OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 5/31/2013
MODALIDAD: CONTRATA REGION: JUNIN
EJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYO
RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMON
SUPERVISOR ARQ. RAUL HINOSTROZA CANO
PRESUPUESTO ANTERIOR ACTUALAVANCES ACUMULADO SALDO
Partida Descripcion P. Unit. S/. Presup. S/. Metrado Valorizado MetradoS/. ValorizadoS/. Metrado ValorizadoS/.
%
Metrado ValorizadoS/.%
1.00 OBRAS PROVISIONALES
1.00 ESTRUCTURAS
01.01 OBRAS PROVISIONALES
01.01.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA glb 1.00 1,000.00 1,000.00 1.00 1,000.00 0.00 0.00 1.00 1000.00 100.00% 0.00 0.00 0.00% 01.01.02 CARTEL DE OBRA 2.40 x 3.60 m pza 1.00 1,166.91 1,166.91 1.00 1,166.91 0.00 0.00 1.00 1166.91 100.00% 0.00 0.00 0.00% 01.01.03 SERVICIOS HIGIENICOS PROVICIONALES DURANTE LA OBRA glb 1.00 600.00 600.00 1.00 600.00 0.00 0.00 1.00 600.00 100.00% 0.00 0.00 0.00% 01.01.04 AGUA PARA LA CONSTRUCCIÓN glb 1.00 1,500.00 1,500.00 1.00 1,500.00 0.00 0.00 1.00 1500.00 100.00% 0.00 0.00 0.00% 01.01.05 ENERGIA ELECTRICA PROVISIONAL DURANTE LA OBRA glb 1.00 1,500.00 1,500.00 1.00 1,500.00 0.00 0.00 1.00 1500.00 100.00% 0.00 0.00 0.00%
01.02 TRABAJOS PRELIMINARES
01.02.01 TRANSPORTE DE EQUIPO Y MAQUINARIA glb 1.00 1,500.00 1,500.00 1.00 1,500.00 0.00 0.00 1.00 1500.00 100.00% 0.00 0.00 0.00% 01.02.02 DESMONTAJE DE ESTRUCTURAS Y ELEMENTOS EXISTENTES
01.02.02.01 DESMONTAJE TECHO DE ETERNIT/ CALAMINA m2 1,486.56 1.23 1,828.47 1486.56 1,828.47 0.00 0.00 1486.56 1828.47 100.00% 0.00 0.00 0.00% 01.02.02.02 DESMONTAJE DE PUERTAS m2 120.04 3.71 445.35 120.04 445.35 0.00 0.00 120.04 445.35 100.00% 0.00 0.00 0.00% 01.02.02.03 DESMONTAJE DE VENTANAS m2 239.41 2.22 531.49 239.41 531.49 0.00 0.00 239.41 531.49 100.00% 0.00 0.00 0.00% 01.02.02.04 DESMONTAJE DE APARATOS SANITARIOS und 25.00 18.54 463.50 25.00 463.50 0.00 0.00 25.00 463.50 100.00% 0.00 0.00 0.00% 01.02.02.05 DESMONTAJE DE PORTON (3.00 x 2.40 m) und 1.00 83.37 83.37 1.00 83.37 0.00 0.00 1.00 83.37 100.00% 0.00 0.00 0.00% 01.02.02.06 DESMONTAJE DE ESTRUCTURA METÁLICA m2 6.50 17.14 111.41 6.50 111.41 0.00 0.00 6.50 111.41 100.00% 0.00 0.00 0.00% 01.02.02.07 DESMONTAJE TANQUE ELEVADO und 1.00 32.64 32.64 1.00 32.64 0.00 0.00 1.00 32.64 100.00% 0.00 0.00 0.00% 01.02.02.08 DESMONTAJE DE MUROS PRE-FABRICADOS C.A m2 895.72 10.66 9,548.38 895.72 9,548.38 0.00 0.00 895.72 9548.38 100.00% 0.00 0.00 0.00% 01.02.02.09 TALA Y RETIRO DE ARBOLES und 3.00 21.69 65.07 3.00 65.07 0.00 0.00 3.00 65.07 100.00% 0.00 0.00 0.00% 01.02.03 DEMOLICION DE ESTRUCTURAS EXISTENTES
01.02.03.01 DEMOLICIÓN MUROS DE LADRILLO KK C/ MÁQUINA m3 86.49 17.27 1,493.68 86.49 1,493.68 0.00 0.00 86.49 1493.68 100.00% 0.00 0.00 0.00% 01.02.03.02 DEMOLICION DE PISOS (CONTRAPISO Y F. PISO) m2 1,112.17 21.72 24,156.33 1112.17 24,156.33 0.00 0.00 1112.17 24156.33 100.00% 0.00 0.00 0.00% 01.02.03.03 DEMOLICIÓN DE SOBRECIMIENTO m3 34.93 19.01 664.02 34.93 664.02 0.00 0.00 34.93 664.02 100.00% 0.00 0.00 0.00% 01.02.03.04 DEMOLICIÓN DE CIMIENTOS DE CONCRETO m3 157.18 24.91 3,915.35 157.18 3,915.35 0.00 0.00 157.18 3915.35 100.00% 0.00 0.00 0.00% 01.02.03.05 DEMOLICIÓN DE PATIO DE CONCRETO H=0.10 M m2 1,613.68 4.75 7,664.98 1613.68 7,664.98 0.00 0.00 1613.68 7664.98 100.00% 0.00 0.00 0.00% 01.02.03.06 ELIMINACIÓN MATERIAL EXCEDENTE C/ MÁQUINA m3 606.79 23.46 14,235.29 606.79 14,235.29 0.00 0.00 606.79 14235.29 100.00% 0.00 0.00 0.00%
2.00 CULMINACIÓN DE 09 AULAS EXISTENTES - SECUNDARIA
1.00 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES
01.01.01 DESMONTAJE DE ESTRUCTURAS Y ELEMENTOS EXISTENTES
01.01.01.01 DESMONTAJE DE PUERTAS m2 25.20 3.71 93.49 25.20 93.49 0.00 0.00 25.20 93.49 100.00% 0.00 0.00 0.00% 01.01.01.02 RASQUETEO Y DESMANCHADO DE MURO PARA PINTADO m2 692.40 1.58 1,093.99 692.40 1,093.99 0.00 0.00 692.40 1093.99 100.00% 0.00 0.00 0.00% 01.01.01.03 PICADO DE PISO/VEREDA PARA RECIBIR ACABADOS E=2" m2 787.71 3.09 2,434.02 787.71 2,434.02 0.00 0.00 787.71 2434.02 100.00% 0.00 0.00 0.00% 01.01.01.04 LIMPIEZA DE TERRENO MANUAL m2 657.08 1.13 742.50 657.08 742.50 0.00 0.00 657.08 742.50 100.00% 0.00 0.00 0.00%
01.02 MUROS Y TABIQUES DE ALBAÑILERIA
01.02.01 MUROS DE LADRILLO KK TIPO IV SOGA M: 1:1:4 E=1.5 CM m2 53.11 70.65 3,752.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 53.11 3752.22 100.00%
2.00 ARQUITECTURA
02.01. REVOQUES ENLUCIDOS Y MOLDURAS
02.01.01 TARRAJEO EN MURO: INTERIOR Y EXTERIOR m2 36.50 17.15 625.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 36.50 625.98 100.00% 02.01.02 TARRAJEO DE ARISTAS DE COLUMNAS Y VIGAS m 287.36 4.51 1,295.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 287.36 1295.99 100.00% 02.01.03 TARRAJEO FINO EN PIZARRAS m2 57.60 25.67 1,478.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 57.60 1478.59 100.00% 02.01.04 RESANE MUROS INTERIORES m2 142.30 15.76 2,242.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 142.30 2242.65 100.00% 02.01.05 VESTIDURA DE DERRAMES (1:5) m 209.86 11.08 2,325.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 209.86 2325.25 100.00%
02.02. CIELORRASOS
02.02.01 CIELO RASO CON MEZCLA C:A 1:5 m2 57.82 29.73 1,718.99 57.82 1,718.99 0.00 0.00 57.82 1718.99 100.00% 0.00 0.00 0.00%
02.03. PISOS Y PAVIMENTOS
02.03.01 PISO DE CEMENTO PULIDO Y BRUÑADO E=2" COLOREADO m2 640.31 28.98 18,556.18 320.16 9,278.09 0.00 0.00 320.16 9278.09 50.00% 320.16 9278.09 50.00% 02.03.02 PISO DE CEMENTO PULIDO S/ COLOREAR ESCALERAS m2 36.28 29.22 1,060.10 18.14 530.05 0.00 0.00 18.14 530.05 50.00% 18.14 530.05 50.00% 02.03.03 PISO DE CEMENTO PULIDO S/ COLOREAR EN DESCANSO DE ESCALE m2 41.50 23.53 976.50 20.75 488.25 0.00 0.00 20.75 488.25 50.00% 20.75 488.25 50.00% 02.03.04 PISO DE CEMENTO PULIDO Y BRUÑADO E=2" S/COLOREAR m2 69.62 29.22 2,034.30 34.81 1,017.15 0.00 0.00 34.81 1017.15 50.00% 34.81 1017.15 50.00%
02.04. CONTRAZOCALOS
02.04.01 CONTRAZOCALO S/ COLOREAR H=30 cm MZ 1:2 E=1.5 cm m 13.30 10.55 140.32 13.30 140.32 0.00 0.00 13.30 140.32 100.00% 0.00 0.00 0.00%
02.05. CARPINTERIA DE MADERA
02.05.01 PUERTA DE MADERA APANELADA SEGÚN DISEÑO, INCLUYE DE INSTA m2 25.20 153.85 3,877.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.20 3877.02 100.00%
02.06. CARPINTERIA METALICA Y HERRERIA
02.06.01 PASAMANO DE TUBO FºNº DE 2" m 25.00 82.01 2,050.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00 2050.25 100.00%
Unid
CONSORCIO PATROMAQ
VALORIZACION DE OBRA N° 04 - MES DE MAYO 2013
OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 5/31/2013
MODALIDAD: CONTRATA REGION: JUNIN
EJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYO
RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMON
SUPERVISOR ARQ. RAUL HINOSTROZA CANO
PRESUPUESTO ANTERIOR ACTUALAVANCES ACUMULADO SALDO
Partida Descripcion Unid. Metrado P. Unit. S/. Presup. S/. Metrado Valorizado MetradoS/. ValorizadoS/. Metrado ValorizadoS/.
