INFRASTRUCTURE

PROJECTS

NATIONAL INFRASTRUCTURE

AGENCY

Republic of Colombia

Luis Fernando Andrade Moreno

(2)

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia

Ministry of Transport

(3)

OUTLINE

Ministry of Transport

1. Institutional framework for PPP in transport

infrastructure

2. Government Goals and Investment Levels

3. New Concession Projects

NATIONAL INFRASTRUCTURE AGENCY

(4)

Ministry of Transport

Institutional framework for PPP

in transport infrastructure

NATIONAL INFRASTRUCTURE AGENCY

(5)

Ministry of Transport

Ministry of

Finance

Ministry of

Transport

National Planning

Department

Fiscal Policy

Council

National

Infrastructure

Agency

Approval of government

contributions

Technical endorsement

of the projects

Harmonization of infrastructure

development plans

- Management of

Contingency Fund

- Fiscal capacity analysis

-Risk structure and valuation consent

-Payment of government contributions

- Political and planning guidance

- Project approvals

Port and

Transport

Superintendence

Surveillance of service standards and availability

Public Ministry

and fiscal

comptroller

office

Ministry of

environment

and sustainable

development

Environmental policies and licenses Administrative and treasury audits

Institutional framework for PPP

in transport infrastructure

NATIONAL INFRASTRUCTURE AGENCY

(6)

Ministry of Transport

Government Goals

and Investment Levels

NATIONAL INFRASTRUCTURE AGENCY

(7)

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia

Ministry of Transport

For the year 2014:

Roads: 100% increase in four-lane highways

Railways: 50% increase in length of railways in operation

Ports: 50% increase in load capacity

Airports: 35% increase in passengers mobilized

For the year 2018:

Roads: Fourfold increase in four-lane highways

Railways: Threefold increase in length of railways in operation

Ports: 100% capacity increase

Airports: 50% capacity increase

GOALS

GOVERMENT

(8)

Ministry of Transport

Indicator

Base

2010

Goal

2014

Goal

2018

Kilometers under concession

6.035

10.700

Kilometers of four-lane highways

792

2.280

3.400

Kilometers of railways in operation

846

1.341

2.343

Volume of cargo at ports (million tons/

year)

132

182

254

Air transport users (million/year)

20

27

34

GOALS

GOVERMENT

NATIONAL INFRASTRUCTURE AGENCY

(9)

Ministry of Transport

INVESTMENT

ESTIMATED

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia

(USD$ Million)

8.000

7.000

6.000

5.000

4.000

3.000

2.000

(10)

Ministry of Transport

NEW CONCESSIONS

PROJECTS

NATIONAL INFRASTRUCTURE AGENCY

(11)
(12)

Ministry of Transport

CONCESSIONS

Number of contracts

25

Total length (km)

6035 km

Four-lane highways built

875 km

Four-lane highways in operation

670 km

EXISTING ROAD

NATIONAL INFRASTRUCTURE AGENCY

(13)

RUMICHACA NEIVA VILLAVICENCIO PUERTO GAITAN POPAYAN CALI SOGAMOSO CHACHAGÛÍ ESPINAL ARMENIA IBAGUE TUNJA BOGOT A PTO. SALGAR CÁQUEZA CALERA SOPO LA PAILA BUENAVENTURA STDER. QUILICHAO PTO CARRENO YOPAL TAME ARAUCA SISGA EL SECRETO MOCOA CARTAGO PLANETA RICA TOLUVIEJO

CRUZ DEL VISO CARRETO PONEDERA LA PAZ SAN JUAN CUESTECITAS BARBOSA AGUACLARA OCANA MANIZALES VILLETA BUCARAMANGA BARRANCAB. REMEDIOS Pto. Arimena EL TIGRE PTO BERRÍO MEDELLIN CAUCASIA Pto. Colomb ia Lomita Arena

Sta. MARTA Pte. Mamatoco

LA YE SAN MARCO S PUERTA DE HIERRO BODEGA RIOACHA SAN ROQUE VALLEDUPAR Hatillo Santa fé de Ant. Bolombolo Tres Puertas Camilo C Tunel de Occidente Ministry of Transport

