• No results found

ENVIRONMENTAL IMPACT ASSESSMENT

N/A
N/A
Protected

Academic year: 2021

Share "ENVIRONMENTAL IMPACT ASSESSMENT"

Copied!
253
0
0

Loading.... (view fulltext now)

Full text

(1)
(2)

ENVIRONMENTAL IMPACT ASSESSMENT

FOR

DEVELOPMENT OF RESIDENTIAL APARTMENT

AT SURVEY NOS. 115, 116 & 117

UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI,

BENGALURU SOUTH TALUK, BENGALURU.

PROMOTER:

M/S. PRESTIGE ESTATES PROJECTS LTD.

BENGALURU

PREPARED BY:

A & N TECHNOLOGIES

# 855, 3

RD

FLOOR, 6

TH

MAIN,

J P NAGAR 2

ND

PHASE,

KSRTC LAYOUT, BENGALURU - 78.

PH: (080) 64500227, 41209283

~~~~~*****~~~~~

(3)

Page 1 TABLE OF CONTENTS

A & N Technologies, Bengaluru

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

CHAPTER -1: INTRODUCTION

Sl. No.

Contents

Page No.

1.1

Preamble

C1-1

1.1.1

Purpose And Need of The Project

C1-1

1.2

Identification of The Project

C1- 3

1.2.1

Identification of The Project

C1- 3

1.2.2

Profile of The Promoters

C1-3

1.3

Brief Description of The Project

C1-5

1.3.1

Project Settings

C1-5

1.3.2

Climate

C1-6

1.4

Nature and Size of The Project

C1-8

1.5

Importance to The Country and The Region

AIR ENVIRONMENT 10

C1-8

1.6

Scope of Environmental Impact Assessment

C1-9

1.7

Applicable Environmental Regulations

C1-9

LIST OF FIGURES

Sl. No.

Contents

Page No.

Fig 1.1

Location of the Proposed Project Site

C1-7

CHAPTER -2: PROJECT DESCRIPTION

Sl. No.

Contents

Page No.

2.1.

Background Details Of The Project

C2-1

2.1.1

Type Of The Project

C2-1

2.1.2

Need For The Project

C2-1

2.1.3

Location Of The Project

C2-2

2.1.4

Important Features Of The Project

C2-9

2.2

Proposed Facilities

C2-10

2.3

Resource Requirements

C2-12

2.3.1

Construction Phase

C2-12

2.3.1.1

Construction Equipments

C2-12

2.3.1.2

Raw Materials

C2-14

2.3.1.3

Water Requirements During Construction Phase

C2-14

2.3.1.4

Solid Waste Generation During Construction Phase

C2-15

(4)

Page 2 TABLE OF CONTENTS

A & N Technologies, Bengaluru

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

2.3.1.5

Energy Requirements During Construction Phase

C2-15

2.3.2.

Operation Phase

C2-16

2.3.2.1

Water Requirement

C2-16

2.3.2.2

Sewage Treatment Plant

C2-18

2.3.2.3

Solid Waste Generation

C2-20

2.3.2.4 Energy Requirements

C2-21

2.3.2.5

Fire Hydrant System

C2-23

2.3.2.6

Traffic Impact Study and its Management report

C2-23

LIST OF TABLES

Sl. No.

Contents

Page No.

Table 2.1

Environmental Setting of the Site

C2-3

Table 2.2

Project Planning Details

C2-10

Table 2.3

Block Wise Distribution

C2-10

Table 2.4

Details of Land use within the site

C2-11

Table 2.5

Area statement

C2-11

Table 2.6

Parking Details

C2-11

Table 2.7

Cost Breakup of the project

C2-12

Table 2.8

Machinery Requirements During Construction

C2-12

Table 2.9

Man Power Requirements During Construction

C2-13

Table 2.10

List of Raw Materials To Be Used For Construction

C2-14

Table 2.11

Water Requirement For Construction Purpose

C2-15

Table 2.12

Emission Load From Construction Equipments during

construction phase Using HSD

C2-16

Table 2.13

Water Requirement Break Up

C2-16

Table 2.14

Raw Sewage Characteristics

C2-18

Table 2.15

Sewage Characteristics After Treatment

C2-18

Table 2.16

Solid Waste Generation

C2-20

Table 2.17

Details Of Power Requirement & Backup Details

C2-21

Table 2.18

Properties Of HSD

C2-21

(5)

Page 3 TABLE OF CONTENTS

A & N Technologies, Bengaluru

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

LIST OF FIGURES

Sl. No.

Contents

Page No.

Fig 2.1

Location of the Proposed Project Site

C2-4

Fig 2.2

Topo Map Covering 5 km Radius

C2-5

Fig 2.3

Aerial View Covering 500m Radius

C2-6

Fig 2.4

Site Elevation Map

C2-7

Fig 2.5

Site Plan

C2-8

Fig 2.6

Water Balance Chart

C2-17

Fig 2.7

Flow Sheet of Sewage Treatment Plant

C2-19

CHAPTER - 3: DISCRIPTION OF THE ENVIRONMENT

Sl. No.

Contents

Page No.

3.1

Land Environment

C3-1

3.1.1

Land Use Pattern

C3-1

3.1.2

Geological Setting

C3-4

3.1.3

Soil Strata

C3-6

3.2

Air Environment

C3-8

3.2.1

Local Meteorology

C3-8

3.2.2

Climatology And Meteorology

C3-8

3.2.3

Ambient Air Quality Status

C3-16

3.3

Noise Environment

C3-20

3.3.1

Noise Level Survey

C3-20

3.3.2

Noise Level Monitoring

C3-20

3.4

Water Environment

C3-23

3.4.1

Ground Water Table

C3-23

3.4.2

Surface Water

C3-24

3.4.3

Water Quality

C3-24

3.5

Biological Environment

C3-27

3.5.1

Introduction

C3-27

3.5.2

Objectives And Methodology

C3-27

3.5.3

Baseline Ecological Data: Flora in And Around The

Study Site

C3-27

3.5.4

Baseline Ecological Data: Faunal Details

C3-29

3.6

Socio-Economic Environment

C3-30

(6)

Page 4 TABLE OF CONTENTS

A & N Technologies, Bengaluru

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

3.6.2

Places of Tourist Interest

C3-35

3.7

Solid Waste

C3-35

3.8

Hazardous Waste

C3-36

LIST OF TABLES

Sl. No.

Contents

Page No.

3.1

Soil Characteristics at the Project Site

C3-7

3.2

Meteorological Parameters Observed At Bengaluru City

During September 2015

C3-14

3.3

Meteorological Parameters Observed At Bengaluru City

During October 2015

C3-15

3.4

Air Analysis Method

C3-16

3.5

Ambient Air Quality Monitoring Locations

C3-17

3.6

Ambient Air Quality Parameters

C3-19

3.7

Noise Quality Monitoring Locations

C3-20

3.8

Measured Ambient Noise Levels db(A)

C3-22

3.9

Water Sampling Locations

C3-24

3.10

Baseline Ground Water Quality In The Sampling

Locations

C3-26

3.11

List of some floral species likely to be sighted in the

region

C3-29

3.12

List of Some Avifauna Likely To Be Sighted In The Region C3-30

3.13

Demographical Pattern

C3-32

LIST OF FIGURES

Sl. No.

Contents

Page No.

3.1

Revised Master Plan-2015

C3-3

3.2

General Land use And Cropping Pattern Of Bengaluru

District

C3-3

3.3

Geological Settings Of Bangalore District

C3-6

3.4

Temperature And Rainfall Pattern

C3-10

3.5

Wind rose Diagram

C3-13

3.6

Air Monitoring Locations

C3-18

3.7

Noise Monitoring Locations

C3-21

(7)

Page 5 TABLE OF CONTENTS

A & N Technologies, Bengaluru

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

3.9

Water Sampling Locations

C3-25

3.10

Comparative Size Of Population Of Districts 2011

C3-32

CHAPTER -4: ANTICIPATED ENVIRONMENTAL IMPACTS AND

MITIGATION MEASURES

Sl. No.

Contents

Page No.

4.1

Introduction

C4-1

4.2

Impact Identification Matrix

C4-2

4.3

Anticipated Impact During Construction Phase

C4-5

4.3.1

Impact On Land Environment

C4-5

4.3.1.1

Soil Substrata

C4-5

4.3.1.2

Land use

C4-5

4.3.1.3

Natural Drainage System

C4-5

4.3.2