%
Metrado ValorizadoS/.%
02.06.02 BARANDAS METÁLICAS H=1.00 TUBO GALVANIZADO m 16.50 170.88 2,819.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 16.50 2819.52 100.00%
02.07. CERRAJERIA
02.07.01 BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA pza 36.00 6.31 227.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 36.00 227.16 100.00% 02.07.02 CERRADURA P/PUERTA PRINCIPAL DE SOBREPONER und 12.00 80.69 968.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 12.00 968.28 100.00%
02.08. PINTURA
02.08.01 PINTURA EN MUROS INTERIORES Y COLUMNETAS C/ LATEX LAVABLE m2 698.95 8.53 5,962.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 698.95 5962.04 100.00% 02.08.02 PINTURA EN MUROS EXTERIORES Y COLUMNETAS C/ LATEX LAVABLE m2 692.40 8.53 5,906.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 692.40 5906.17 100.00% 02.08.03 PINTURA LATEX 2 MANOS EN CIELORASO m2 764.73 7.90 6,041.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 764.73 6041.37 100.00% 02.08.04 PINTURA LATEX DOS MANOS EN VIGAS Y COLUMNAS m2 515.04 7.61 3,919.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 515.04 3919.45 100.00% 02.08.05 PINTURA LATEX LAVABLE DOS MANOS EN DERRAMES m 290.54 3.22 935.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 290.54 935.54 100.00% 02.08.06 PINTURA ESMALTE SINTETICO EN BRUÑAS m 649.50 3.23 2,097.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 649.50 2097.89 100.00% 02.08.07 PINTURA EN PIZARRA DE CONCRETO EXISTENTE m2 57.60 11.47 660.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 57.60 660.67 100.00% 02.08.08 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 50.40 16.72 842.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.40 842.69 100.00% 02.08.09 PINTURA ESMALTE DOS MANOS EN ZOCALO DE CEMENTO m2 152.69 10.02 1,529.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 152.69 1529.95 100.00% 02.08.10 PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H= m 13.30 1.82 24.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 13.30 24.21 100.00% 02.08.11 PINTURA ANTICORROSIVA Y ESMALTE DOS MANOS - PTA / VENT m2 134.80 10.09 1,360.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 134.80 1360.13 100.00% 3.00 INSTALACIONES ELÉCTRICAS
03.01. SALIDA DE ALUMBRADO
03.01.01 SALIDA DE TECHO ( CENTRO DE LUZ) pto 77.00 82.33 6,339.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 77.00 6339.41 100.00%
03.02. SALIDA PARA TOMACORRIENTE
03.02.01 SALIDA PARA INTERRUPTOR SIMPLE pto 6.00 32.27 193.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 193.62 100.00% 03.02.02 SALIDA PARA INTERRUPTOR DOBLE pto 9.00 34.27 308.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 9.00 308.43 100.00% 03.02.03 SALIDA PARA INTERRUPTOR DE CONMUTACIÓN pto 3.00 40.30 120.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 120.90 100.00% 03.02.04 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC pto 69.00 73.23 5,052.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 69.00 5052.87 100.00%
03.03. CAJAS DE PASO
03.03.01 CAJA DE PASE FºGº 4 X 4 X 2" und 4.00 25.72 102.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 102.88 100.00%
03.04. SISTEMA DE PUESTA A TIERRA
03.04.01 POZO PUESTA A TIERRA (R < 15 Ohms) und 1.00 990.63 990.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 990.63 100.00%
03.05. ELECTRODUCTOS
03.05.01 EXCAVACION DE ZANJAS PARA REDES EXT. SANIT. - ELECT. m3 3.60 19.55 70.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.60 70.38 100.00%
03.05.02 TUBERIA PVC - P 25mm m 60.00 15.61 936.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 60.00 936.60 100.00%
03.05.03 TUBERIA PVC - P 20mm m 385.00 9.66 3,719.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 385.00 3719.10 100.00%
03.06. ALIMENTADORES
03.06.01 CONDUCTOR TW 2.5mm2 m 425.00 8.28 3,519.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 425.00 3519.00 100.00%
03.06.02 CONDUCTOR TW 4.0mm2 m 193.00 8.44 1,628.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 193.00 1628.92 100.00%
03.06.03 CABLE COBRE DESNUDO 1X10 mm2 m 19.50 11.53 224.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 19.50 224.84 100.00%
03.07. TABLEROS DE DISTRIBUCIÓN ELECTRICA
03.07.01 TABLEROS DE DISTRIBUCIÓN CAJA METÁLICA pza 4.00 381.32 1,525.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 1525.28 100.00% 03.07.02 INTERRUPTOR THERMOMAGNETICO 2x15 A pza 6.00 58.99 353.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 353.94 100.00% 03.07.03 INTERRUPTOR THERMOMAGNETICO 2x20 A pza 6.00 61.99 371.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 371.94 100.00% 03.07.04 INTERRUPTOR THERMOMAGNETICO 2x60 A pza 3.00 94.99 284.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 284.97 100.00%
03.08. ARTEFACTOS DE ILUMINACION
03.08.01 ARTEF. FLUOR. 2/40W C/ REJ. MET. EMPOTRADO AF SIMILAR RES-M M und 72.00 72.76 5,238.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 72.00 5238.72 100.00% 03.08.02 ARTEFACTO FLUORESCENTE CIRCULAR DE 32W und 5.00 67.45 337.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 5.00 337.25 100.00% 03.08.03 ARTEFACTO SPOT LIGHT C/ LAPMARA AHORRADORA 13W. und 1.00 42.72 42.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 42.72 100.00%
3.00 SUSTITUCIÓN DE 08 AULAS - PRIMARIA
1.00 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES
01.01.01 TRAZO, NIVELES Y REPLANTEO m2 254.66 2.42 616.28 254.66 616.28 0.00 0.00 254.66 616.28 100.00% 0.00 0.00 0.00% 01.01.02 LIMPIEZA MANUAL DE TERRENO m2 246.66 1.13 278.73 246.66 278.73 0.00 0.00 246.66 278.73 100.00% 0.00 0.00 0.00%
01.02 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACIÓN DE ZANJAS Y ZAPATA RT<2 kg/cm2 H=1.30 M m3 152.51 27.92 4,258.08 152.51 4,258.08 0.00 0.00 152.51 4258.08 100.00% 0.00 0.00 0.00% 01.02.02 RELLENO COMPACTADO C/EQ. MAT./ PROPIO m3 37.31 19.91 742.84 37.31 742.84 0.00 0.00 37.31 742.84 100.00% 0.00 0.00 0.00% 01.02.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES m3 115.20 16.28 1,875.46 115.20 1,875.46 0.00 0.00 115.20 1875.46 100.00% 0.00 0.00 0.00% 01.02.04 ELIMINACIÓN MATERIAL EXCEDENTE ACARREADO m3 149.77 21.03 3,149.66 149.77 3,149.66 0.00 0.00 149.77 3149.66 100.00% 0.00 0.00 0.00% 01.02.05 NIVELACIÓN INTERIOR Y APISONADO PARA F.PISO, PATIO Y VEREDAS m2 203.70 3.82 778.13 0.00 0.00 203.70 778.13 203.70 778.13 100.00% 0.00 0.00 0.00% 01.02.06 AFIRMADO DE 4" PARA PISOS, PATIOS, VEREDAS COMPACTADO. m2 330.69 12.27 4,057.57 0.00 0.00 330.69 4057.57 330.69 4057.57 100.00% 0.00 0.00 0.00%
VALORIZACION DE OBRA N° 04 - MES DE MAYO 2013
OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 5/31/2013
MODALIDAD: CONTRATA REGION: JUNIN
EJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYO
RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMON
SUPERVISOR ARQ. RAUL HINOSTROZA CANO
PRESUPUESTO ANTERIOR ACTUALAVANCES ACUMULADO SALDO
Partida Descripcion Unid. Metrado P. Unit. S/. Presup. S/. Metrado Valorizado MetradoS/. ValorizadoS/. Metrado ValorizadoS/.
