So far in the course you created demand for a number of MRP parts through sales orders, sales forecast, and master production schedule entries. The next step is to run the MRP process. In this workshop, run the MRP process (Regenerative).
Navigate to Process MRP.
Menu Path: Production Management > Material Requirements Planning > General O perations > Process MRP 1. Navigate to the Filter sheet.
2. Click the Site button and search for and select Main Site. 3. Navigate to the Selection sheet.
4. In the Processing Options section, select Regenerative.
In the Last Run section, the Date, Time and User ID fields default from the Epicor application information. Select the Net Change option to ignore any previously processed Material Requirements Planning (MRP) information. This option changes unfirm jobs and purchase order (PO) suggestions only as demand changes in orders, forecasts, or master production schedules (MPS).
Selecting the Regenerative option processes all outstanding sales orders, forecasts and MPS entries, as well as jobs or POs previously created by MRP. Previous unfirm jobs and PO suggestions are deleted. New unfirm jobs and suggested POs are then generated.
5. Enter the following information:
Details Data
Field
MRP does not search for demand after this date. Blank
Cut Off Date
If you were to select this check box, the Cut Off Date field would no longer display the calendar. Instead you would select options like Today, Monday, Next Tuesday, and so on from a drop-down list. Clear
Dynamic
This is the file name assigned to this MRP process run and is useful in troubleshooting.
MRP Log Log
This is the basic logging level. Basic
Logging Level
All job suggestions and unfirm jobs are calculated using the Finite Scheduling method. This means that this job's finite resource groups Clear
Run Finite Scheduling During MRP Calculation
only run for a specific number of hours each day, and that the job's operations cannot be larger than this capacity.
Defines that the Process MRP does not observe material constraints during its scheduling calculations. When a material is constrained, Clear
Ignore Constrained Materials
the scheduling functionality determines when a material is available for an operation and then uses this date as the operation's Start Date. This allows operations and purchasing start dates to be placed in the schedule before the Schedule Start Date. This option overrides the Select
Allow Historical Dates
default MRP calculation that uses the Scheduled Start Date value for all operations.
Defines that the day number value is to be used during the Process MRP. This value, defined on a part record, indicates how many days Select
Use Production Preparation Buffer
Daily MRP Processing Material Requirements Planning Course
Details Data
Field
are required by Production Planning to prepare the job before it can be released to production.
Defines the delay in starting the scheduling engine until all zero assembly level MRP jobs are created. Once all of these jobs are Clear
Sort Level 0 MRP Jobs by Date
generated, the scheduling engine can begin placing these jobs within available times on the schedule. Selecting this option does not affect parts that have low level assemblies other than zero.
Specifies that the MRP process reuses unfirm j obs rather than deletes them and then recreates them as needed. This speeds up the MRP Clear
Recycle MRP Jobs
process by saving the time spent within the application for deleting unfirm jobs at the beginning of a full MRP regeneration.
Designates if Process MRP should get details from quotes linked to orders (demand) for non-configured parts when creating jobs. Clear
Get Details from Quote
Defines additional supply and demand details. Each supply part quantity is directly linked, or pegged, to the specific demand record Clear
Run the Multi Level Pegging Process
that created it. You can view this information on the Multi-Level Pegging Display dashboard. This is to prevent overstocking as well as to find potential shortages.
Specifies if any active parts on purchase contracts should be included in the current Process MRP session.
Clear Include Contract PO
Parts
Designates that purchase contract schedules should be generated during the current Process MRP session.
Clear Run Generate Purchase
Schedules
This value specifies how many MRP processes can be run
simultaneously on your server. If your server has the capacity to handle 1
Number of MRP Processes
multiple MRP and scheduling processes, enter an appropriate value in this field.
This value specifies how many schedulers can run Process MRP simultaneously on your server. If your server has the capacity to handle multiple schedulers, enter an appropriate value in this field.
1 Number of Schedulers
6. Click Process. 7. Exit Process MRP.
8. From the Main Menu, navigate to System Setup > System Maintenance > System Monitor to verify the MRP process is complete.
9. Navigate to the Active Tasks > List sheet.
The MRP process displays within the Active Tasks grid. The MRP process can take a few minutes to complete; periodically click the Refresh button. When the MRP process has finished, it no longer displays within this grid.