Impact on Air Environment

C4-6

4.3.3

Impact On Noise Environment

C4-7

4.3.4

Impact On Water Environment

C4-7

4.3.5

Impact On Ecology

C4-8

4.3.6

Socio-Economic Environment

C4-8

4.3.7

Solid Waste & Environment

C4-9

4.3.7.1

Construction Wastes

C4-9

4.4

Impact Mitigation Measures During Construction

Phase

C4-10

4.5

Anticipated Impacts During Operation Phase

C4-12

4.5.1

Land Environment

C4- 12

4.5.1.1.

Impacts on Land Use Pattern

C4-12

4.5.1.2.

Impacts on Soil

C4-12

4.5.1.3.

Impacts on Natural Drainage Pattern

C4-13

4.5.2

Air Environment

C4-13

4.5.3

Water Environment

C4-14

4.5.4

Noise Environment

C4-14

4.5.4.1

Impact On Noise Levels

C4-14

4.5.4.2

Sources Of Noise

C4-14

4.5.5

Impacts On Ecology

C4-15

4.5.6

Impacts On Socio-Economic Aspects

C4-15

(8)

Page 6 TABLE OF CONTENTS

A & N Technologies, Bengaluru

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

4.5.8

Impacts On Natural Hazards

C4-16

4.6

Mitigation Measures During Operation Phase

C4-16

4.6.1

Land Environment

C4-16

4.6.2

Air Environment

C4-16

4.6.3

Water Environment

C4-17

4.6.4

Noise Environment

C4-17

4.6.5

Solid Waste Management

C4-18

4.6.6

Other Cumulative Mitigation Measures

C4-18

4.6.6.1

Greenbelt Development

C4-19

4.6.6.2

Strom Water Management

C4-21

LIST OF TABLES

Sl. No.

Contents

Page No.

4.1

Impact identification matrix

C4-2

4.2

Environmental impacts due to construction activities

C4-3

4.3

Environmental impacts during operation phase

C4-4

4.4

DG set detail and emission parameters of the air

pollution sources

C4-13

4.5

Quality of treated sewage for urban reuse

C4-17

4.6

List of species with numbers for the proposed project

C4-20

4.10

List of proposed shrubs & ground cover

C4-20

CHAPTER -5: SPECIFIC STUDIES

Sl. No.

Contents

Page No.

5.1

General

C5-1

5.2

Need of Alternatives

C5-1

5.3

Alternative Technology

C5-1

5.3.1

Transport

C5-1

5.3.2

Building Materials and Technologies

C5-1

5.3.3

Energy conservation

C5-3

(9)

Page 7 TABLE OF CONTENTS

A & N Technologies, Bengaluru

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

LIST OF TABLES

Sl. No.

Contents

Page No.

5.1

Energy Savings Details

C5-4

5.2

Thermal Characteristics Of Building

C5-4

CHAPTER -6: ENVIRONMENTAL MONITORING PROGRAM

Sl. No.

Contents

Page No.

6.1

Introduction

C6-1

6.2

Monitoring And Reporting Procedure

C6-2

6.2.1

Ambient Air Quality

C6-2

6.2.2

Ambient Noise Quality

C6-3

6.2.3

Water and Wastewater Quality

C6-3

6.2.4

Greenbelt Development

C6-4

6.3

Infrastructure for environmental protection

C6-4

6.4

Cost provision for environment management

C6-6

LIST OF TABLES

Sl. No.

Contents

Page No.

6.1

Quality Of Treated Sewage For Urban Reuse

C6-4

6.2

List of equipments used and test Method

C6-5

6.3

Post

Monitoring

Schedule

for

Environmental

Parameters

C6-5

6.4

Cost Towards Environmental Protection Measures

C6-6

CHAPTER -7: ADDITIONAL STUDIES

Sl. No.

Contents

Page No.

7.1

Risk Assessment and Management Plan

C7-1

7.2

Disaster Management Plan (DMP)

C7-5

7.3

Natural Resource Conservation

C7-6

7.4

Public Consultation

C7-7

(10)

Page 8 TABLE OF CONTENTS

A & N Technologies, Bengaluru

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

CHAPTER -8: PROJECT BENEFITS

Sl. No.

Contents

Page No.

8.1

General

C8-1

8.2

Improvement In The Physical Infrastructure

C8-1

8.3

Improvement In The Social Infrastructure

C8-4

8.4

Employment Potential

C8-5

8.5

Other Tangible Benefits

C8-6

CHAPTER -9: ENVIRONMENTAL MONITORIMG PROGRAM

Sl. No.

Contents

Page No.

9.1

Introduction

C9-1

9.2

EMP During Construction Phase

C9-2

9.2.1

Objectives

C9-2

9.2.2

Environmental Awareness Training Prior To

Commencing Work

C9-2

9.2.3

Demarcation of The Site

C9-3

9.2.4

Levelling And Site Clearance

C9-3

9.2.5

Transportation of Construction Materials

C9-4

9.2.6

Construction Activities

C9-5

9.2.7

Noise Pollution And Control

C9-6

9.2.8

Dust Pollution And Control

C9-7

9.2.9

Soil Erosion And Sedimentation And Its Control

C9-7

9.2.10

Materials Handling And Storage

C9-8

9.2.11

Waste Management

C9-9

9.2.11.1

Wastewater From Construction Activities

C9-8

9.2.11.2

Wastewater From Construction Labourers

C9-9

9.2.11.3

Solid Waste Management

C9-9

9.2.11.4

Disposal Of Excavated Earth And Demolished

Material

C9-10

9.2.12

Fire Protection

C9-10

9.2.13

Personnel Safety System

C9-10

9.2.14

Emergency Procedures

C9-11

9.3

EMP During Operation Phase

C9-12

9.3.1

Air Quality Management

C9-12

(11)

Page 9 TABLE OF CONTENTS

A & N Technologies, Bengaluru

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

9.3.3

Noise Quality Management

C9-14

9.3.4

Solid Waste Management

C9-15

9.3.5

Storm Water Management

C9-16

9.3.6

Transport Management

C9-16

9.3.7

Greenbelt Development

C9-16

9.3.8

Health Risk and Disaster Management

C9-17

9.4

EMP Implementation Schedule

C9-18

9.5

Environmental Monitoring Routines

C9-19

9.6

Environmental Legislations

C9-20

9.7

Environment Protection Act And Rules

C9-20

9.8

Environmental Statement

C9-23

LIST OF TABLES

Sl. No.

Contents

Page No.

9.1

Environmental Management During Levelling And Site

Clearance

C9-4

9.2

Environmental Management During Transportation

C9-5

9.3

Environmental Management During Construction

C9-6

9.4

Budgetary Allocation For EMP During Construction

C9-12

9.5

Air Quality Management During Operation Phase

C9-13

9.6

Water Quality Management During Operation Phase

C9-14

9.7

Noise Management During Operation Phase

C9-14

9.8

Implementation Schedule For EMP

C9-18

9.9

Post Monitoring Schedule For Environmental

Parameters

C9-19

9.10

Particulars of Environmental Legislations

C9-20

9.11

Notification Under Environmental Protection Act And

Rules

C9-20

9.12

Colour Code For the Manifest Copies

C9-22

(12)

Page 10 TABLE OF CONTENTS

A & N Technologies, Bengaluru

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

CHAPTER -10: SUMMARY & CONCLUSION

Sl. No.

Contents

Page No.

10.1

Executive Summary

C10-1

10.1.1

Introduction

C10-1

10.1.2

Project Description

C10-1

10.1.3

Description of The Environment

C10-1

10.1.4

Anticipated Environmental Impacts & Mitigation

Measures

C10-2

10.1.5

Specific Studies

C10-2

10.1.6

Environmental Monitoring Program

C10-3

10.1.7

Additional Studies

C10-2

10.1.8

Project Benefits

C10-3

10.1.9

Environmental Management Plan

C10-3

10.2

Conclusion On Executive Summary

C10-3

CHAPTER -11: DISCLOSURE OF CONSULTANTS ENGAGED

Sl. No.

Contents

Page No.

11.

Disclosure of Consultants Engaged

C11-1