%
Metrado ValorizadoS/.%
01.03. OBRAS DE CONCRETO SIMPLE
01.03.01 BASES
01.03.01.01 SOLADO E=4" MEZCLA 1:10 C:H INC. CURADO m2 51.44 26.90 1,383.74 51.44 1,383.74 0.00 0.00 51.44 1383.74 100.00% 0.00 0.00 0.00% 01.03.01.02 CIMIENTOS CORRIDOS 1:10 + 30% P.G F´>=100 kg/cm2 m3 21.71 177.95 3,863.29 21.71 3,863.29 0.00 0.00 21.71 3863.29 100.00% 0.00 0.00 0.00% 01.03.01.03 CIMIENTOS ENCOFRADO Y DESENCOFRADO m2 86.82 33.07 2,871.14 86.82 2,871.14 0.00 0.00 86.82 2871.14 100.00% 0.00 0.00 0.00% 01.03.02 SOBRECIMIENTOS
01.03.02.01 SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M F´c >= 100 kg/cm2 m3 5.75 237.78 1,367.24 0.00 0.00 5.75 1367.24 5.75 1367.24 100.00% 0.00 0.00 0.00% 01.03.02.02 SOBRECIMEINTO, ENCOFRADO Y DESENCOFRADO m2 75.81 27.90 2,115.10 0.00 0.00 75.81 2115.10 75.81 2115.10 100.00% 0.00 0.00 0.00% 01.03.02.03 FALSO PISO MEZCLA 1.8 E=4" m2 203.70 30.01 6,113.04 0.00 0.00 203.70 6113.04 203.70 6113.04 100.00% 0.00 0.00 0.00%
01.04. OBRAS DE CONCRETO ARMADO
01.04.01 ZAPATAS
01.04.01.01 ZAPATAS - CONCRETO 210 kg/cm2 m3 28.00 325.75 9,121.00 0.00 0.00 28.00 9121.00 28.00 9121.00 100.00% 0.00 0.00 0.00% 01.04.01.02 ZAPATAS, ENCOFRADO Y DESENCOFRADO m2 96.32 44.53 4,289.13 96.32 4,289.13 0.00 0.00 96.32 4289.13 100.00% 0.00 0.00 0.00% 01.04.01.03 ZAPATAS - ACERO Fy=4200 kg/cm2 kg 721.92 4.46 3,219.76 721.92 3,219.76 0.00 0.00 721.92 3219.76 100.00% 0.00 0.00 0.00% 01.04.02 VIGAS DE CONEXIÓN
01.04.02.01 VIGAS DE CONEXIÓN - CONCRETO 210 kg/cm2 m3 12.95 297.67 3,854.83 0.00 0.00 12.95 3854.83 12.95 3854.83 100.00% 0.00 0.00 0.00% 01.04.02.02 VIGAS DE CONEXIÓN - ENCOFRADO Y DESENCOFRADO m2 103.56 41.28 4,274.96 103.56 4,274.96 0.00 0.00 103.56 4274.96 100.00% 0.00 0.00 0.00% 01.04.02.03 VIGAS DE CONEXIÓN - ACERO Fy=4200 kg/cm2 kg 828.38 4.46 3,694.57 828.38 3,694.57 0.00 0.00 828.38 3694.57 100.00% 0.00 0.00 0.00% 01.04.03 COLUMNAS
01.04.03.01 COLUMNAS - CONCRETO 210 kg/cm2 - 1 PISO m3 13.01 419.86 5,462.38 0.00 0.00 13.01 5462.38 13.01 5462.38 100.00% 0.00 0.00 0.00% 01.04.03.02 COLUMNAS - CONCRETO 210 kg/cm2 - 2 PISO m3 11.44 425.84 4,871.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 11.44 4871.61 100.00% 01.04.03.03 COLUMNAS - ENCOFRADO Y DESENCOFRADO m2 279.30 47.49 13,263.96 0.00 0.00 167.58 7958.37 167.58 7958.37 60.00% 111.72 5305.58 40.00% 01.04.03.04 COLUMNAS - ACERO Fy=4200 kg/cm2 kg 5,365.26 4.46 23,929.06 3219.16 14,357.44 0.00 0.00 3219.16 14357.44 60.00% 2146.10 9571.62 40.00% 01.04.04 COLUMNETAS
01.04.04.01 COLUMNETAS - CONCRETO 175 kg/cm2 - 1 PISO m3 4.50 378.56 1,703.52 0.00 0.00 2.25 851.76 2.25 851.76 50.00% 2.25 851.76 50.00% 01.04.04.02 COLUMNETAS - CONCRETO 175 kg/cm2 - 2 PISO m3 5.22 380.64 1,986.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 5.22 1986.94 100.00% 01.04.04.03 COLUMNETAS - ENCOFRADO Y DESENCOFRADO m2 168.22 43.77 7,362.99 0.00 0.00 84.11 3681.49 84.11 3681.49 50.00% 84.11 3681.49 50.00% 01.04.04.04 COLUMNETAS - ACERO Fy=4200 kg/cm2 kg 459.26 4.46 2,048.30 229.63 1,024.15 0.00 0.00 229.63 1024.15 50.00% 229.63 1024.15 50.00% 01.04.05 VIGAS
01.04.05.01 VIGAS - CONCRETO 210 kg/cm2 - 1 PISO m3 16.73 356.11 5,957.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 16.73 5957.72 100.00% 01.04.05.02 VIGAS - CONCRETO 210 kg/cm2 - 2 PISOS m3 16.68 360.05 6,005.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 16.68 6005.63 100.00% 01.04.05.03 VIGAS - ENCOFRADO Y DESENCOFRADO m2 309.26 51.08 15,797.00 0.00 0.00 154.63 7898.50 154.63 7898.50 50.00% 154.63 7898.50 50.00% 01.04.05.04 VIGAS - ACERO Fy=4200 kg/cm2 kg 5,345.06 4.46 23,838.97 0.00 0.00 2672.53 11919.48 2672.53 11919.48 50.00% 2672.53 11919.48 50.00% 01.04.06 VIGAS DE CONFINAMIENTO
01.04.06.01 VIGAS - CONCRETO 175 kg/cm2 - 1 PISO m3 0.69 285.80 197.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.69 197.20 100.00% 01.04.06.02 VIGAS - CONCRETO 175 kg/cm2 - 2 PISOS m3 1.26 291.18 366.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.26 366.89 100.00% 01.04.06.03 VIGAS CONF. - ENCOFRADO Y DESENCOFRADO m2 30.16 51.08 1,540.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 30.16 1540.57 100.00% 01.04.06.04 VIGAS CONF. - ACERO Fy=4200 kg/cm2 kg 173.66 4.46 774.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 173.66 774.52 100.00% 01.04.07 LOSAS ALIGERADAS H=20 cm y 17 cm
01.04.07.01 LOSA ALIGERADA - CONCRETO 210 kg/cm2 - 1 y 2 PISO m3 62.14 337.29 20,959.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 62.14 20959.20 100.00% 01.04.07.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO m2 599.42 31.07 18,623.98 0.00 0.00 299.71 9311.99 299.71 9311.99 50.00% 299.71 9311.99 50.00% 01.04.07.03 LOSA ALIGERADA - LADRILLO HUECO 15x30x30 und 5,394.78 3.43 18,504.10 0.00 0.00 2697.39 9252.05 2697.39 9252.05 50.00% 2697.39 9252.05 50.00% 01.04.07.04 LOSA ALIGERADA - ACERO Fy=4200 kg/cm2 kg 3,234.88 4.46 14,427.56 0.00 0.00 1617.44 7213.78 1617.44 7213.78 50.00% 1617.44 7213.78 50.00% 01.04.08 ESCALERAS
01.04.08.01 ESCALERA CONCRETO 210 kg/cm2 m3 4.14 408.81 1,692.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.14 1692.47 100.00% 01.04.08.02 ESCALERAS - ENCOFRADO Y DESENCOFRADO m2 25.24 66.15 1,669.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.24 1669.63 100.00% 01.04.08.03 ESCALERAS - ACERO Fy=4200 kg/cm2 kg 430.64 4.46 1,920.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 430.64 1920.65 100.00% 01.04.09 MUROS Y TABIQUES DE ALBAÑILERIA
01.04.09.01 MUROS DE LADRILLO KK TIPO IV SOGA M: 1:1:4 E=1.5 CM m2 684.10 70.65 48,331.67 0.00 0.00 375.27 26512.83 375.27 26512.83 54.86% 308.83 21818.84 45.14% 01.04.09.02 ALAMBRE #8 REFUERZO HORIZONTAL EN MUROS kg 41.16 4.76 195.92 0.00 0.00 20.58 97.96 20.58 97.96 50.00% 20.58 97.96 50.00%
2.00 ARQUITECTURA
02.01. REVOQUES ENLUCIDOS Y MOLDURAS
02.01.01 TARRAJEO EN MURO: INTERIOR Y EXTERIOR m2 1,368.20 17.15 23,464.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1368.20 23464.63 100.00%
02.01.02 TARRAJEO DE COLUMNAS m2 447.52 26.89 12,033.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 447.52 12033.81 100.00%
02.01.03 TARRAJEO DE VIGAS m2 339.42 39.63 13,451.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 339.42 13451.21 100.00%
02.01.04 TARRAJEO FINO EN PIZARRAS m2 51.20 25.67 1,314.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 51.20 1314.30 100.00% 02.01.05 VESTIDURA DE DERRAMES (1:5) m 115.95 11.08 1,284.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 115.95 1284.73 100.00%
CONSORCIO PATROMAQ
VALORIZACION DE OBRA N° 04 - MES DE MAYO 2013
OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 5/31/2013
MODALIDAD: CONTRATA REGION: JUNIN
EJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYO
RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMON
SUPERVISOR ARQ. RAUL HINOSTROZA CANO
PRESUPUESTO ANTERIOR ACTUALAVANCES ACUMULADO SALDO
Partida Descripcion Unid. Metrado P. Unit. S/. Presup. S/. Metrado Valorizado MetradoS/. ValorizadoS/. Metrado ValorizadoS/.