CONCESSIONS

NEXT ROAD

More than 6.000 km of roads will be

concessioned to complete the national network

NATIONAL INFRASTRUCTURE AGENCY

(14)

VILLAVICENCIO CALI BUGA PEREIRA SOGAMOSO PALO DE LETRAS CAUCACIA MONTERIA SINCELEJO CARMEN DE BOLIVAR VALLEDUPAR BARRANQUILLA CARTAGENA SANTA MARTA RIOHACHA PARAGUACHON SAN ROQUE NECOCLÍ PASTO ZIPAQUIRA PAMPLONA SIMITÍ ACHÍ SAN MARCOS SAN PELAYO TUNJA GIRARDOT CUCUTA RUMICHACA NEIVA VILLAVICENCIO PUERTO GAITAN POPAYAN CALI SOGAMOSO B/MANGA CHACHAGÛÍ ESPINAL ARMENIA IBAGU E TUNJA PTO. SALGAR CÁQUEZA CALERA SOPO LA PAILA BUENAVENTURA STDER. QUILICHAO PTO CARRENO YOPAL TAME ARAUCA SISGA EL SECRETO MOCOA CARTAGO PLANE TA RICA LA YE TOLUVIEJO CRUZ DEL VISO

CARRETO PONEDERA

LA PAZ SAN JUAN BUENAVISTA

CUESTECITAS BARBOSA AGUACLARA OCANA MANIZALES VILLET A MEDELLIN BOGOTA BARRANCAB. REMEDIO S Pto. Arimena EL TIGRE PTO BERRÍO Santa fé de Ant. Bolombolo Tres Puertas Camilo C Tunel de Occidente

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia

UNDER CONCESSIONS

RESULTING NATIONAL ROAD NETWORK

Ministry of Transport

New Concessions Existing concession

More than 10.000 kilometers will be under

concession

(15)

Terrain Length (Km) Capex (Mill US$) INTERVENTION TYPE (KM) Bidding Start Four-lane highway Single

lane Tunnel Bridges

Improve ment Rehabilita tion

* Ibagué-Cajamarca

M 40 333,3 46 - - 1 40 - 2013:II

* Cajamarca-Calarcá

M

46

76,7 - -

-

46

- 2013:II

* Calarcá-La Paila

0

62 345 62 - -

-

-

- 2013:II

O

211 401 24 10 -

-

25

- 2013-II

O-M

293 839 74 63 -

-

-

219 2013:II Ministry of Transport

1

IBAGUÉ-LA PAILA

CONCESSIONS

NEW ROAD

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia

BUGA-BUENAVENTURA

SANTANDER DE QUILICHAO-CHACHAGÜI

2

3

1

2

3

(16)

Ministry of Transport

CONCESSIONS

NEW ROAD

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia Terrain Length (Km) Capex (Mill US$) INTERVENTION TYPE (KM) Four-lane highway Single

lane Tunnel Bridges

Improve ment Rehabili tation

F-O

166 592 81 - - - 85 - 2013:II

O-M

167 268 5 2 128

16

2012-IV

O

145 - - - -

-

-

- 2012-IV NEIVA-GIRARDOT

1

GIRARDOT-PUERTO SALGAR

2

PUERTO SALGAR-IBAGUÉ 1

3

1 Only Maintenance and Operation

Honda

1

2

3

(17)

Ministry of Transport

CONCESSIONS

NEW ROAD

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia Terrain Length (Km) Capex (Mill US$) INTERVENTION TYPE (KM) Bidding Start Four-lane highway Single

lane Tunnel Bridges

Improve ment Rehabili tation

M

226 568 50 10 136 30 2013:II Honda

MANIZALES- HONDA - VILLETA

(18)

Terrain Length (Km) Capex (Mill US$) INTERVENTION TYPE (KM) Bidding Start Four-lane highway Single

lane Tunnel Bridges

Improve ment Rehabili tation

F

662 645 24 662 2013:II

M

141 159 50 91 2013:II Ministry of Transport

1

CONCESSIONS

NEW ROAD

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia

2

VILLAVICENCIO-ARAUCA

CHOCONTÁ- ELSECRETO

1

(19)