CHAPTER -12: CORPORATE ENVIRONMENTAL RESPONSIBILITY

Sl. No.

Contents

Page No.

12.

Corporate Environmental Responsibility

C12-1

CHAPTER -13: ENCLOSURES

Sl. No.

Contents

Page No.

13.1

Conceptual Plan

C13-1

13.2

Questionnaire

C13-2

13.3

Photos

C13-7

(13)

Page 11 TABLE OF CONTENTS

A & N Technologies, Bengaluru

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

ANNEXURES

Sl. No.

Contents

Page No.

ANNEXURE I

National Ambient Air Quality Standards

(NAAQS)

1

ANNEXURE II

Indian Drinking Water Standards

(BIS: 10500:1991)

3

ANNEXURE III

Ambient Noise Standards

5

ANNEXURE IV

Recommended Per Capita Water Supply For

Designing Schemes

7

ANNEXURE V

Hydraulic Loading Applicable for Different

Soils

7

ANNEXURE VI

Hydraulic Conductivities of Soil

8

ANNEXURE VII

Criteria for Raw Water Used for Organized

Community Water Supplies (Surface and

Ground Water) Primary Parameters

10

ANNEXURE VIII

Use Based Classification of Surface Waters in

India

12

ANNEXURE IX

Water Requirements for Different Types of

Buildings

13

ANNEXURE X

KSPCB urban reuse standards for discharge of

domestic effluents

(14)
(15)

1 A & N Technologies, Bengaluru

M/s.PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

PROJECT AT A GLANCE

PROJECT AT A GLANCE

1. Project Type Development of Residential Apartment 2. Name & Contact Address of the

Project Proponents

M/s. Prestige Estates Projects Ltd.

The Falcon House, No.1, Main Guard Cross Road, Bengaluru-560 001.

3. Objective of the Project To provide a luxurious Residential apartment with modern amenities for comfortable living

4. Project Description Proposed Project is a development of Residential Apartment with a total built up area of 2, 02,155.21 m2 comprising 1,119 Nos. of units and a Club House in 6 blocks comprising of 12 towers with a club house.

Towers 1, 2, 11 & 12 are sprawled across B+G+17 Upper Floors with a height of 55.9m. Towers 3, 5, 6, & 7 are sprawled across 2B+G+17 Upper Floors with a height of 55.9m. Towers 4, 8, 9 & 10 are sprawled across 2B+G+18 Upper Floors with a height of 58.95m and the Club House is sprawled across G+2 Upper Floors with a height of 15m.

5. Project Location Development of Residential Apartment

At Sy. Nos. 115, 116 & 117,

Uttarahalli Village, Uttarahalli Hobli, Bengaluru South Taluk, Bengaluru. Latitude 12ᵒ53’44.86”N

Longitude 77ᵒ32’25.50”E 6. Estimated Duration of the Project Approx. 5 years 7. Estimated Cost of the Project Rs. 228.5 Crores

8. Total Site Area 64,445.9 Sqmt (15 Acres 37 Guntas) 9. Total Built-up area 2,02,155.21 Sqmt

10. Total Plinth Area 9,132.10 Sqmt (14.92 %) 11. Total Landscaping Area 47,607.99 Sqmt (77.76%) 12. Height of the Building 58.95 m

Resource Requirements: Construction Phase

(16)

2 A & N Technologies, Bengaluru

M/s.PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

PROJECT AT A GLANCE

14. Power Requirement 100 kVA DG set, 1 No. 15. Water requirement for

Construction activities

55 KLD

16. Domestic water requirement during Construction

7.5 KLD

17. Source of water for construction External authorised tanker water suppliers.

Resource Requirements: Operation Phase

18. Total Number of Residents 5,303 Numbers 19. Total Power requirements during

operation phase

Electricity: 6,633 kVA form BESCOM

Transformers: 500 kVA - 13 Nos. & 250 kVA - 3 Nos. 20. DG Sets for Power back up during

operation phase

750 kVA X 12 Nos.

DG Sets Fuel requirements 1,885 l/hr 21. Total water requirement during

operation phase

790 KLD

22. Net Fresh water requirement after recycling treated sewage for flushing

525 KLD

Environmental Setting

23. Baseline Study Area Area covering 10 km radius around the project sitewith project site as centre.

24. Baseline Study Period 3 months, October 2015, November 2015 & December 2015

25. Soil Type in the study area Sandy Silt

26. Water Quality Five ground water & One Surface water sample analysis results are tabulated in EIA report.

27. Ambient Air Quality In five stations including project site, ambient air quality analysis were carried out as per revised NAAQ standards 2009. Results are tabulated in EIA report.

28. Baseline Noise Levels Five noise sampling locations including project site were selected and analysis was carried out. Tabulated results are available in EIA report.

29. Nearest Highway SH-17 is at a distance of 7.5 km from the project site towards West direction. (Bengaluru – Mysuru)

(17)

3 A & N Technologies, Bengaluru

M/s.PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

PROJECT AT A GLANCE

30. Nearest Railway station Nayandanahalli Railway Station, which is around 10.4 km from the project site.

Bengaluru City Railway Station, which is around 13.7 km from the project site.

31. Nearest Airport Kempegowda International Airport is around 50.9 km from project site.

32. Nearest Lakes Subramanya Kere, 105 m from the project site 33. Nearest Town/City City - Bengaluru

34. Nearest Villages Gubbalala village (1.0 km towards SE)

Lingadheeranahalli village (1.4 km towards S) 35. Seismic Zone Seismic Zone - II

36. Archaeologically important Places None within 10 km radius 37. Protected areas as per Wildlife

Protection Act, 1972

None within 10 km radius

38. Reserved/ protected Forests Turahalli Forest is at a distance of 1km from the project site.

39. Defence Installations None within 10 km radius 40. Designated Land use of the Project

site

Residential Main Zone as per the Revised Master Plan of BDA-2015.

Environmental Management Plan: Construction Phase

41. Soil Erosion Contained by well-designed landscaping and greenbelt. 42. Noise Pollution from Construction

equipments

Acoustic measures for noisy equipments, most optimum number of operation by heavy equipments and limited construction activities during day time.

43. Quantity of Domestic sewage during construction

6.0 KLD

44. Mode of treatment and disposal of domestic sewage (construction)

Generated sewage will be collected in collection tank and will be lifted to BWSSB Sewage Treatment Plant for further treatment.

45. Air emissions from construction equipments

Optimal usage of equipments and use of high quality fuel like HSD.

46. Air Emissions and traffic volume due to raw materials transportation

 Vehicles carrying construction materials will be well covered to avoid any spillage.

(18)

4 A & N Technologies, Bengaluru

M/s.PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

PROJECT AT A GLANCE

maintained in good condition.

 Traffic of 15 trucks/ day would be made to ply during less traffic hours.

 Planning of optimal routes for the vehicles. 47. Labour Management Skilled labourers will be sourced locally.

Environmental Management Plan : Operational Phase