%
Metrado ValorizadoS/.%
02.01.06 BRUÑAS SEGUN DETALLE (1 X 1 cm) m 1,525.26 4.35 6,634.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1525.26 6634.88 100.00%
02.02. CIELORRASOS
02.02.01 VESTIDURA EN FONDO DE ESCALERAS m2 11.15 28.33 315.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 11.15 315.88 100.00% 02.02.02 CIELO RASO CON MEZCLA C:A 1:5 m2 599.42 29.73 17,820.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 599.42 17820.76 100.00%
02.03. PISOS Y PAVIMENTOS
02.03.01 CONTRAPISO DE 40 mm m2 467.64 21.55 10,077.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 467.64 10077.64 100.00%
02.03.02 PISO DE CEMENTO PULIDO Y BRUÑADO E=2" COLOREADO m2 467.64 28.98 13,552.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 467.64 13552.21 100.00% 02.03.03 VEREDA DE CONCRETO 175 kg/cm2 E=4" m2 126.99 44.71 5,677.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 126.99 5677.72 100.00% 02.03.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 19.99 103.16 2,062.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 19.99 2062.17 100.00%
02.04. REVESTIMIENTOS
02.04.01 REVESTIMIENTO C/ CEMENTO PULIDO PASO Y CONTRAPASO m2 74.00 25.39 1,878.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 74.00 1878.86 100.00% 02.04.02 ACABADO DE DESCANSO CEMENTO PULIDO Y BRUÑADO m2 7.79 23.53 183.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 7.79 183.30 100.00%
02.05. CONTRAZOCALOS
02.05.01 CONTRAZOCALO S/ COLOREAR H=20cm MZ 1:2 E=1.5 cm m2 361.25 8.71 3,146.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 361.25 3146.49 100.00%
02.06. CARPINTERIA DE MADERA
02.06.01 PUERTA DE MADERA APANELADA SEGÚN DISEÑO, INCLUYE DE INSTA m2 17.20 153.85 2,646.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 17.20 2646.22 100.00%
02.07. CARPINTERIA METALICA Y HERRERIA
02.07.01 VENTANA METÁLICA SEG. DISEÑO INC. INSTALACIÓN m2 106.60 144.61 15,415.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 106.60 15415.43 100.00% 02.07.02 PASAMANO DE TUBO FºNº DE 2" m 8.40 82.01 688.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.40 688.88 100.00% 02.07.03 BARANDAS METÁLICAS H=1.00 TUBO GALVANIZADO m 7.98 170.88 1,363.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 7.98 1363.62 100.00% 02.07.04 CANTONERA DE FIERRO EN ESCALERA m 37.00 23.26 860.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 37.00 860.62 100.00%
02.08. CERRAJERIA
02.08.01 BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA pza 24.00 6.31 151.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 24.00 151.44 100.00% 02.08.02 CERRADURA P/PUERTA PRINCIPAL DE SOBREPONER und 8.00 80.69 645.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.00 645.52 100.00%
02.09. VIDRIOS, CRISTALES Y SIMILARES
02.09.01 VIDRIOS SEMIDOBLES IMPORTADOS p2 1,145.95 3.99 4,572.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1145.95 4572.34 100.00%
02.10. PINTURA
02.10.01 PINTURA EN MUROS INTERIORES Y COLUMNETAS C/ LATEX LAVABLE m2 684.10 8.53 5,835.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 684.10 5835.37 100.00% 02.10.02 PINTURA EN MUROS EXTERIORES Y COLUMNETAS C/ LATEX LAVABLE m2 569.87 8.53 4,860.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 569.87 4860.99 100.00% 02.10.03 PINTURA LATEX 2 MANOS EN CIELORASO m2 610.57 7.90 4,823.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 610.57 4823.50 100.00% 02.10.04 PINTURA LATEX DOS MANOS EN VIGAS Y COLUMNAS m2 786.94 7.61 5,988.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 786.94 5988.61 100.00% 02.10.05 PINTURA LATEX LAVABLE DOS MANOS EN DERRAMES m 115.95 3.22 373.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 115.95 373.36 100.00% 02.10.06 PINTURA ESMALTE SINTETICO EN BRUÑAS m 1,525.26 3.23 4,926.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1525.26 4926.59 100.00% 02.10.07 PINTURA EN PIZARRA DE CONCRETO m2 51.20 11.47 587.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 51.20 587.26 100.00% 02.10.08 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 34.40 16.72 575.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 34.40 575.17 100.00% 02.10.09 PINTURA ANTICORROSIVA Y ESMALTE EN BARANDAS m 7.98 5.49 43.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 7.98 43.81 100.00% 02.10.10 PINTURA ANTICORROSIVA ESMALTE DOS MANOS EN TUBERIAS 2" m 8.40 2.60 21.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.40 21.84 100.00% 02.10.11 PINTURA ESMALTE DOS MANOS EN ZOCALO DE CEMENTO m2 114.23 10.02 1,144.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 114.23 1144.58 100.00% 02.10.12 PINTURA ANTICORROSIVA Y ESMALTE DOS MANOS - PTA / VENT m2 106.60 9.46 1,008.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 106.60 1008.44 100.00%
02.11. CUBIERTAS
02.11.01 COBERTURA CON TEJA ANDINA INDUSTRIAL m2 393.07 38.46 15,117.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 393.07 15117.47 100.00% 02.11.02 CUMBRERA DE TEJA ANDINA INDUSTRIAL m 38.65 47.21 1,824.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 38.65 1824.67 100.00%
02.12. VARIOS, LIMPIEZA Y JARDINERIA
02.12.01 JUNTA DE DILITACION RELLENO CON MORTERO ASFALTICO E= 1´ m 33.60 6.64 223.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 33.60 223.10 100.00% 02.12.02 JUNTA DE DILATACION CON ESPUMA PLASTICA + JEBE MICROPOROS m 28.00 7.45 208.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 28.00 208.60 100.00%
02.12.03 LIMPIEZA FINAL DE OBRA m2 254.66 2.80 713.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 254.66 713.05 100.00%
3.00 INSTALACIONES ELÉCTRICAS
03.01. SALIDA DE ALUMBRADO
03.01.01 SALIDA DE TECHO ( CENTRO DE LUZ) pto 53.00 82.33 4,363.49 0.00 0.00 26.00 2140.58 26.00 2140.58 49.06% 27.00 2222.91 50.94%
03.02. SALIDA PARA TOMACORRIENTE
03.02.01 SALIDA PARA INTERRUPTOR SIMPLE pto 19.00 32.27 613.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 19.00 613.13 100.00% 03.02.02 SALIDA PARA INTERRUPTOR DOBLE pto 8.00 34.27 274.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.00 274.16 100.00% 03.02.03 SALIDA PARA INTERRUPTOR DE CONMUTACIÓN pto 2.00 40.30 80.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 80.60 100.00% 03.02.04 SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA pto 41.00 93.08 3,816.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 41.00 3816.28 100.00%
03.03. CAJAS DE PASO
03.03.01 CAJA DE PASE FºGº 4 X 4 X 2" und 3.00 25.72 77.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 77.16 100.00%
VALORIZACION DE OBRA N° 04 - MES DE MAYO 2013
OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 5/31/2013
MODALIDAD: CONTRATA REGION: JUNIN
EJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYO
RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMON
SUPERVISOR ARQ. RAUL HINOSTROZA CANO
PRESUPUESTO ANTERIOR ACTUALAVANCES ACUMULADO SALDO
Partida Descripcion Unid. Metrado P. Unit. S/. Presup. S/. Metrado Valorizado MetradoS/. ValorizadoS/. Metrado ValorizadoS/.
%
Metrado ValorizadoS/.%
03.04.01 POZO PUESTA A TIERRA (R < 15 Ohms) und 1.00 990.63 990.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 990.63 100.00%
03.05. ELECTRODUCTOS
03.05.01 EXCAVACION DE ZANJAS PARA REDES EXT. SANIT. - ELECT. m3 3.00 19.55 58.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 58.65 100.00%
03.05.02 TUBERIA PVC - P 25mm m 50.00 15.61 780.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 780.50 100.00%
03.05.03 TUBERIA PVC - P 20mm m 352.00 9.66 3,400.32 0.00 0.00 176.00 1700.16 176.00 1700.16 50.00% 176.00 1700.16 50.00%
03.06. ALIMENTADORES
03.06.01 CONDUCTOR TW 2.5mm2 m 389.50 8.28 3,225.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 389.50 3225.06 100.00%
03.06.02 CONDUCTOR TW 4.0mm2 m 156.40 8.44 1,320.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 156.40 1320.02 100.00%
03.06.03 CABLE COBRE DESNUDO 1X10 mm2 m 7.50 11.53 86.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 7.50 86.48 100.00%
03.07. TABLEROS DE DISTRIBUCIÓN ELECTRICA
03.07.01 TABLEROS DE DISTRIBUCIÓN CAJA METÁLICA pza 3.00 381.32 1,143.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 1143.96 100.00% 03.07.02 INTERRUPTOR THERMOMAGNETICO 2x15 A pza 3.00 58.99 176.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 176.97 100.00% 03.07.03 INTERRUPTOR THERMOMAGNETICO 2x20 A pza 4.00 61.99 247.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 247.96 100.00% 03.07.04 INTERRUPTOR THERMOMAGNETICO 2x60 A pza 3.00 94.99 284.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 284.97 100.00%
03.08. ARTEFACTOS DE ILUMINACION
03.08.01 ARTEF. FLUOR. 2/40W C/ REJ. MET. EMPOTRADO AF SIMILAR RES-M M und 50.00 72.76 3,638.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 50.00 3638.00 100.00% 03.08.02 ARTEFACTO FLUORESCENTE CIRCULAR DE 32W und 3.00 67.45 202.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 202.35 100.00% 4.00 INSTALACIONES SANITARIAS
04.01. DRENAJE DE AGUAS PLUVIALES
04.01.01 CANALETA DE FIERRO GALVANIZADO m 77.30 22.36 1,728.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 77.30 1728.43 100.00% 04.01.02 TUBERIA DE BAJADA PVC SAL 3" P/ LLUVIAS m 96.00 23.54 2,259.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 96.00 2259.84 100.00%
4.00
1.00 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES
01.01.01 TRAZO, NIVELES Y REPLANTEO m2 200.00 2.42 484.00 0.00 0.00 200.00 484.00 200.00 484.00 100.00% 0.00 0.00 0.00%
01.02 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACIÓN DE ZANJAS Y ZAPATA RT<2 kg/cm2 H=1.30 M m3 126.10 27.92 3,520.71 0.00 0.00 126.10 3520.71 126.10 3520.71 100.00% 0.00 0.00 0.00% 01.02.02 RELLENO COMPACTADO C/EQ. MAT./ PROPIO m3 22.32 19.91 444.39 0.00 0.00 22.32 444.39 22.32 444.39 100.00% 0.00 0.00 0.00% 01.02.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES m3 104.59 16.28 1,702.73 0.00 0.00 104.59 1702.73 104.59 1702.73 100.00% 0.00 0.00 0.00% 01.02.04 ELIMINACIÓN MATERIAL EXCEDENTE ACARREADO m3 135.96 21.03 2,859.24 0.00 0.00 135.96 2859.24 135.96 2859.24 100.00% 0.00 0.00 0.00% 01.02.05 NIVELACIÓN INTERIOR Y APISONADO PARA F.PISO, PATIO Y VEREDAS m2 172.26 3.82 658.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 172.26 658.03 100.00% 01.02.06 AFIRMADO DE 4" PARA PISOS, PATIOS, VEREDAS COMPACTADO. m2 286.22 12.27 3,511.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 286.22 3511.92 100.00%