Ministry of Transport

CONCESSIONS

NEW ROAD

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia Terrain Length (Km) Capex (Mill US$) INTERVENTION TYPE (KM) Bidding Start Four-lane highway Single

lane Tunnel Bridges

Improve ment Rehabili tation

F

73 61 73 2013:II

F

257 363 179 78 2013:II

F

650 1611 200 500 TBD

1

2

VILLAVICENCIO -GRANADA

VILLAVICENCIO -PUERTO ARIMENA

PUERTO ARIMENA-PUERTO CARREÑO1

3

1

2

3

(20)

Ministry of Transport

CONCESSIONS

NEW ROAD

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia Terrain Length (Km) Capex (Mill US$) INTERVENTION TYPE (KM) Bidding Start Four-lane

highway Single lane Tunnel Bridges

Improve ment Rehabilita tion

O

87 145 87 2012-IV

M

77 201 10 1,2 77 2012-IV

M

69 1.067 55 16 14 2013.II

1

2

3

1

2

3

BRICEÑO-CAQUEZA CHOACHÍ-BOGOTÁ. LA CALERA-BOGOTÁ BOGOTÁ-VILLAVICENCIO1

(21)

Ministry of Transport

CONCESSIONS

NEW ROAD

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia Terrain Length (Km) Capex (Mill US$) INTERVENTION TYPE (KM) Bidding Start Four-lane

highway Single lane Tunnel Bridges

Improve ment Rehabilita tion

O-F

223 852 90 20 120 90 2013.II

M

110 53,3 64 2013.II

O-M

330 939 110 50 80 2013.II

1

2

3

1

2

3

ZIPAQUIRÁ-BUCARAMANGA BUCARAMANGA-BARRANCABERMEJA-REMEDIOS BARBOSA-TUNJA-VILLAPINZÓN

(22)

Ministry of Transport

CONCESSIONS

NEW ROAD

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia Terrain Length (Km) Capex (Mill US$) INTERVENTION TYPE (KM) Bidding Start Four-lane

highway Single lane Tunnel Bridges

Improve ment Rehabilita tion

M

304 455 273 2013.II

M

189 288 3 123 2013.II

O

259 361 2013:II

4

5

PAMPLONA-DUITAMA BUCARAMANGA-CUESTABOBA-CÚCUTA

4

5

6

CUCUTA-AGUACLARA

6

(23)

Ministry of Transport

CONCESSIONS

NEW ROAD

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia Terrain Length (Km) Capex (Mill US$) INTERVENTION TYPE (KM) Bidding Start (1) Four-lane

highway Single lane Tunnel Bridges

Improve ment Rehabilita tion

M

206 2.373 156 50,1 20,4 2013-I

M

280 2.353 280 38 2013-I

O

51 470 50,8 3,5 2012-III

O

224 3.449 224 28 2012-III

1

2

3

TUNEL DE OCCIDENTE-EL TIGRE. BOLOMBOLO-SANTA FE DE ANTIOQUIA CAMILO C-BOLOMBOLO-LA PINTADA-TRES PUERTAS

SAN JOSE DE NUS-PUERTO BERRIO

SAN JOSE DE NUS-ZARAGOSA-CAUCASIA

4

1

2

3

4

1- As EPC of ISA or Separate Concession

(24)

CONCESSIONS

NEW ROAD

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia Ministry of Transport Terrain Length (Km) Capex (Mill US$) INTERVENTION TYPE (KM) Bidding Start (1) Four-lane highway Single

lane Tunnel Bridges

Improve ment Rehabilita tion F 143 794 143 20I3-II 0 46 267 46 2013-II O 200 222 40 2013-III F 132 733 132 2013-II

CAUCASIA-LA YE-CIENGA DE ORO

SAHAGÚN-SINCELEJO

CERETÉ-CRUZ DEL VISO

COROZAL-CRUZ DEL VISO - ARJONA

1

2

3

4

1

2

3

4

(25)