48. Quantity of Sewage generated 711 KLD

49. Mode of treatment for Sewage This sewage is treated in a sewage treatment plant of capacity 785 KLD to meet the quality of urban reuse standards.

50. Quantity of treated sewage and mode of disposal

Quantity of treated sewage: 785 KLD

Out of this, 265 KLD will be used for flushing, 207 KLD will be used for landscaping, and excess 313 KLD will be discharged to UGD.

51. Air & Noise pollution containment  DG sets meeting the emission norms prescribed by KSPCB will be used.

 Adequate stack height will be provided.

 Acoustic enclosures will be installed in order to attenuate the noise level.

 DG set will be installed in an area (utility section) where the access will be restricted.

52. Domestic Solid Wastes Total Quantity:2,390 kg/day Organic wastes: 1,195 kg/day Inorganic wastes: 1,195 kg/day

The generated solid waste will be segregated as biodegradable (organic) and non-biodegradable (inorganic) in each block and the organic wastes will be processed in an Organic Waste Converter and the inorganic wastes will be handed over to the authorized vendors for further processing.

Hazardous wastes like waste oil from DG sets, used batteries, CDs, computer etc. will be handed over to authorized hazardous waste recyclers.

(19)

5 A & N Technologies, Bengaluru

M/s.PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

PROJECT AT A GLANCE

E-Wastes will be picked by authorized E-Waste recyclers. 53. Sludge from STP 107 kg/day, which will be used as manure for gardening

purposes.

54. Hazardous wastes 4.4 l/ running hr of DG

Waste oil from DG sets will be given to KSPCB designated waste oil recyclers.

55. Optimal utilization of natural resources and non-conventional energy sources

Terrace runoff will be routed to roof rain water collection sump of capacity 165 cum and will be reused after pre-treatment. Surface runoff will be routed to 160 Nos. of recharge pits through internal garland drains to recharge the ground water and excess will be discharged to the existing storm water drain.

Energy conservation devices such as Solar geyser, street lights, LED light fixtures, High Frequency ballast, low loss transformers are proposed in the project.

56. Greenbelt development Native species are proposed for the greenbelt development.

(20)

1 M/s.PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

CONCEPTUAL PLAN

A & N Technologies, Bengaluru

CONCEPTUAL PLAN

M/s. Prestige Estates Projects Ltd., Bengaluru have proposed for the development of a residential apartment at Survey Nos. 115, 116 & 117, Uttarahalli Village, Uttarahalli Hobli, Bengaluru South Taluk, Bengaluruon a plot area of 64,445.9 Sqmt.The total built up area is 2, 02,155.21 Sqmt.The Proposed Project comprising 1,119 Nos. of units and a Club House in 6 blocks comprising of 12 towers and a club house. Towers 1, 2, 11 & 12 are sprawled across B+G+17 Upper Floors with a height of 55.9m. Towers 3, 5, 6, & 7 are sprawled across 2B+G+17 Upper Floors with a height of 55.9m. Towers 4, 8, 9 & 10 are sprawled across 2B+G+18 Upper Floors with a height of 58.95m and the Club House is sprawled across G+2 Upper Floors with a height of 15m.Ground coverage area achieved is 9,132.10 Sqmt i.e. 14.92% out of 55%, Landscape area is 47,607.99 Sqmt (77.76%), Drive way/ Ramp area is 1,871.22 Sqmt (3.06%) andarea reserved for Service Areas is 2,612.30 Sqmt (4.26%).The Achieved FAR is 2.2496 out of 2.25.

Total parking space proposed is for 1,549 Nos. of cars. Total water consumption is 790 KLD (Fresh water + recycling water). The total wastewater discharge is 711KLD. It is proposed to construct a Sewage Treatment Plant with capacity of 785 KLD (Sequencing Batch Reactor (SBR) Technology).It is proposed to construct a Roof Rain Water Harvesting Sump with a capacity of 165 cum and 160 nos. of Recharge pits. The Energy requirement for the project is 6,633 kVA. Diesel Generators of 750 kVA x 12 Nos. will be provided. The project cost is Rs. 228.50 Crores.

(21)

C1 Page 1

A & N Technologies, Bengaluru

CHAPTER I INTRODUCTION M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

1. INTRODUCTION

1.1 PREAMBLE

Environmental Protection and Sustainable Development have been the cornerstones of the policies and procedures governing the industrial and other developmental activities in India. Ministry of Environment, Forest & Climate Change has taken several policy initiatives and enacted environmental and pollution control legislations to prevent indiscriminate exploitation of natural resources and has promoted integration of environmental concerns in developmental projects. One such initiative is the Environmental Impact Notification S.O. 1533 (E), dated on 14th September

2006, as amended 2009, issued under Environment (Protection) Act, 1986, and has made it mandatory to obtain Environmental Clearance for specified categories of developmental projects.

EIA is an important tool for incorporating environmental concerns at the project level. It is a planning tool which is generally accepted as an integral component of sound decision-making. Its overall purpose is to establish a coherent policy and provide a basis for the co-ordinated work of various Government agencies with operational responsibility for the Environment & Natural resources. The objective of EIA is to foresee and address potential environmental problems/concerns at an early stage of project planning and design, early identification and characterization of critical environmental impacts allow the public and the Government to form a view about the environmental acceptability of a proposed developmental project and what conditions should apply to mitigate or reduce those risks and impacts.

1.1.1 PURPOSE AND NEED OF THE PROJECT

In the fast developing world these days the population is also increasing rapidly, so that the small towns and cities are changing into metropolitan cities. There is scarcity of land in the cities hence the real estate business is growing and expanding very fast.

Bengaluru is a major city of India and a great place to live. As Bengaluru is teeming with cash-rich young professionals with a considerable amount of disposable incomes; the retail sector has smelt a great opportunity and has increased the demand for residential property even more. Keeping in mind this rise in demand, property builders are making various types of accommodations including Apartments, Villas and Townships to cater to the needs of these clients.

With unparalleled increment of the IT sector in Karnataka capital, the demand has increased for both type of commercial and residential real estate leading in to existence of Bengaluru real estate, in the destination of the city and its nearby area. As a result, property