01.03. OBRAS DE CONCRETO SIMPLE
01.03.01 BASES
01.03.01.01 SOLADO E=4" MEZCLA 1:10 C:H INC. CURADO m2 42.13 26.90 1,133.30 0.00 0.00 42.13 1133.30 42.13 1133.30 100.00% 0.00 0.00 0.00% 01.03.01.02 CIMIENTOS CORRIDOS 1:10 + 30% P.G F´>=100 kg/cm2 m3 20.69 177.95 3,681.79 0.00 0.00 20.69 3681.79 20.69 3681.79 100.00% 0.00 0.00 0.00% 01.03.01.03 CIMIENTOS ENCOFRADO Y DESENCOFRADO m2 83.00 33.07 2,744.81 0.00 0.00 83.00 2744.81 83.00 2744.81 100.00% 0.00 0.00 0.00% 01.03.02 SOBRECIMIENTOS
01.03.02.01 SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M F´c >= 100 kg/cm2 m3 4.90 237.78 1,165.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.90 1165.12 100.00% 01.03.02.02 SOBRECIMEINTO, ENCOFRADO Y DESENCOFRADO m2 65.21 27.90 1,819.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 65.21 1819.36 100.00% 01.03.02.03 FALSO PISO MEZCLA 1.8 E=4" m2 172.26 30.01 5,169.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 172.26 5169.52 100.00%
01.04. OBRAS DE CONCRETO ARMADO
01.04.01 ZAPATAS
01.04.01.01 ZAPATAS - CONCRETO 210 kg/cm2 m3 25.39 325.75 8,270.79 0.00 0.00 25.39 8270.79 25.39 8270.79 100.00% 0.00 0.00 0.00% 01.04.01.02 ZAPATAS, ENCOFRADO Y DESENCOFRADO m2 70.86 44.53 3,155.40 0.00 0.00 70.86 3155.40 70.86 3155.40 100.00% 0.00 0.00 0.00% 01.04.01.03 ZAPATAS - ACERO Fy=4200 kg/cm2 kg 455.92 4.46 2,033.40 0.00 0.00 455.92 2033.40 455.92 2033.40 100.00% 0.00 0.00 0.00% 01.04.02 VIGAS DE CONEXIÓN
01.04.02.01 VIGAS DE CONEXIÓN - CONCRETO 210 kg/cm2 m3 10.65 297.67 3,170.19 0.00 0.00 10.65 3170.19 10.65 3170.19 100.00% 0.00 0.00 0.00% 01.04.02.02 VIGAS DE CONEXIÓN - ENCOFRADO Y DESENCOFRADO m2 85.22 41.28 3,517.88 0.00 0.00 85.22 3517.88 85.22 3517.88 100.00% 0.00 0.00 0.00% 01.04.02.03 VIGAS DE CONEXIÓN - ACERO Fy=4200 kg/cm2 kg 762.11 4.46 3,399.01 0.00 0.00 762.11 3399.01 762.11 3399.01 100.00% 0.00 0.00 0.00% 01.04.03 COLUMNAS
01.04.03.01 COLUMNAS - CONCRETO 210 kg/cm2 - 1 PISO m3 10.85 419.86 4,555.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.85 4555.48 100.00% 01.04.03.02 COLUMNAS - CONCRETO 210 kg/cm2 - 2 PISO m3 9.26 425.84 3,943.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 9.26 3943.28 100.00% 01.04.03.03 COLUMNAS - ENCOFRADO Y DESENCOFRADO m2 234.00 47.49 11,112.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 234.00 11112.66 100.00% 01.04.03.04 COLUMNAS - ACERO Fy=4200 kg/cm2 kg 4,179.57 4.46 18,640.88 0.00 0.00 2831.21 12627.20 2831.21 12627.20 67.74% 1348.36 6013.69 32.26% 01.04.04 COLUMNETAS
01.04.04.01 COLUMNETAS - CONCRETO 175 kg/cm2 - 1 PISO m3 3.74 378.56 1,415.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.74 1415.81 100.00%
CONSTRUC. DE 01 LABORATORIO DE CIENCIA, TECNOLOGÍA Y AMBIENTE, 01 SUM EN 1ER NIVEL; Y SUSTITUCIÓN DE 01 CENTRO DE COMPUTO Y DE AMBIENTES ADMINIST. EN 2DO NIVEL
CONSORCIO PATROMAQ
VALORIZACION DE OBRA N° 04 - MES DE MAYO 2013
OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 5/31/2013
MODALIDAD: CONTRATA REGION: JUNIN
EJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYO
RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMON
SUPERVISOR ARQ. RAUL HINOSTROZA CANO
PRESUPUESTO ANTERIOR ACTUALAVANCES ACUMULADO SALDO
Partida Descripcion Unid. Metrado P. Unit. S/. Presup. S/. Metrado Valorizado MetradoS/. ValorizadoS/. Metrado ValorizadoS/.
%
Metrado ValorizadoS/.%
01.04.04.02 COLUMNETAS - CONCRETO 175 kg/cm2 - 2 PISO m3 3.50 380.64 1,332.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.50 1332.24 100.00% 01.04.04.03 COLUMNETAS - ENCOFRADO Y DESENCOFRADO m2 125.65 43.77 5,499.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 125.65 5499.70 100.00% 01.04.04.04 COLUMNETAS - ACERO Fy=4200 kg/cm2 kg 725.93 4.46 3,237.65 0.00 0.00 362.97 1618.82 362.97 1618.82 50.00% 362.97 1618.82 50.00% 01.04.05 VIGAS
01.04.05.01 VIGAS - CONCRETO 210 kg/cm2 - 1 PISO m3 13.26 356.11 4,722.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 13.26 4722.02 100.00% 01.04.05.02 VIGAS - CONCRETO 210 kg/cm2 - 2 PISOS m3 13.32 360.05 4,795.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 13.32 4795.87 100.00% 01.04.05.03 VIGAS - ENCOFRADO Y DESENCOFRADO m2 184.21 51.08 9,409.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 184.21 9409.45 100.00% 01.04.05.04 VIGAS - ACERO Fy=4200 kg/cm2 kg 3,756.07 4.46 16,752.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3756.07 16752.07 100.00% 01.04.06 VIGAS DE CONFINAMIENTO
01.04.06.01 VIGAS - CONCRETO 175 kg/cm2 - 1 PISO m3 0.58 285.80 165.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.58 165.76 100.00% 01.04.06.02 VIGAS - CONCRETO 175 kg/cm2 - 2 PISOS m3 0.95 291.18 276.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.95 276.62 100.00% 01.04.06.03 VIGAS CONF. - ENCOFRADO Y DESENCOFRADO m2 23.38 51.08 1,194.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 23.38 1194.25 100.00% 01.04.06.04 VIGAS CONF. - ACERO Fy=4200 kg/cm2 kg 691.36 4.46 3,083.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 691.36 3083.47 100.00% 01.04.07 LOSAS ALIGERADAS H=20 cm y 17 cm
01.04.07.01 LOSA ALIGERADA - CONCRETO 210 kg/cm2 - 1 y 2 PISO m3 41.47 337.29 13,987.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 41.47 13987.42 100.00% 01.04.07.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO m2 497.93 31.07 15,470.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 497.93 15470.69 100.00% 01.04.07.03 LOSA ALIGERADA - LADRILLO HUECO 15x30x30 und 4,481.37 3.43 15,371.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4481.37 15371.10 100.00% 01.04.07.04 LOSA ALIGERADA - ACERO Fy=4200 kg/cm2 kg 2,649.72 4.46 11,817.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2649.72 11817.75 100.00% 01.04.08 ESCALERAS
01.04.08.01 ESCALERA CONCRETO 210 kg/cm2 m3 4.56 408.81 1,864.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.56 1864.17 100.00% 01.04.08.02 ESCALERAS - ENCOFRADO Y DESENCOFRADO m2 27.66 66.15 1,829.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 27.66 1829.71 100.00% 01.04.08.03 ESCALERAS - ACERO Fy=4200 kg/cm2 kg 441.34 4.46 1,968.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 441.34 1968.38 100.00% 01.04.09 MUROS Y TABIQUES DE ALBAÑILERIA
01.04.09.01 MUROS DE LADRILLO KK TIPO IV SOGA M: 1:1:4 E=1.5 CM m2 461.06 70.65 32,573.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 461.06 32573.89 100.00% 01.04.09.02 ALAMBRE #8 REFUERZO HORIZONTAL EN MUROS kg 74.49 4.76 354.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 74.49 354.57 100.00%
2.00 ARQUITECTURA
02.01. REVOQUES ENLUCIDOS Y MOLDURAS
02.01.01 TARRAJEO EN MURO: INTERIOR Y EXTERIOR m2 922.12 17.15 15,814.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 922.12 15814.36 100.00%
02.01.02 TARRAJEO DE COLUMNAS m2 359.65 26.89 9,670.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 359.65 9670.99 100.00%
02.01.03 TARRAJEO DE VIGAS m2 207.59 39.63 8,226.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 207.59 8226.79 100.00%
02.01.04 TARRAJEO FINO EN PIZARRAS m2 12.80 25.67 328.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 12.80 328.58 100.00% 02.01.05 VESTIDURA DE DERRAMES (1:5) m 89.97 11.08 996.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 89.97 996.87 100.00% 02.01.06 BRUÑAS SEGUN DETALLE (1 X 1 cm) m 1,225.26 4.35 5,329.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1225.26 5329.88 100.00%
02.02. CIELORRASOS
02.02.01 VESTIDURA EN FONDO DE ESCALERAS m2 12.06 28.33 341.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 12.06 341.66 100.00% 02.02.02 CIELO RASO CON MEZCLA C:A 1:5 m2 497.93 29.73 14,803.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 497.93 14803.46 100.00%
02.03. PISOS Y PAVIMENTOS
02.03.01 CONTRAPISO DE 40 mm m2 373.74 21.55 8,054.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 373.74 8054.10 100.00%
02.03.02 PISO DE CEMENTO PULIDO Y BRUÑADO E=2" COLOREADO m2 373.74 28.98 10,830.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 373.74 10830.99 100.00% 02.03.03 VEREDA DE CONCRETO 175 kg/cm2 E=4" m2 113.96 44.71 5,095.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 113.96 5095.15 100.00% 02.03.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 17.59 103.16 1,814.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 17.59 1814.58 100.00%
02.04. REVESTIMIENTOS
02.04.01 REVESTIMIENTO C/ CEMENTO PULIDO PASO Y CONTRAPASO m2 80.00 25.39 2,031.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 80.00 2031.20 100.00% 02.04.02 ACABADO DE DESCANSO CEMENTO PULIDO Y BRUÑADO m2 8.80 23.53 207.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.80 207.06 100.00%
02.05. CONTRAZOCALOS
02.05.01 CONTRAZOCALO S/ COLOREAR H=20cm MZ 1:2 E=1.5 cm m2 367.05 8.71 3,197.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 367.05 3197.01 100.00%
02.06. CARPINTERIA DE MADERA
02.06.01 PUERTA DE MADERA APANELADA SEGÚN DISEÑO, INCLUYE DE INSTA m2 28.91 153.85 4,447.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 28.91 4447.80 100.00%
02.07. CARPINTERIA METALICA Y HERRERIA
02.07.01 VENTANA METÁLICA SEG. DISEÑO INC. INSTALACIÓN m2 99.16 144.61 14,339.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 99.16 14339.53 100.00% 02.07.02 PASAMANO DE TUBO FºNº DE 2" m 8.40 82.01 688.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.40 688.88 100.00% 02.07.03 BARANDAS METÁLICAS H=1.00 TUBO GALVANIZADO m 7.98 170.88 1,363.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 7.98 1363.62 100.00% 02.07.04 CANTONERA DE FIERRO EN ESCALERA m 40.00 23.26 930.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 40.00 930.40 100.00%
02.08. CERRAJERIA
02.08.01 BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA pza 33.00 6.31 208.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 33.00 208.23 100.00% 02.08.02 CERRADURA P/PUERTA PRINCIPAL DE SOBREPONER und 11.00 80.69 887.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 11.00 887.59 100.00%
VALORIZACION DE OBRA N° 04 - MES DE MAYO 2013
OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 5/31/2013
MODALIDAD: CONTRATA REGION: JUNIN
EJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYO
RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMON
SUPERVISOR ARQ. RAUL HINOSTROZA CANO
PRESUPUESTO ANTERIOR ACTUALAVANCES ACUMULADO SALDO
Partida Descripcion Unid. Metrado P. Unit. S/. Presup. S/. Metrado Valorizado MetradoS/. ValorizadoS/. Metrado ValorizadoS/.