CONCESSIONS

NEW ROAD

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia Ministry of Transport Terrain Length (Km) Capex (Mill US$) INTERVENTION TYPE (KM) Bidding Start (1) Four-lane highway Single

lane Tunnel Bridges

Improve ment Rehabilita tion F 158 778 140 20I3-II F 75 417 75 2013-II F 72 162 18 16 2013-III F 689 115 2013-II

CARTAGENA - BARRANQUILLA - YE DE CIÉNAGA

CARRETO-PONEDERA

LA PAZ-VALLEDUPAR-SAN JUAN

CORRIDORS FOR MAINTENANCE AND OPERATION

1

2

3

1

2

3

(26)
(27)

BOGOTÁ Belencito Zipaquirá La Dorada Cabañas La Vizcaína Santa Marta Chiriguaná Dibulla Barbosa La Tebaida Zarzal La Felisa Buenaventura Cartagena Pto Berrio Calamar Ministry of Transport Number of contracts

(Concesión férrea del Pacífico + Chiriguaná – Santa Marta)

2

Km under concession 625 km

Km in administration and rehabiilitation 980 km

Kilometers in Operation 625 km

Kilometers to structure

(Carare + Chiriguaná – Puertos de la Guajira)

753 km

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia

CONCESSIONS

RAILWAYS

Existing concession Improvement Construction

(28)

Ministry of Transport

CONCESSIONS

NEW RAILWAYS

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia

Sector Terrain Length (Km) Capex (Mill US$) INTERVENTION TYPE (KM) Bidding Start Second Line Single lane Improvement La Dorada-Chiriguaná

F

524 388,5 524 2013.I

Cabañas-Puerto Berrio

F

32 10,1 32 2013.I

Bogotá-Belencito

o

263 139 263 2013.I

IMPROVEMENT

Existing concession Improvement Construction

(29)

Ministry of Transport

CONCESSIONS

NEW RAILWAYS

NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia

Existing concession Improvement Construction

Sector Terrain Length (Km) Capex (Mill US$) INTERVENTION TYPE (KM) Bidding Start Second Line Single lane Improvement

Belencito-La

Vizcaina

M

354 1.494 354 2013.I

Chiriguaná-Santa Marta

F

245 67 45 2013-I

Chiriguana-Dibulla

F

310 654 310 2013.I

Chiriguaná-Cartagena

F

270 409 270 2013.I

(30)
(31)

Ministry of Transport BUENAVENTURA

CARTAGENA

Second channel dredging

to 19 mts

.

Cartagena Bay

2012- IV

Dredging to 16 mts

.

Buenaventua Bay

2013-I

PORTS

NATIONAL INFRASTRUCTURE AGENCY

(32)
(33)

Ministry of Transport NATIONAL INFRASTRUCTURE AGENCY

Republic of Colombia

BARRANQUILLA

BARRANQUILLA AIRPORT.

Estimated value: US$ 32 mm

2013-II

(34)

THANKS

NATIONAL INFRASTRUCTURE AGENCY

República de Colombia

References

Related documents

In fact, the original attempt of Watts and Strogatz in their work on small-world networks [5] was to construct a network model with small average path length as a random graph

Keywords : Instructional Design Quality, Open Courses, Open Education Europa Networks, First Principles of Instruction, Online

In the next step, the degree of long chain branching, CBA content, and injection molding processing conditions are optimized to fabricate PLA microcellular foams having high

in iron oxide pellets ARC-MMS-2 DTP,xan on MeS Johanne Mouzon Jonas Hedlund Anna-Carin Larsson Lars Gunneriusson Allan Holmgren Fatai Ikumapayi. Iftekhar

[ 43 ] for AlSi10Mg samples, strength deterioration due to size variation showed a similar overall trend in the change of mechanical properties due to the change in features size to

Jeffers, Fulton Parker Chandler, Charlene 1968 Mar...

• One year after date of publication of final rule for potlines subject to the COS and PM emission limits; prebake potlines subject to POM emission limits; the potline,