(22)

C1 Page 2

A & N Technologies, Bengaluru

CHAPTER I INTRODUCTION M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

builders in Bengaluru are growing towards boom for achieving success in the field of Bengaluru property market. They are making themselves reserve, building new, ever green and modern residential construction.

As far as residential properties in Bengaluru, present and future demand seems to have driven from IT professionals. However, this is also one of the leading reasons for the revival of demand for quality accommodation.

Bengaluru is one of the fast growing cities in Asia and one of the most sought after cities in India by people, companies, multinationals and tourists. The population of Bengaluru has grown enormously on account of migration of people from all corners of India. The one that needs to be tackled immediately is housing. In view of this, M/s. Prestige Estates Projects Ltd. has come forward to provide residential market, which is witnessing several premium residential apartment projects. A variety of projects are being launched by the developers offering amenities for luxurious and comfortable living.

In response to the growing demands of residential properties with all features and amenities, M/s. Prestige Estates Projects Ltd is coming up with a development of Residential Apartment at Sy. Nos. 115, 116 & 117 of Uttarahalli Village, Uttarahalli Hobli, Bengaluru South Taluk, Bengaluru with a total built up area of 2, 02,155.21 m2.

As per the schedule of EIA Notification - 2006; the proposed project comes under item 8(b) and apprised as B1 (since BUA ≥ 1, 50,000 SQMT ++).

Therefore, In order to assess the potential environmental impacts arising due to the proposed residential apartment project, M/s. Prestige Estates Projects Ltd. has appointed M/s. A & N Technologies, Bengaluru to undertake Environmental Impact Assessment (EIA) study which covers a wide range of technical disciplines and incorporates baseline data for various environmental components, viz. air, water, noise, land, water quality & hydrology, ecology & biological parameters along with the parameters of human interest for the Environmental Impacts Assessment and to prepare Environmental Management Plan (EMP) for mitigating the adverse impacts along with improvement and alternatives including delineation of Post Project Environmental Monitoring programme.

The report presents baseline data collected for the month of October 2015 to December 2015 for air, water, noise, soil including biological and socio-economic components of environment for an area covering 10km radius with project site as centre.

(23)

C1 Page 3

A & N Technologies, Bengaluru

CHAPTER I INTRODUCTION M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

1.2 IDENTIFICATION OF THE PROJECT

1.2.1 IDENTIFICATION OF THE PROJECT

In an effort to fulfil the increasing demand of dwelling units, the promoter -“Prestige Group” came into being with the sole aim of providing quality residential units, for the people of different strata. One of such projects, envisioned by M/s. Prestige Estates Projects Ltd. is being proposed to develop a residential apartment at Sy. Nos. 115, 116 & 117 of Uttarahalli Village, Uttarahalli Hobli, Bengaluru South Taluk, Bengaluru. The total extent of land is 64,445.9 Sqmt. The total built up area amounts to 2, 02,155.21 Sqmt, comprising 1,119 Nos. of units and a Club House in 6 blocks comprising of 12 towers and a club house. Towers 1, 2, 11 & 12 are sprawled across B+G+17 Upper Floors with a height of 55.9m. Towers 3, 5, 6, & 7 are sprawled across 2B+G+17 Upper Floors with a height of 55.9m. Towers 4, 8, 9 & 10 are sprawled across 2B+G+18 Upper Floors with a height of 58.95m and the Club House is sprawled across G+2 Upper Floors with a height of 15m with sufficient area earmarked for landscape, roads and service areas etc.

1.2.2 PROFILE OF THE PROMOTERS

‘The Prestige Group’ - Add Prestige to your life...

Beginning with a retail business and growing to become one of the most trusted names in real estate, The Prestige Group has come a long way. It was one man's dream, his grit and foresight that laid the firm foundations of Prestige, way back in 1956. Mr. Razack Sattar - the visionary who glimpsed what others would comprehend many years later - and the founder of what is today the Prestige Group of Companies. The grand old man of retailing, endowed with unmatched business acumen, sowed the seeds of high quality retailing in Bengaluru with Prestige on Commercial Street. Having started with custom tailoring and retailing ready-to-wear garments, today the company scores skylines with innumerable constructions. The repertoire of completed developments of the Prestige Group spans the residential, commercial and hospitality space. A success story truly made possible by the founder's progeny - Irfan, Rezwan, Noaman and Anjum who have been groomed into great leaders and continue to uphold the Prestige vision.

Over the last two decade, The Prestige Group has firmly established itself as one of the leading and most successful developers of real estate in South India by imprinting its indelible mark across all asset classes.

Having completed 184 Projects spanning a total developed area of over 60.74 million Sq.ft, It also has another 57 ongoing projects comprising around 59.24 million Sq.ft & 43 upcoming

(24)

C1 Page 4

A & N Technologies, Bengaluru

CHAPTER I INTRODUCTION M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

projects totalling 44.11 million Sq.ft., which include Apartment Enclaves, Shopping Malls and Corporate Structures, spread across all asset classes.

Prestige Constructions, an ISO 9001:2000 certified company is the only Real Estate Developer in Bengaluru to have won the reputed FIABCI Award for its software and residential facilities. Prestige was also recently awarded the Crisil DA1 Developer Rating in recognition of the quality of their projects and the ability to deliver completed projects in a timely manner, making it a trusted name in the construction industry.

The FIABCI Prix d' Excellence Award & 15 Awards across various categories at the recently concluded International Property Awards, Asia Pacific 2012-13, only serve as testimony to Prestige's work, making them a trusted name in the Real Estate sector.

Vision

To continuously exceed the expectations of customers and employees and become a benchmark for quality in every field the Prestige Group ventures into.

Mission

To improve customer experiences through constant innovation and understanding, with a focus on quality and transparency of processes so that when it comes to prestige, customers come to expect nothing but the best.