%
Metrado ValorizadoS/.%
02.09.01 VIDRIOS SEMIDOBLES IMPORTADOS p2 1,065.97 3.99 4,253.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1065.97 4253.22 100.00%
02.10. PINTURA
02.10.01 PINTURA EN MUROS INTERIORES Y COLUMNETAS C/ LATEX LAVABLE m2 461.06 8.53 3,932.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 461.06 3932.84 100.00% 02.10.02 PINTURA EN MUROS EXTERIORES Y COLUMNETAS C/ LATEX LAVABLE m2 374.11 8.53 3,191.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 374.11 3191.16 100.00% 02.10.03 PINTURA LATEX 2 MANOS EN CIELORASO m2 509.99 7.90 4,028.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 509.99 4028.92 100.00% 02.10.04 PINTURA LATEX DOS MANOS EN VIGAS Y COLUMNAS m2 567.24 7.61 4,316.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 567.24 4316.70 100.00% 02.10.05 PINTURA LATEX LAVABLE DOS MANOS EN DERRAMES m 89.97 3.22 289.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 89.97 289.70 100.00% 02.10.06 PINTURA ESMALTE SINTETICO EN BRUÑAS m 1,225.26 3.23 3,957.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1225.26 3957.59 100.00% 02.10.07 PINTURA EN PIZARRA DE CONCRETO m2 12.80 11.47 146.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 12.80 146.82 100.00% 02.10.08 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 57.82 16.72 966.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 57.82 966.75 100.00% 02.10.09 PINTURA ANTICORROSIVA Y ESMALTE EN BARANDAS m 7.98 5.49 43.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 7.98 43.81 100.00% 02.10.10 PINTURA ANTICORROSIVA ESMALTE DOS MANOS EN TUBERIAS 2" m 8.40 2.60 21.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.40 21.84 100.00% 02.10.11 PINTURA ESMALTE DOS MANOS EN ZOCALO DE CEMENTO m2 86.95 10.02 871.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 86.95 871.24 100.00% 02.10.12 PINTURA ANTICORROSIVA Y ESMALTE DOS MANOS - PTA / VENT m2 99.16 9.46 938.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 99.16 938.05 100.00%
02.11. CUBIERTAS
02.11.01 COBERTURA CON TEJA ANDINA INDUSTRIAL m2 332.29 38.46 12,779.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 332.29 12779.87 100.00% 02.11.02 CUMBRERA DE TEJA ANDINA INDUSTRIAL m 32.45 47.21 1,531.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 32.45 1531.96 100.00%
02.12. VARIOS, LIMPIEZA Y JARDINERIA
02.12.01 JUNTA DE DILITACION RELLENO CON MORTERO ASFALTICO E= 1´ m 35.00 6.64 232.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 35.00 232.40 100.00% 02.12.02 JUNTA DE DILATACION CON ESPUMA PLASTICA + JEBE MICROPOROS m 193.28 7.45 1,439.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 193.28 1439.94 100.00%
02.12.03 LIMPIEZA FINAL DE OBRA m2 200.00 2.80 560.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 200.00 560.00 100.00%
3.00 INSTALACIONES ELÉCTRICAS
03.01. SALIDA DE ALUMBRADO
03.01.01 SALIDA DE TECHO ( CENTRO DE LUZ) pto 37.00 82.33 3,046.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 37.00 3046.21 100.00%
03.02. SALIDA PARA TOMACORRIENTE
03.02.01 SALIDA PARA INTERRUPTOR SIMPLE pto 7.00 32.27 225.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 7.00 225.89 100.00% 03.02.02 SALIDA PARA INTERRUPTOR DOBLE pto 10.00 34.27 342.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 10.00 342.70 100.00% 03.02.03 SALIDA PARA INTERRUPTOR DE CONMUTACIÓN pto 2.00 40.30 80.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 80.60 100.00% 03.02.04 SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA pto 14.00 93.08 1,303.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 14.00 1303.12 100.00% 03.02.05 SALIDA PARA TOMACORRIENTES A PRUEBA DE AGUA pto 35.00 73.23 2,563.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 35.00 2563.05 100.00%
03.03. CAJAS DE PASO
03.03.01 CAJA DE PASE FºGº 4 X 4 X 2" und 5.00 25.72 128.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 5.00 128.60 100.00%
03.04. SISTEMA DE PUESTA A TIERRA
03.04.01 POZO PUESTA A TIERRA (R < 15 Ohms) und 1.00 990.63 990.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 990.63 100.00%
03.05. ELECTRODUCTOS
03.05.01 EXCAVACION DE ZANJAS PARA REDES EXT. SANIT. - ELECT. m3 0.90 19.55 17.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.90 17.60 100.00%
03.05.02 TUBERIA PVC - P 25mm m 15.00 15.61 234.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 15.00 234.15 100.00% 03.05.03 TUBERIA PVC - P 20mm m 187.00 9.66 1,806.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 187.00 1806.42 100.00% 03.06. ALIMENTADORES 03.06.01 CONDUCTOR TW 2.5mm2 m 110.00 8.28 910.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 110.00 910.80 100.00% 03.06.02 CONDUCTOR TW 4.0mm2 m 90.00 8.44 759.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 90.00 759.60 100.00% 03.06.03 CONDUCTOR TW 10.0mm2 m 35.00 12.54 438.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 35.00 438.90 100.00%
03.06.04 CABLE TP CAD 6-4 PARES m 60.00 6.26 375.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 60.00 375.60 100.00%
03.07. TABLEROS DE DISTRIBUCIÓN ELECTRICA
03.07.01 TABLEROS DE DISTRIBUCIÓN CAJA METÁLICA pza 3.00 381.32 1,143.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 1143.96 100.00% 03.07.02 INTERRUPTOR THERMOMAGNETICO 2x15 A pza 4.00 58.99 235.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 235.96 100.00% 03.07.03 INTERRUPTOR THERMOMAGNETICO 2x20 A pza 4.00 61.99 247.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 247.96 100.00% 03.07.04 INTERRUPTOR THERMOMAGNETICO 2x60 A pza 1.00 94.99 94.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 94.99 100.00%
03.08. ARTEFACTOS DE ILUMINACION
03.08.01 ARTEF. FLUOR. 2/40W C/ REJ. MET. EMPOTRADO AF SIMILAR RES-M M und 28.00 72.76 2,037.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 28.00 2037.28 100.00% 03.08.02 ARTEFACTO FLUORESCENTE CIRCULAR DE 32W und 9.00 67.45 607.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 9.00 607.05 100.00% 4.00 INSTALACIONES SANITARIAS
04.01. APARATOS Y ACCESORIOS SANITARIOS
04.01.01 LAVADERO ACERO INOXIDABLE C/ ESCURRIDERA pza 2.00 194.37 388.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 388.74 100.00% 04.01.02 LAVATORIO DE LOSA BLANCA DE 1RA 545x460mm pza 3.00 202.78 608.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 608.34 100.00% 04.01.03 MESA DE CONCRETO PARA LAVATORIO (0.1 POZA) pza 2.00 516.25 1,032.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 1032.50 100.00%
CONSORCIO PATROMAQ
VALORIZACION DE OBRA N° 04 - MES DE MAYO 2013
OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 5/31/2013
MODALIDAD: CONTRATA REGION: JUNIN
EJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYO
RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMON
SUPERVISOR ARQ. RAUL HINOSTROZA CANO
PRESUPUESTO ANTERIOR ACTUALAVANCES ACUMULADO SALDO
Partida Descripcion Unid. Metrado P. Unit. S/. Presup. S/. Metrado Valorizado MetradoS/. ValorizadoS/. Metrado ValorizadoS/.
