perform the SNP run using the SNP heuristic, SNP optimization, or Capable-to-Match you get a medium-term production and distribution plan.

Answer: Capable-to-Match

20. The Integration of Demand Planning with SNP and PP/DS supports efficient Sales and Operations Planning (SOP).

Answer: Demand Planning

21. During finite planning, the availability of capacities and components required for production is checked when receipts are created.

Answer: finite planning

Test Your Knowledge SCM230

22. You can transfer the results of PP/DS to an online transaction processing system in the form of production orders.

Answer: PP/DS

23. Production Planning and Detailed Scheduling is used for short-term, order-based planning within the PP/DS horizon.

Answer: True

24. The Supply Chain Engineer is used to:

Answer: A

The Supply Chain Engineer is used to create supply chain models.

25. When you perform the SNP run using the SNP heuristic, you get a/an Answer: A

When you perform the SNP run using the SNP heuristic, you get a medium-term production and distribution plan.

26. The deployment function in SNP:

Answer: B

The deployment function determines how and when supplies should be deployed to distribution centers and VMI customers.

27. What is the role of the heuristic?

Answer: The heuristic's role is to:

• Plan supply to meet demand without taking into account constraints such as available capacities and materials (infinite planning).

• Plan receipts for purchasing, production, and distribution within the supply network on a cross-plant bucket-oriented basis.

• Synchronize activities and plan the flow of material throughout the supply chain.

SCM230 Test Your Knowledge

28. Which SNP planning results can be transferred to the OLTP system?

Answer: The SNP planning results that can be transferred to the OLTP system are planned orders, purchase requisitions, and stock transport requisitions.

Unit 1: Overview of Supply Network Planning SCM230

Unit 2

Master Data and Transaction Data in