Goals & Objectives

Providing a broad spectrum of integrated solutions.

Meeting and exceeding customer needs and expectations.

Adopting the latest technologies to deliver state-of- the-art developments with great care and detailing.

Ensuring conservation and development of eco-friendly projects.

Making continuous improvement in all areas of activity based on customer inputs in order to improve customer satisfaction.

(25)

C1 Page 5

A & N Technologies, Bengaluru

CHAPTER I INTRODUCTION M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

1.3 BRIEF DESCRIPTION OF THE PROJECT

1.3.1 PROJECT SETTINGS

Bengaluru district is the smallest district of Karnataka state with a total geographical area of 2,208 sq. km. But population wise, it stands first with 1, 06,12,474 souls as per the census of 2011 with a density of 4,381 people per sq. km. with 15.75% share to the total population of the state. Bengaluru is known as the "Silicon Valley of India" and “IT hub of Asia” because of its role as the nation's leading information technology (IT) exporter. Being the headquarters of the state, the city is the chief administrative center clustered with numerous state and divisional level government departments and offices associated with the legislative, executive and judicial winds of administration. Bengaluru's INR 523 billion economy (2006-07 Net District Income) with an economic growth rate of 10.3% makes it one of the major economic centres in India. Bengaluru is the second fastest growing major metropolis in India after New Delhi. The growth of the IT sector has presented the city with unique challenges.

The district lies stretched between the latitudinal parallels of 12 deg 31 min N and 12 deg 54 min N on one hand and the longitudinal meridians of 77 deg 22 min E and 77 deg 52 min E on the other. The maximum distance from the southern tip to the northern tip is about 60 km and that between the western and eastern tips is about 55 km, the district lies in the southern maidan region of the state and is by and large an open country which is lacking in natural barriers.

Bengaluru is divided into two districts; Bengaluru Urban and Bengaluru Rural. Bengaluru urban district has a total population of 96, 21,551 i.e. 91% of the total population of Bengaluru. At the center of the district is the Bruhat Bengaluru Mahanagara Palike with a total area of 741 sq. km. wherein the population is nearly 84 lakhs. It consists of 17 hoblies, 86 Grama Panchayaths, 16 cities/towns, 699 villages, 198 wards, 9 municipal corporations and four taluks: Bengaluru North, Bengaluru East, Bengaluru South and Anekal. The city has a literacy rate of 87.67%. (Source: District at a glance 2013-14)

Bengaluru South taluk has a total geographical area of 381 sq. kms with a population of 91,800 according to the population census of 2001. The taluk has 4 hoblies and 15 grama panchayaths and literacy rate of 71.60%. (Source: District at a glance 2013-14)

The proposed project is a Residential Apartment which is located at Uttarahalli Village, Uttarahalli Hobli which is about 15.5 km from Bengaluru City (M G Road). The latitude and longitude of the site is 12ᵒ53’44.86”N and 77ᵒ32’25.50”E respectively. The nearest railway station is Nayandanahalli Railway Station, which is around 10.4 km from the project site and Bengaluru City Railway station, which is around 13.7 km from the project site and Kempegowda International Airport is around 50.9 km from project site.

(26)

C1 Page 6

A & N Technologies, Bengaluru

CHAPTER I INTRODUCTION M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

1.3.2 CLIMATE

Bengaluru is considered to be climatically a well favoured district which is free from extremes, being situated in the heart of South Deccan of Peninsular India. Physically its situation is of considerable significance as it is on a ridge-top running through the middle of the Mysore plateau from west to east, at an average elevation of 920 m. The climate is classed as the seasonally dry tropical savanna climate with four seasons. The dry season with clear bright weather is from December to February. The summer season from March to May is followed by the south – west monsoon season from June to September. October and November constitute the post-monsoon or retreating monsoon season. Other important features are the pre-dominant low clouding and the more or less steady temperatures with small diurnal variation during the whole monsoon season and the early morning dew and mist or fog during the months of October to February.

April is usually the hottest month with the mean daily maximum temperature at 33.4° C and the mean daily minimum at 21.2° C. On individual days, in hot season, the day temperatures often go above 36° C. With the onset of the monsoon early in June, there is appreciable drop in the day temperature but that in night temperature is only slight. In October, the temperatures are as in the south-west monsoon season. Thereafter, temperature starts decreasing. December is generally the coolest month with the mean daily maximum temperature at 22.2° C and the mean daily minimum at 9.4° C. The highest maximum temperature recorded at Bengaluru is 38.9° C in 22nd May, 1935.

The lowest minimum was 7.8° C on 13th January, 1884.

The mean monthly relative humidity is the lowest in the month of March (44%), the morning and evening observations being 63% & 24% respectively. Relative humidity is high during the period June to October, being between 80% and 85% on the average.

The average rainfall of Bengaluru urban district in the year 2015 was 1061.9 mm, which was 22% more than the normal rainfall of 870 mm. Bengaluru has three different rainy periods covering eight months of the year, followed closely one after the other. Of these, June to September is the principal rainy season. About 41.3% of the total annual rainfall is received in the south-west monsoon period (June-September) with a rainfall of 437.6 mm and about 32% of the total annual rainfall is received in the post monsoon period (October to December) with a rainfall of 341.8 mm and about 26% of the total annual rainfall is received in the pre monsoon period (March to May) with a rainfall of 274.8 mm and about 0.7% of the total annual rainfall is received in the winter season (January to February) with a rainfall of 7.7 mm. (Source: IMD)

The surface winds over Bengaluru have a fairly clear cut seasonal character with easterly components predominating in one period and westerly components in the other. During the period May to September, the wind direction is WSW to W whileduring the period of November to March, they are ENE to ESE. April and October are transition months when the change over from the easterly to the westerly wind regime and vice versa take place.