%
Metrado ValorizadoS/.%
04.02.01 SALIDA DE DESAGUE EN PVC 2" pto 5.00 62.18 310.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 5.00 310.90 100.00% 04.02.02 SALIDA PARA VENTILACION DE 2" pto 2.00 65.47 130.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 130.94 100.00%
04.03. ADITAMENTOS VARIOS
04.03.01 SUMIDERO DE BRONCE 3" und 3.00 38.08 114.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 114.24 100.00% 04.03.02 REGISTRO DE BRONCE 3" und 1.00 32.99 32.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 32.99 100.00% 04.03.03 REGISTRO DE BRONCE 4" und 1.00 35.49 35.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 35.49 100.00%
04.04. CAMARAS DE INSPECCION
04.04.01 TUBERIA PVC SAP DE 3" m 7.50 26.05 195.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 7.50 195.38 100.00% 04.04.02 TUBERIA PVC SAP DE 4" m 4.22 25.35 106.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.22 106.98 100.00% 04.04.03 CANALETA DE FIERRO GALVANIZADO m 64.90 22.36 1,451.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 64.90 1451.16 100.00% 04.04.04 TUBERIA DE BAJADA PVC SAL 3" P/ LLUVIAS m 60.00 23.54 1,412.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 60.00 1412.40 100.00%
04.05. SISTEMA DE AGUA FRIA
04.05.01 SALIDA DE AGUA FRIA - PVC DE 1/2" pto 3.00 64.58 193.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 3.00 193.74 100.00% 04.05.02 SALIDA DE AGUA FRIA - PVC DE 3/4" pto 2.00 62.95 125.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 125.90 100.00%
04.06. REDES DE DISTRIBUCION 0.00
04.06.01 TUBERIA PVC CLASE 10 - 3/4" ROSCADA m 8.50 9.68 82.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.50 82.28 100.00%
04.07. LLAVES Y VALVULAS
04.07.01 VALVULA DE COMPUERTA DE BRONCE 1/2" und 4.00 75.44 301.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 4.00 301.76 100.00% 04.07.02 VALVULA DE COMPUERTA DE BRONCE 3/4" und 1.00 87.76 87.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.00 87.76 100.00% 04.07.03 SOMBRERO PARA VENTILACION EN PVC DE 2" und 2.00 1.90 3.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 2.00 3.80 100.00%
5.00
1.00 ESTRUCTURAS
01.01 TRABAJOS PRELIMINARES
01.01.01 TRAZO, NIVELES Y REPLANTEO m2 339.66 2.42 821.98 339.66 821.98 0.00 0.00 339.66 821.98 100.00% 0.00 0.00 0.00%
01.02 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACIÓN DE ZANJAS Y ZAPATA RT<2 kg/cm2 H=1.30 M m3 194.31 27.92 5,425.14 194.31 5,425.14 0.00 0.00 194.31 5425.14 100.00% 0.00 0.00 0.00% 01.02.02 RELLENO COMPACTADO C/EQ. MAT./ PROPIO m3 50.46 19.91 1,004.66 50.46 1,004.66 0.00 0.00 50.46 1004.66 100.00% 0.00 0.00 0.00% 01.02.03 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES m3 143.85 16.28 2,341.88 143.85 2,341.88 0.00 0.00 143.85 2341.88 100.00% 0.00 0.00 0.00% 01.02.04 ELIMINACIÓN MATERIAL EXCEDENTE ACARREADO m3 148.17 21.03 3,116.02 148.17 3,116.02 0.00 0.00 148.17 3116.02 100.00% 0.00 0.00 0.00% 01.02.05 NIVELACIÓN INTERIOR Y APISONADO PARA F.PISO, PATIO Y VEREDAS m2 305.25 3.82 1,166.06 0.00 0.00 305.25 1166.06 305.25 1166.06 100.00% 0.00 0.00 0.00% 01.02.06 AFIRMADO DE 4" PARA PISOS, PATIOS, VEREDAS COMPACTADO. m2 469.68 12.27 5,762.97 0.00 0.00 469.68 5762.97 469.68 5762.97 100.00% 0.00 0.00 0.00%
01.03. OBRAS DE CONCRETO SIMPLE
01.03.01 BASES
01.03.01.01 SOLADO E=4" MEZCLA 1:10 C:H INC. CURADO m2 63.66 26.90 1,712.45 63.66 1,712.45 0.00 0.00 63.66 1712.45 100.00% 0.00 0.00 0.00% 01.03.01.02 CIMIENTOS CORRIDOS 1:10 + 30% P.G F´>=100 kg/cm2 m3 28.08 177.95 4,996.84 28.08 4,996.84 0.00 0.00 28.08 4996.84 100.00% 0.00 0.00 0.00% 01.03.01.03 CIMIENTOS ENCOFRADO Y DESENCOFRADO m2 112.29 33.07 3,713.43 112.29 3,713.43 0.00 0.00 112.29 3713.43 100.00% 0.00 0.00 0.00% 01.03.02 SOBRECIMIENTOS
01.03.02.01 SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M F´c >= 100 kg/cm2 m3 5.58 237.78 1,326.81 5.58 1,326.81 0.00 0.00 5.58 1326.81 100.00% 0.00 0.00 0.00% 01.03.02.02 SOBRECIMEINTO, ENCOFRADO Y DESENCOFRADO m2 63.72 27.90 1,777.79 63.72 1,777.79 0.00 0.00 63.72 1777.79 100.00% 0.00 0.00 0.00% 01.03.02.03 FALSO PISO MEZCLA 1.8 E=4" m2 305.24 30.01 9,160.25 0.00 0.00 305.24 9160.25 305.24 9160.25 100.00% 0.00 0.00 0.00%
01.04. OBRAS DE CONCRETO ARMADO
01.04.01 ZAPATAS
01.04.01.01 ZAPATAS - CONCRETO 210 kg/cm2 m3 57.27 325.75 18,655.70 57.27 18,655.70 0.00 0.00 57.27 18655.70 100.00% 0.00 0.00 0.00% 01.04.01.02 ZAPATAS, ENCOFRADO Y DESENCOFRADO m2 161.19 44.53 7,177.79 161.19 7,177.79 0.00 0.00 161.19 7177.79 100.00% 0.00 0.00 0.00% 01.04.01.03 ZAPATAS - ACERO Fy=4200 kg/cm2 kg 934.08 4.46 4,166.00 934.08 4,166.00 0.00 0.00 934.08 4166.00 100.00% 0.00 0.00 0.00% 01.04.02 VIGAS DE CONEXIÓN
01.04.02.01 VIGAS DE CONEXIÓN - CONCRETO 210 kg/cm2 m3 17.64 297.67 5,250.90 17.64 5,250.90 0.00 0.00 17.64 5250.90 100.00% 0.00 0.00 0.00% 01.04.02.02 VIGAS DE CONEXIÓN - ENCOFRADO Y DESENCOFRADO m2 141.12 41.28 5,825.43 141.12 5,825.43 0.00 0.00 141.12 5825.43 100.00% 0.00 0.00 0.00% 01.04.02.03 VIGAS DE CONEXIÓN - ACERO Fy=4200 kg/cm2 kg 1,042.50 4.46 4,649.55 1042.50 4,649.55 0.00 0.00 1042.50 4649.55 100.00% 0.00 0.00 0.00% 01.04.03 COLUMNAS
01.04.03.01 COLUMNAS - CONCRETO 210 kg/cm2 - 1 PISO m3 18.48 419.86 7,759.01 6.47 2,715.65 12.01 5043.36 18.48 7759.01 100.00% 0.00 0.00 0.00% 01.04.03.02 COLUMNAS - ENCOFRADO Y DESENCOFRADO m2 209.10 47.49 9,930.16 73.19 3,475.56 135.92 6454.60 209.10 9930.16 100.00% 0.00 0.00 0.00% 01.04.03.03 COLUMNAS - ACERO Fy=4200 kg/cm2 kg 4,205.97 4.46 18,758.63 4205.97 18,758.63 0.00 0.00 4205.97 18758.63 100.00% 0.00 0.00 0.00% 01.04.04 COLUMNETAS
01.04.04.01 COLUMNETAS - CONCRETO 175 kg/cm2 - 1 PISO m3 5.28 378.56 1,998.80 0.00 0.00 3.17 1199.28 3.17 1199.28 60.00% 2.11 799.52 40.00% 01.04.04.02 COLUMNETAS - ENCOFRADO Y DESENCOFRADO m2 91.65 43.77 4,011.52 0.00 0.00 54.99 2406.91 54.99 2406.91 60.00% 36.66 1604.61 40.00% 01.04.04.03 COLUMNETAS - ACERO Fy=4200 kg/cm2 kg 545.28 4.46 2,431.95 545.28 2,431.95 0.00 0.00 545.28 2431.95 100.00% 0.00 0.00 0.00%
SUSTITUCIÓN DE 03 TALLERES: COSMETOLOGÍA, CONFECCIÓN TEXTIL E INDUSTRIAS ALIMENTARIAS
VALORIZACION DE OBRA N° 04 - MES DE MAYO 2013
OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 5/31/2013
MODALIDAD: CONTRATA REGION: JUNIN
EJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYO
RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMON
SUPERVISOR ARQ. RAUL HINOSTROZA CANO
PRESUPUESTO ANTERIOR ACTUALAVANCES ACUMULADO SALDO
Partida Descripcion Unid. Metrado P. Unit. S/. Presup. S/. Metrado Valorizado MetradoS/. ValorizadoS/. Metrado ValorizadoS/.