(27)

C1 Page 7

A & N Technologies, Bengaluru

CHAPTER I INTRODUCTION M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

In November and December some of the storms and depressions which originate in the Bay of Bengal move westwards causing widespread heavy rain and gusty winds in the district. Thunder storms occur during the period of February to November, the highest incidence being in April-May and September-October.

(28)

C1 Page 8

A & N Technologies, Bengaluru

CHAPTER I INTRODUCTION M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

1.4 NATURE & SIZE OF THE PROJECT

Proposed development of Residential Apartment is coming up with a total site area of15 Acres 37 Guntas (64,445.9 Sqmt). The total built up area of the project amounts to 2, 02,155.21 Sqmt with sufficient area earmarked for landscape, internal drive way, car parking and for other services & utilities. Proposed Residential Apartment comprises of components such as Club house, Swimming Pool, children’s play area, seating plaza, play courts, landscape and garden.

1.5 IMPORTANCE TO THE COUNTRY & REGION

Residential construction activity in country is a key component of economic growth, employment, and income. Construction is the second largest industrial activity after agriculture in terms of value and employment. The economy relies on construction activities for progress and growth.

The construction industry in both developed and developing countries may be viewed as that sector of the economy which, through planning, design, construction, maintenance, repair, and operation, transforms various resources into constructed facilities. The types of public and private facilities produced range from residential and non-residential buildings to heavy construction, and these physical facilities play a critical and highly visible role in the process of development.

Construction contributes to economic development of a country and to a particular region by satisfying some of the basic objectives of development including output generation, employment creation and income generation and re-distribution. It also plays a major role in satisfying basic physical and social needs, including the production of shelter, infrastructure, and consumer goods.

Some of the important features of such developments are;

 Construction requirements for goods and services from other industries are considerable; the development of the construction industry therefore stimulates these ancillary industries, thus encouraging further economic growth.

 The construction industry has to purchase something from material supplier, hire equipments from plant supplier and pay the labour as the wages in order to construct the work; in the meanwhile industry has to pay tax to the government when they finish their work there by augment the economic growth of the country.

 Construction industry as a whole is largely made up of small firms; it provides entrepreneurial opportunities for many small businessmen, thereby helping to re-distribute income.

(29)

C1 Page 9

A & N Technologies, Bengaluru

CHAPTER I INTRODUCTION M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

 It also employs a large number of people (directly and indirectly) and therefore has an effect on the economy of a country/region during the actual construction process.

 The construction investment can be an important public policy tool which often accelerate development and create employment.

 It stimulates other similar developments in the locality and also raises the demand for other commercial and industrial developments.

 It raises the living conditions of the citizens of that particular locality and of the country.

1.6 SCOPE OF ENVIRONMENTAL IMPACT ASSESSMENT

The study includes a detailed characterization of existing status of the environment in an area of 10 km radius around proposed project site for various identified environmental components viz. Air, Noise, Water, Land, Biological and Socio-economic. Under the scope of EIA, it is envisaged:

 To assess the present status of air, noise, water, land, biological and socio-economic components of environment.

 To identify, quantify and evaluate significant impacts of operations on various environmental components.

 To evaluate proposed pollution control measures and delineate Environmental Management Plan (EMP) outlining additional control measures to be adopted for mitigation of adverse impacts.

 To delineate post-project environmental quality monitoring programme to be pursued by M/s. Prestige Estates Projects Ltd.

1.7 APPLICABLE ENVIRONMENTAL REGULATIONS

With respect to prevention and control of Environmental Pollution, the proposed project is governed by the following Acts and Rules.

 Water (Prevention and Control of Pollution) Act, 1974 as amended in 1978 and 1988;

 Air (Prevention and Control of Pollution) Act, 1981 as amended in 1987;

 Environment (Protection) Act, 1986 amended 1991 and Environment (Protection) Rules, 1986 and amendments;

 Hazardous Waste (Management & Handling) Rules, 1989, as amended in 2000, 2003.

 The Noise Pollution (Regulation and Control) Rules, 2000 and as amended in 2002, 2006 and 2010.

(30)

C1 Page 10

A & N Technologies, Bengaluru

CHAPTER I INTRODUCTION M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

 EIA notification dated 07.07.2004 as amended in 14.09.2006, 01.12.2009 and 22.12.2014. Stating that for any project or activity specified in category ‘B’ in item 8 of the schedule i.e. building/construction projects/ area development projects and townships crossing built up area of 1, 50,000 sqmt, TOR should be conveyed to SEIAA, based on the approved TOR, EIA studies should be conducted which also includes an Environmental Management Plan for the mitigation of these impacts.

(31)

C2 Page 1

A & N Technologies, Bengaluru

CHAPTER-II PROJECT DESCRIPTION

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU ENVIRONMENTAL IMPACT ASSESSMENT

FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

2. PROJECT DESCRIPTION

This chapter encompasses the details of the proposed project, materials and resource requirements during construction and operation phases, utilities, sources of waste generation, estimation of pollution loads and associated infrastructures and so forth.

2.1. BACKGROUND DETAILS OF THE PROJECT

2.1.1. TYPE OF THE PROJECT

M/s. Prestige Estates Projects Ltd. is being proposed to develop a Residential Apartment at

Uttarahalli Village, Uttarahalli Hobli, Bengaluru South Taluk, Bengaluru. The proposed project

provides residential dwellings of about 1,119 units, which will meet the demand of growing

population in Bengaluru.

The proposed Residential Apartment project comprises of 6 building blocks which are,

 Building – 1 with three Towers, Tower 1 & 2 sprawled across B+G+17UF and Tower 3

sprawled across 2B+G+17UF with maximum height of 55.9m.

 Building – 2 with single tower, Tower 4 sprawled across 2B+G+18UF with maximum height of

58.95m.

 Building – 3 with three Towers, Tower 5, 6 and 7 sprawled across 2B+G+17UF with maximum

height of 55.9m.

 Building – 4 with three Towers, Tower 8, 9 and 10 sprawled across 2B+G+18UF with

maximum height of 58.95m.

 Building – 5 with two Towers, Tower 11 & 12 sprawled across B+G+17UF with maximum

height of 55.9m.

 Building – 6 consists of a single tower which is a Club House, sprawled across G+2UF with

maximum height of 15.0m.

2.1.2. NEED FOR THE PROJECT

In the fast developing world; these days the population is also increasing rapidly, so that the small towns and cities are changing into metropolitan cities there is scarcity of land in the cities and the business is growing and expanding very fast.

Bengaluru is one of the major cities of India and a great place to live. As Bengaluru is teeming with cash-rich young professionals with a considerable amount of disposable incomes; the retail sector has smelt a great opportunity and has increased the demand for residential property even

(32)

C2 Page 2

A & N Technologies, Bengaluru

CHAPTER-II PROJECT DESCRIPTION

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU ENVIRONMENTAL IMPACT ASSESSMENT

FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

more. Keeping in mind this rise in demand, property builders are making various types of accommodations including Apartments, Villas and Townships to cater to the needs of these clients.

With the unparalleled increment of the IT sector in Karnataka capital, the demand has increased for both type of commercial and residential real estate for leading in to existence of Bengaluru real estate, in the destination of the city and its nearest area. As the result, property builder in Bengaluru are growing towards boom for achieving success in the field of Bengaluru property market. They are making themselves reserve, building new, ever green and modern residential construction.

By considering all these factors, M/s. Prestige Estates Projects Ltd., has come forward to provide Residential Apartment with a Club House.

2.1.3. LOCATION OF THE PROJECT

The proposed Development of Residential Apartment project is located at Uttarahalli Village, Uttarahalli Hobli, Bengaluru South Taluk, Bengaluru of Karnataka. The environmental setting of the project site is given in the below Table 2.1.

(33)

C2 Page 3

A & N Technologies, Bengaluru

CHAPTER-II PROJECT DESCRIPTION

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU ENVIRONMENTAL IMPACT ASSESSMENT

FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

TABLE 2.1: ENVIRONMENTAL SETTING OF THE SITE

Sl. No. Particulars Details

1.

Project Location

Village Uttarahalli

Taluk Bengaluru South

District Bengaluru

State Karnataka

2. Plant site co-ordinates Latitude : 12ᵒ53’44.86”N

Longitude : 77ᵒ32’25.50”E

3. Survey of India topo sheet No. 57 H 09

4. Site topography

The Project Site consists of few shrubs. These will be cleared during site preparation. Other than this the proposed site is a vacant land. The site is sloping from South to North direction with an average contour level difference of 10m.

5. Nearest Highway SH-17 is at a distance of 7.5 km from the project

site.

6. Nearest Railway station

Nayandanahalli Railway Station, which is around 10.4 km from the project site.

Bengaluru City Railway station, which is around 13.7 km from the project site.

7. Nearest Airport Kempegowda International Airport is around

50.9 km from project site.

8. Nearest Lakes Subramanya Kere, 105 m from the project site

9. Nearest Town/City City - Bengaluru

10. Nearest Villages Gubbalala village (1.0 km towards SE)

Lingadheeranahalli village (1.4 km towards S)

11. Seismic Zone Seismic Zone – II

12. Archaeologically important Places None within 10 km radius

13. Protected areas as per Wildlife

Protection Act, 1972

None within 10 km radius

14. Reserved/ protected Forests Turahalli Forest is at a distance of 1km from the

project site.

(34)

C2 Page 4

A & N Technologies, Bengaluru

CHAPTER-II PROJECT DESCRIPTION

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU ENVIRONMENTAL IMPACT ASSESSMENT

FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

FIG 2.1: LOCATION OF THE PROPOSED PROJECT SITE

Project

Site

(35)

C2 Page 5

A & N Technologies, Bengaluru

CHAPTER-II PROJECT DESCRIPTION

M/s. PRESTIGE ESTATES PROJECTS LTD., BENGALURU ENVIRONMENTAL IMPACT ASSESSMENT

FOR THE PROPOSED RESIDENTIAL APARTMENT AT SURVEY NOS. 115, 116 & 117, UTTARAHALLI VILLAGE, UTTARAHALLI HOBLI, BENGALURU SOUTH TALUK, BENGALURU.

FIG 2.2: TOPO MAP COVERING 10 km RADIUS

10 km PROJECT SITE Scale: 1cm: 0.5km 20cm: 10km SURVEY OF INDIA: TOPO SHEET NO: 57 H/9 & 57 H/5

Figure

FIG 1.1: LOCATION OF THE PROPOSED PROJECT SITE
TABLE 2.1: ENVIRONMENTAL SETTING OF THE SITE
FIG 2.1: LOCATION OF THE PROPOSED PROJECT SITE
FIG 2.2: TOPO MAP COVERING 10 km RADIUS
+7

References

Related documents

The major difference between illness and mortality shocks is that a death of a household member does not only induce direct costs such as medical and funeral costs and possibly a loss

However, to keep the goal of free trade in mind, Frankel suggests “to extend the privileges of regional arrangements from two-country agreements (…) to a wider subcontinental

The standard approach to statistical inference based on robust regression methods is to derive the limiting distribution of the robust estimator from assumption (1.2), and to

the impact of pre-infection vaccines in adolescent, 24 high risk, 18 or all-ages mass vaccination campaigns or routine immunization. 12,20,21,28,29 Post-infection vaccines have

Whilst this study involves looking at the effects of cooperative and competitive playing methods on cooperative behaviour as in Bay-Hintz et al.’s (1994) study, this study

Through this research, we have assessed case-by-case analyses of the construction of sectarianism in Iraq and Syria from the early twentieth century when the Syrian and

While some of the description and discussion of curriculum design is general, the focus of this paper is on English as a second language (ESL) curriculum. I will briefly describe

Business strategy is a very important component in an attempt to compete with other companies with business strategy, including determination of strategy of