%
Metrado ValorizadoS/.%
01.04.05 VIGAS
01.04.05.01 VIGAS - CONCRETO 210 kg/cm2 - 1 PISO m3 27.18 356.11 9,679.07 0.00 0.00 27.18 9679.07 27.18 9679.07 100.00% 0.00 0.00 0.00% 01.04.05.02 VIGAS - ENCOFRADO Y DESENCOFRADO m2 171.99 51.08 8,785.25 0.00 0.00 171.99 8785.25 171.99 8785.25 100.00% 0.00 0.00 0.00% 01.04.05.03 VIGAS - ACERO Fy=4200 kg/cm2 kg 3,205.11 4.46 14,294.79 0.00 0.00 3205.11 14294.79 3205.11 14294.79 100.00% 0.00 0.00 0.00% 01.04.06 VIGAS DE CONFINAMIENTO
01.04.06.01 VIGAS - CONCRETO 175 kg/cm2 - 1 PISO m3 1.41 285.80 402.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1.41 402.98 100.00% 01.04.06.02 VIGAS CONF. - ENCOFRADO Y DESENCOFRADO m2 21.60 51.08 1,103.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 21.60 1103.33 100.00% 01.04.06.03 VIGAS CONF. - ACERO Fy=4200 kg/cm2 kg 210.45 4.46 938.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 210.45 938.61 100.00% 01.04.07 LOSAS ALIGERADAS H=20 cm y 17 cm
01.04.07.01 LOSA ALIGERADA - CONCRETO 210 kg/cm2 - 1 y 2 PISO m3 44.22 337.29 14,914.96 0.00 0.00 44.22 14914.96 44.22 14914.96 100.00% 0.00 0.00 0.00% 01.04.07.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO m2 441.21 31.07 13,708.39 0.00 0.00 441.21 13708.39 441.21 13708.39 100.00% 0.00 0.00 0.00% 01.04.07.03 LOSA ALIGERADA - LADRILLO HUECO 15x30x30 und 3,970.89 3.43 13,620.15 0.00 0.00 3970.89 13620.15 3970.89 13620.15 100.00% 0.00 0.00 0.00% 01.04.07.04 LOSA ALIGERADA - ACERO Fy=4200 kg/cm2 kg 2,537.76 4.46 11,318.41 0.00 0.00 2537.76 11318.41 2537.76 11318.41 100.00% 0.00 0.00 0.00%
01.05. MUROS Y TABIQUES DE ALBAÑILERIA
01.05.01 MUROS DE LADRILLO KK TIPO IV SOGA M: 1:1:4 E=1.5 CM m2 290.97 70.65 20,557.03 0.00 0.00 290.97 20557.03 290.97 20557.03 100.00% 0.00 0.00 0.00% 01.05.02 ALAMBRE #8 REFUERZO HORIZONTAL EN MUROS kg 33.66 4.76 160.22 0.00 0.00 33.66 160.22 33.66 160.22 100.00% 0.00 0.00 0.00%
01.06. ESTRUCTURA DE MADERA
01.06.01 TIJERAL DE MADERA TORMILLO 4"X8"X8.00 M m 150.75 224.26 33,807.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 150.75 33807.20 100.00% 01.06.02 CORREAS DE MADERA TORNILLO m 642.60 11.36 7,299.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 642.60 7299.94 100.00%
2.00 ARQUITECTURA
02.01. REVOQUES ENLUCIDOS Y MOLDURAS
02.01.01 TARRAJEO EN MURO: INTERIOR Y EXTERIOR m2 581.94 17.15 9,980.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 581.94 9980.27 100.00%
02.01.02 TARRAJEO DE COLUMNAS m2 300.75 26.89 8,087.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 300.75 8087.17 100.00%
02.01.03 TARRAJEO DE VIGAS m2 193.59 39.63 7,671.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 193.59 7671.97 100.00%
02.01.04 TARRAJEO FINO EN PIZARRAS m2 14.40 25.67 369.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 14.40 369.65 100.00% 02.01.05 VESTIDURA DE DERRAMES (1:5) m 83.07 11.08 920.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 83.07 920.42 100.00% 02.01.06 BRUÑAS SEGUN DETALLE (1 X 1 cm) m 1,575.78 4.35 6,854.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 1575.78 6854.64 100.00%
02.02. CIELORRASOS
02.02.01 CIELO RASO CON MEZCLA C:A 1:5 m2 441.21 29.73 13,117.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 441.21 13117.17 100.00%
02.03. PISOS Y PAVIMENTOS
02.03.01 CONTRAPISO DE 40 mm m2 305.25 21.55 6,578.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 305.25 6578.14 100.00%
02.03.02 PISO DE CEMENTO PULIDO Y BRUÑADO E=2" COLOREADO m2 305.25 28.98 8,846.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 305.25 8846.15 100.00% 02.03.03 VEREDA DE CONCRETO 175 kg/cm2 E=4" m2 164.43 44.71 7,351.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 164.43 7351.67 100.00% 02.03.04 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 27.96 103.16 2,884.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 27.96 2884.35 100.00%
02.04. REVESTIMIENTOS
02.04.01 REVESTIMIENTO C/ CEMENTO PULIDO PASO Y CONTRAPASO m2 80.00 25.39 2,031.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 80.00 2031.20 100.00% 02.04.02 ACABADO DE DESCANSO CEMENTO PULIDO Y BRUÑADO m2 8.80 23.53 207.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.80 207.06 100.00%
02.05. ZOCALOS Y CONTRAZOCALOS
02.05.01 ZOCALO DE MAYOLICA BLANCA 30 X 30cm COLOR m2 8.70 59.69 519.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 8.70 519.30 100.00% 02.05.02 CONTRAZOCALO S/ COLOREAR H=20cm MZ 1:2 E=1.5 cm m 367.05 8.71 3,197.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 367.05 3197.01 100.00%
02.06. CARPINTERIA DE MADERA
02.06.01 PUERTA DE MADERA APANELADA SEGÚN DISEÑO, INCLUYE DE INSTA m2 12.60 153.85 1,938.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 12.60 1938.51 100.00%
02.07. CARPINTERIA METALICA Y HERRERIA
02.07.01 VENTANA METÁLICA SEG. DISEÑO INC. INSTALACIÓN m2 89.40 144.61 12,928.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 89.40 12928.13 100.00%
02.08. CERRAJERIA
02.08.01 BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA pza 18.00 6.31 113.58 0.00 0.00 0.00 0.00 0.00 0.00% 18.00 113.58 100.00% 02.08.02 CERRADURA P/PUERTA PRINCIPAL DE SOBREPONER und 6.00 80.69 484.14 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 484.14 100.00%
02.09. VIDRIOS, CRISTALES Y SIMILARES
02.09.01 VIDRIOS SEMIDOBLES IMPORTADOS p2 961.05 3.99 3,834.59 0.00 0.00 0.00 0.00 0.00 0.00% 961.05 3834.59 100.00%
02.10. PINTURA
02.10.01 PINTURA EN MUROS INTERIORES Y COLUMNETAS C/ LATEX LAVABLE m2 290.97 8.53 2,481.97 0.00 0.00 0.00 0.00 0.00 0.00% 290.97 2481.97 100.00% 02.10.02 PINTURA EN MUROS EXTERIORES Y COLUMNETAS C/ LATEX LAVABLE m2 290.97 8.53 2,481.97 0.00 0.00 0.00 0.00 0.00 0.00% 290.97 2481.97 100.00% 02.10.03 PINTURA LATEX 2 MANOS EN CIELORASO m2 441.21 7.90 3,485.56 0.00 0.00 0.00 0.00 0.00 0.00% 441.21 3485.56 100.00% 02.10.04 PINTURA LATEX DOS MANOS EN VIGAS Y COLUMNAS m2 494.34 7.61 3,761.93 0.00 0.00 0.00 0.00 0.00 0.00% 494.34 3761.93 100.00% 02.10.05 PINTURA LATEX LAVABLE DOS MANOS EN DERRAMES m 83.07 3.22 267.49 0.00 0.00 0.00 0.00 0.00 0.00% 83.07 267.49 100.00% 02.10.06 PINTURA ESMALTE SINTETICO EN BRUÑAS m 1,575.78 3.23 5,089.77 0.00 0.00 0.00 0.00 0.00 0.00% 1575.78 5089.77 100.00% 02.10.07 PINTURA EN PIZARRA DE CONCRETO m2 14.40 11.47 165.17 0.00 0.00 0.00 0.00 0.00 0.00% 14.40 165.17 100.00%
CONSORCIO PATROMAQ
VALORIZACION DE OBRA N° 04 - MES DE MAYO 2013
OBRA: SUSTITUCION, CONSTRUCCION, CULMINACION Y MEJORAMIENTO DE LA I. E. INTEGRAL SANTA ROSA DEL DISTRITO DE SAN RAMON – CHANCHAMAYO - JUNIN FECHA: 5/31/2013
MODALIDAD: CONTRATA REGION: JUNIN
EJECUTOR: CONSORCIO PATROMAQ PROVINCIA: CHANCHAMAYO
RESIDENTE: ARQ. FERNANDO TORRES SUAREZ DISTRITO: SAN RAMON
SUPERVISOR ARQ. RAUL HINOSTROZA CANO
PRESUPUESTO ANTERIOR ACTUALAVANCES ACUMULADO SALDO
Partida Descripcion Unid. Metrado P. Unit. S/. Presup. S/. Metrado Valorizado MetradoS/. ValorizadoS/. Metrado ValorizadoS/.
%
Metrado ValorizadoS/.%
02.10.08 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 25.20 16.72 421.34 0.00 0.00 0.00 0.00 0.00 0.00% 25.20 421.34 100.00% 02.10.09 PINTURA ESMALTE DOS MANOS EN ZOCALO DE CEMENTO m2 70.35 10.02 704.91 0.00 0.00 0.00 0.00 0.00 0.00% 70.35 704.91 100.00% 02.10.10 PINTURA ANTICORROSIVA Y ESMALTE DOS MANOS - PTA / VENT m2 89.40 9.46 845.72 0.00 0.00 0.00 0.00 0.00 0.00% 89.40 845.72 100.00%
02.11. CUBIERTAS
02.11.01 COBERTURA CON TEJA ANDINA INDUSTRIAL m2 546.96 38.46 21,036.08 0.00 0.00 0.00 0.00 0.00 0.00% 546.96 21036.08 100.00% 02.11.02 CUMBRERA DE TEJA ANDINA INDUSTRIAL m 53.52 47.21 2,526.68 0.00 0.00 0.00 0.00 0.00 0.00% 53.52 2526.68 100.00%
02.12. VARIOS, LIMPIEZA Y JARDINERIA
02.12.01 JUNTA DE DILITACION RELLENO CON MORTERO ASFALTICO E= 1´ m 54.00 6.64 358.56 0.00 0.00 0.00 0.00 0.00 0.00% 54.00 358.56 100.00% 02.12.02 JUNTA DE DILATACION CON ESPUMA PLASTICA + JEBE MICROPOROS m 100.80 7.45 750.96 0.00 0.00 0.00 0.00 0.00 0.00% 100.80 750.96 100.00%
02.12.03 LIMPIEZA FINAL DE OBRA m2 339.66 2.80 951.05 0.00 0.00 0.00 0.00 0.00 0.00% 339.66 951.05 100.00%
3.00 INSTALACIONES ELÉCTRICAS
03.01. SALIDA DE ALUMBRADO
03.01.01 SALIDA DE TECHO ( CENTRO DE LUZ) pto 36.00 82.33 2,963.88 0.00 0.00 36.00 2963.88 36.00 2963.88 100.00% 0.00 0.00 0.00%
03.02. SALIDA PARA TOMACORRIENTE
03.02.01 SALIDA PARA INTERRUPTOR SIMPLE pto 6.00 32.27 193.62 0.00 0.00 0.00 0.00 0.00 0.00% 6.00 193.62 100.00% 03.02.02 SALIDA PARA INTERRUPTOR DOBLE pto 12.00 34.27 411.24 0.00 0.00 0.00 0.00 0.00 0.00% 12.00 411.24 100.00%